[Federal Register Volume 80, Number 154 (Tuesday, August 11, 2015)]
[Notices]
[Pages 48097-48098]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-19686]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. CP09-6-001; CP09-7-001; Docket No. CP13-507-000]
LNG Development Company, LLC; Oregon Pipeline Company, LLC;
Northwest Pipeline LLC; Notice of Availability of the Draft
Environmental Impact Statement for the Proposed Oregon LNG Terminal and
Pipeline Project and Washington Expansion Project
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) has prepared a draft environmental impact statement (EIS)
for the Oregon LNG Terminal and Pipeline Project (Oregon LNG Project)
proposed by LNG Development Company, LLC and Oregon Pipeline Company,
LLC (collectively referred to as Oregon LNG) and the Washington
Expansion Project proposed by Northwest Pipeline LLC (Northwest) in the
above-referenced dockets. Oregon LNG requests authorization under
Section 3 of the Natural Gas Act (NGA) to site, construct, and operate
an import/export liquefied natural gas (LNG) terminal in Warrenton,
Oregon. Oregon LNG also requests a Certificate of Public Convenience
and Necessity (Certificate) pursuant to Section 7(c) of the NGA to
construct and operate a natural gas pipeline from the proposed LNG
terminal to an interconnect with the interstate transmission system of
Northwest near Woodland, Washington. Northwest requests a Certificate
pursuant to Section 7(c) of the NGA to expand the capacity of its
existing natural gas transmission facilities between Woodland and
Sumas, Washington. The primary purpose of the projects is to export an
equivalent of about 456 billion cubic feet per year of natural gas to
foreign markets.
The draft EIS assesses the potential environmental effects of the
construction and operation of the Oregon LNG and Washington Expansion
Projects in accordance with the requirements of the National
Environmental Policy Act (NEPA). The FERC staff concludes that approval
of the proposed projects would result in some adverse environmental
impacts; however, most of these impacts would be reduced to less-than-
significant levels with the implementation of Oregon LNG's and
Northwest's proposed mitigation and the additional measures recommended
in the draft EIS.
The U.S. Environmental Protection Agency, U.S. Army Corps of
Engineers, U.S. Fish and Wildlife Service, U.S. Coast Guard, U.S.
Department of Energy, and U.S. Department of Transportation's Pipeline
and Hazardous Materials Safety Administration participated as
cooperating agencies in the preparation of the EIS. Cooperating
agencies have jurisdiction by law or special expertise with respect to
resources potentially affected by the proposal and participate in the
NEPA analysis. Although the cooperating agencies provided input to the
conclusions and recommendations presented in the draft EIS, the
agencies will present their own conclusions and recommendations in
their respective records of decision or determinations for the
projects.
The draft EIS addresses the potential environmental effects of the
construction and operation of the following facilities associated with
the Oregon LNG Project:
One marine terminal with a ship berth for one LNG marine
carrier;
two full-containment storage tanks, each designed to store
160,000 cubic meters of LNG;
natural gas pretreatment facilities;
two liquefaction process trains, regasification
facilities, and other related terminal support structures and systems;
an 86.8-mile-long, 36-inch-diameter bidirectional
pipeline; and
one 40-megawatt (MW), 48,000-horsepower (hp) electrically
driven gas compressor station.
For the Washington Expansion Project, the draft EIS addresses the
potential environmental effects of the construction and operation of:
140.6 miles of 36-inch-diameter pipeline loop \1\ along
Northwest's existing pipeline in 10 noncontiguous segments;
---------------------------------------------------------------------------
\1\ A pipeline loop is a segment of pipe constructed parallel to
an existing pipeline to increase capacity.
---------------------------------------------------------------------------
ancillary pipeline facilities; and
96,000 hp of additional compression at five existing
compressor stations.
Northwest's project would also include abandonment and removal of
existing pipeline and aboveground facilities.
The FERC staff mailed copies of the draft EIS to federal, state,
and local government representatives and agencies; elected officials;
environmental and public interest groups; Native American tribes;
potentially affected landowners; other interested individuals and
nongovernmental organizations; newspapers and libraries in the project
area; and parties to these proceedings. Paper copy versions of this EIS
were mailed to those specifically requesting them; all others received
a compact disk version. In addition, the draft EIS is available for
public viewing on the FERC's Web site (www.ferc.gov) using the eLibrary
link. A limited number of hardcopies are available for distribution and
public inspection at: Federal Energy Regulatory Commission, Public
Reference Room, 888 First Street NE., Room 2A, Washington, DC 20426,
(202) 502-8371.
Any person wishing to comment on the draft EIS may do so. To ensure
consideration of your comments on the proposal in the final EIS, it is
important that the Commission receive your comments on or before
October 6, 2015.
For your convenience, there are four methods you can use to submit
your comments to the Commission. In all instances, please reference the
project docket numbers (CP09-6-001, CP09-7-001, and CP13-507-000) with
your submission. The Commission encourages electronic filing of
comments and has expert staff available to assist you at (202) 502-8258
or [email protected].
(1) You can file your comments electronically using the eComment
feature on the Commission's Web site (www.ferc.gov) under the link to
Documents and Filings. This is an easy method for submitting brief,
text-only comments on a project.
(2) You can file your comments electronically by using the eFiling
feature on the Commission's Web site (www.ferc.gov) under the link to
Documents and Filings. With eFiling, you can provide comments in a
variety of formats by attaching them as a file with your submission.
New eFiling users must first create an account by clicking on
``eRegister.'' If you are filing a comment on a particular project,
[[Page 48098]]
please select ``Comment on a Filing'' as the filing type.
(3) You can file a paper copy of your comments by mailing them to
the following address: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE., Room 1A, Washington, DC
20426.
(4) In lieu of sending written or electronic comments, the
Commission invites you to attend one of the public comment meetings its
staff will conduct during the draft EIS comment period and in the
project area to receive comments on the draft EIS. We encourage
interested groups and individuals to attend and present oral comments
on the draft EIS. Transcripts of the meetings will be available for
review in eLibrary under the project docket numbers. A notice of
meeting times and locations will be sent to the environmental mailing
list and posted on the FERC eLibrary.
Any person seeking to become a party to the proceeding must file a
motion to intervene pursuant to Rule 214 of the Commission's Rules of
Practice and Procedures (Title 18 Code of Federal Regulations Part
385.214).\2\ Only intervenors have the right to seek rehearing of the
Commission's decision. The Commission grants affected landowners and
others with environmental concerns intervenor status upon showing good
cause by stating that they have a clear and direct interest in this
proceeding that no other party can adequately represent. Simply filing
environmental comments will not give you intervenor status, but you do
not need intervenor status to have your comments considered.
---------------------------------------------------------------------------
\2\ See the previous discussion on the methods for filing
comments.
---------------------------------------------------------------------------
Questions?
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC Web site (www.ferc.gov) using the eLibrary link. Click on the
eLibrary link, click on ``General Search,'' and enter the docket
number(s) excluding the last three digits in the Docket Number field
(i.e., CP09-6-001, CP09-7-001, and CP13-507-000). Be sure you have
selected an appropriate date range. For assistance, please contact FERC
Online Support at [email protected] or toll free at (866) 208-
3676; for TTY, contact (202) 502-8659. The eLibrary link also provides
access to the texts of formal documents issued by the Commission, such
as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription that allows you to keep track of all formal issuances and
submittals in specific dockets. This can reduce the amount of time you
spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
Dated: August 5, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-19686 Filed 8-10-15; 8:45 am]
BILLING CODE 6717-01-P