[Federal Register Volume 80, Number 139 (Tuesday, July 21, 2015)]
[Notices]
[Pages 43076-43077]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-17805]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP15-18-000]
Eastern Shore Natural Gas Company; Supplemental Notice of Intent
To Prepare an Environmental Assessment for the Proposed White Oak
Mainline Expansion Project and Request for Comments on Environmental
Issues
On January 22, 2015, the Federal Energy Regulatory Commission (FERC
or Commission) issued in Docket No. CP15-18-000 a Notice of Intent to
Prepare an Environmental Assessment for the Proposed White Oak Mainline
Expansion Project and Request for Comments on Environmental Issues
(NOI). Since its application in the above-referenced docket, FERC staff
has requested information regarding the proposed facilities, as well as
alternative routes to the proposed Kemblesville Loop \1\ in Chester
County, Pennsylvania. On June 2, 2015, FERC staff also conducted an
onsite environmental review of the proposed pipeline and several
alternative routes. In response to data requested by FERC staff,
Eastern Shore Natural Gas Company (Eastern Shore) provided information
on four alternative pipeline routes. FERC staff is further evaluating
Alternative Route 2 as described in Eastern Shore's April 21, 2015
response. This Supplemental Notice is being issued to seek comments on
Alternative Route 2 and opens a new scoping period for interested
parties to file comments on environmental issues specific to this
alternative route.
---------------------------------------------------------------------------
\1\ A pipeline loop is constructed parallel to an existing
pipeline to increase capacity.
---------------------------------------------------------------------------
The January 22, 2015 NOI announced that the FERC staff will prepare
an environmental assessment (EA) to address the environmental impacts
of the White Oak Mainline Expansion Project (Project). Please refer to
the NOI for more information about the overall facilities proposed by
Eastern Shore in Pennsylvania and Delaware, and FERC staff's EA
process. The Commission will use the EA in its decision-making process
to determine whether the Project is in the public convenience and
necessity.
The Commission previously solicited public input on the Project in
the beginning of 2015. We \2\ are now specifically seeking comments on
the Kemblesville Loop Alternative Route 2 to help the Commission staff
evaluate the environmental impact associated with the alternative and
how that compares to the currently proposed route. Please note that
this special scoping period will close on August 8, 2015.
---------------------------------------------------------------------------
\2\ ``We,'' ``us,'' and ``our'' refer to the environmental staff
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------
This Supplemental Notice is being sent to the Commission's current
environmental mailing list for this Project, including new landowners
that would be affected by the alternative pipeline route.
If you are a landowner receiving this notice, a pipeline company
representative may contact you about the acquisition of an easement to
construct, operate, and maintain the proposed facilities. The company
would seek to negotiate a mutually acceptable agreement. However, if
the Commission approves the Project, that approval conveys with it the
right of eminent domain. Therefore, if the easement negotiations fail
to produce an agreement, the pipeline company could initiate
condemnation proceedings where compensation would be determined in
accordance with state law.
A fact sheet prepared by the FERC entitled ``An Interstate Natural
Gas Facility on My Land? What Do I Need To Know?'' is available for
viewing on the FERC Web site (www.ferc.gov). This fact sheet addresses
a number of typically asked questions, including the use of eminent
domain and how to participate in the Commission's proceedings.
Public Participation
For your convenience, there are three methods you can use to submit
your comments to the Commission. The Commission will provide equal
consideration to all comments received, whether filed in written form
or provided verbally. The Commission encourages electronic filing of
comments and has expert staff available to assist you at (202) 502-8258
or [email protected]. Please carefully follow these instructions so that
your comments are properly recorded.
(1) You can file your comments electronically using the eComment
feature located on the Commission's Web site (www.ferc.gov) under the
link to Documents and Filings. This is an easy method for interested
persons to submit brief, text-only comments on a project;
(2) You can file your comments electronically using the eFiling
feature located on the Commission's Web site (www.ferc.gov) under the
link to Documents and Filings. With eFiling, you can provide comments
in a variety of formats by attaching them as a file with your
submission. New eFiling users must first create an account by clicking
on ``eRegister.'' You must select the type of filing you are making. If
you are filing a comment on a particular project, please select
``Comment on a Filing;'' or
(3) You can file a paper copy of your comments by mailing them to
the following address: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE., Room 1A, Washington, DC
20426.
Summary of Kemblesville Loop Alternative Route 2
The Kemblesville Loop Alternative Route 2 would be collocated
entirely with the existing right-of-way for Eastern Shore's White Oak
mainline
[[Page 43077]]
pipeline and existing loop. This alternative route would involve
construction in residential areas as the surrounding area has been
developed into several residential subdivisions since installation of
the original mainline pipeline. The Kemblesville Loop Alternative Route
2 would be about 2.1 miles in length and would use previously disturbed
land and two existing crossing locations of the White Clay Creek
National Wild and Scenic River, administered by the U.S. Department of
Interior's National Park Service, using a flume and/or dam and pump
crossing method. In comparison, the currently proposed 3.9-mile-long
route would follow existing rights-of-way for 41.9 percent of the route
and would include two horizontal directional drill crossings of
tributaries of the White Clay Creek National Wild and Scenic River.
An overview map of the Kemblesville Loop Alternative Route 2 that
follows the existing Eastern Shore pipeline right-of-way and the
currently proposed route is included in Appendix 1.\3\
---------------------------------------------------------------------------
\3\ The appendices referenced in this notice are not being
printed in the Federal Register. Copies of appendices were sent to
all those receiving this notice in the mail and are available at
www.ferc.gov using the link called ``eLibrary'' or from the
Commission's Public Reference Room, 888 First Street NE.,
Washington, DC 20426, or call (202) 502-8371. For instructions on
connecting to eLibrary, refer to the last page of this notice.
---------------------------------------------------------------------------
Currently Identified Environmental Issues
We have identified several issues that we think deserve attention
for our comparison of the proposed route and the Kemblesville Loop
Alternative Route 2 based on a review of the proposed facilities and
the environmental information provided by Eastern Shore. This
preliminary list of issues may be changed based on your comments and
our analysis.
crossings of the White Clay Creek National Wild and Scenic
River;
old growth forested areas along the pipeline routes; and
noxious weeds.
Environmental Mailing List
The environmental mailing list includes federal, state, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American Tribes; other
interested parties; commenters; and local libraries and newspapers.
This list also includes landowners affected by the pipelines as
currently proposed, as well as landowners that may be affected by the
Kemblesville Loop Alternative Route 2. We will update the environmental
mailing list as the analysis proceeds to ensure that we send the
information related to this environmental review to all individuals,
organizations, and government entities interested in and/or potentially
affected by the proposed Project.
Copies of the completed EA will be sent to the environmental
mailing list for public review and comment. If you would prefer to
receive a paper copy of the document instead of a CD version or would
like to remove your name from the mailing list, please return the
attached Information Request (Appendix 2).
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want
to become an ``intervenor'' which is an official party to the
Commission's proceeding. Intervenors play a more formal role in the
process and are able to file briefs, appear at hearings, and be heard
by the courts if they choose to appeal the Commission's final ruling.
An intervenor formally participates in the proceeding by filing a
request to intervene. Instructions for becoming an intervenor are in
the User's Guide under the ``e-filing'' link on the Commission's Web
site.
Additional Information
Additional information about the Project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC Web site (www.ferc.gov) using the eLibrary link. Click on the
eLibrary link, click on ``General Search'' and enter the docket number,
excluding the last three digits in the Docket Number field (i.e., CP15-
18). Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
[email protected] or toll free at (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
Dated: July 9, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-17805 Filed 7-20-15; 8:45 am]
BILLING CODE 6717-01-P