[Federal Register Volume 80, Number 220 (Monday, November 16, 2015)]
[Notices]
[Pages 70779-70780]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-29158]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13318-003]
Swan Lake North Hydro LLC; Notice of Application Tendered for
Filing With the Commission and Soliciting Additional Study Requests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Unconstructed major project.
b. Project No.: 13318-003.
c. Date filed: October 28, 2015.
d. Applicant: Swan Lake North Hydro LLC.
e. Name of Project: Swan Lake North Pumped Storage Hydroelectric
Project.
[[Page 70780]]
f. Location: Approximately 11 miles northeast of the City of Klamath
Falls, Klamath County, Oregon. The proposed project boundary would
include about 730 acres of federal land managed by the U.S. Bureau of
Land Management.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. Sec. Sec.
791(a)-825(r).
h. Applicant Contact: Joe Eberhardt, EDF-Renewable Energy, 1000 SW
Broadway Ave., Ste. 1800, Portland, OR 97205; Phone: (503) 889-3838.
i. FERC Contact: Dianne Rodman, [email protected]; phone:
(202) 502-6077.
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item l below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See, 94 FERC ]
61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and serve a copy of
the request on the applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: December 27, 2015.
The Commission strongly encourages electronic filing. Please file
additional study requests and requests for cooperating agency status
using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support
at [email protected], (866) 208-3676 (toll free), or (202)
502-8659 (TTY). In lieu of electronic filing, please send a paper copy
to: Secretary, Federal Energy Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first page of any filing should include
docket number P-13318-003.
m. The application is not ready for environmental analysis at this
time.
n. The proposed project would be a closed-loop system using
groundwater for initial fill and consist of the following new
facilities: (1) A 7,972-foot-long earthen embankment forming a
geomembrane-lined upper reservoir with a surface area of 64.21 acres
and a storage capacity of 2,568 acre-feet at a maximum surface
elevation of 6,135 feet above mean sea level (msl); (2) a 8,003-foot-
long earthen embankment forming a geomembrane-lined lower reservoir
with a surface area of 60.14 acres and a storage capacity of 3,206
acre-feet at a maximum surface elevation of 4,457 feet msl; (3) a 500-
foot-long, rip-rap lined trapezoidal spillway built into the crest of
each embankment; (4) a 0.5-percent slope perforated polyvinyl chloride
tube of varying diameter and accompanying optical fiber drainage system
designed to detect, collect, and monitor water leakage from the
reservoirs; (5) a 25-inch-diameter bottom outlet with manual valve for
gravitational dewatering of the lower reservoir; (6) an upper intake
consisting of a bell mouth, 38.6-foot-wide by 29.8-foot-long inclined
screen, head gate, and 13.8-foot-diameter foundational steel pipe; (7)
a 36.5-foot-diameter, 9,655-foot-long steel high-pressure penstock from
the upper reservoir to the powerhouse that is predominantly above
ground with a 14-foot-long buried segment; (8) three 9.8-foot-diameter,
1,430-foot-long steel low-pressure penstocks from the lower reservoir
to the powerhouse that are predominantly above ground with a 78-foot-
long buried segment; (9) a partially-buried powerhouse with three
131.1-megawatt (MW) reversible pump-turbine units with a total
installed capacity of 393.3 MW; (10) a 32.8 mile, 230-kilovolt above-
ground transmission line interconnecting to an existing non-project
substation; (11) approximately 10.7 miles of improved project access
road; (12) approximately 3.4 miles of new permanent project access
road; (13) approximately 8.3 miles of temporary project access road;
and (14) appurtenant facilities. The project would generate about 1,187
gigawatt-hours annually.
o. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at http://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
p. Procedural schedule: The application will be processed according
to the following preliminary Hydro Licensing Schedule. Revisions to the
schedule will be made as appropriate.
Issue Notice of Acceptance--March 2016
Issue Scoping Document 1 for comments--April 2016
Comments on Scoping Document 1--June 2016
Issue Scoping Document 2--July 2016
Issue notice of ready for environmental analysis--July 2016
Commission issues draft EIS--December 2017
Comments on draft EIS--February 2017
Commission issues final EIS--June 2017
Dated: November 9, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-29158 Filed 11-13-15; 8:45 am]