[Federal Register Volume 80, Number 138 (Monday, July 20, 2015)]
[Proposed Rules]
[Pages 42777-42786]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-17740]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52
[EPA-R04-OAR-2012-0696; FRL-9930-85-Region 4]
Approval and Promulgation of Implementation Plans; Georgia
Infrastructure Requirements for the 2008 8-Hour Ozone National Ambient
Air Quality Standards
AGENCY: Environmental Protection Agency (EPA).
ACTION: Proposed rule.
-----------------------------------------------------------------------
SUMMARY: The Environmental Protection Agency (EPA) is proposing to
approve portions of the May 14, 2012, State Implementation Plan (SIP)
submission, provided by the Georgia Department of Natural Resources,
Environmental Protection Division (hereafter referred to as GA EPD) for
inclusion into the Georgia SIP. This proposal pertains to the Clean Air
Act (CAA or the Act) infrastructure requirements for the 2008 8-hour
ozone national ambient air quality standards (NAAQS). The CAA requires
that each state adopt and submit a SIP for the implementation,
maintenance, and enforcement of each NAAQS promulgated by EPA, which is
commonly referred to as an ``infrastructure'' SIP. GA EPD certified
that the Georgia SIP contains provisions that ensure the 2008 8-hour
ozone NAAQS is implemented, enforced, and maintained in Georgia. With
the exception of provisions pertaining to prevention of significant
deterioration (PSD) permitting and interstate transport requirements,
EPA is proposing to approve Georgia's infrastructure SIP submission
provided to EPA on May 14, 2012, as satisfying the required
infrastructure elements for the 2008 8-hour ozone NAAQS.
[[Page 42778]]
DATES: Written comments must be received on or before August 19, 2015.
ADDRESSES: Submit your comments, identified by Docket ID No. EPA-R04-
OAR-2012-0696, by one of the following methods:
1. www.regulations.gov: Follow the on-line instructions for
submitting comments.
2. Email: [email protected].
3. Fax: (404) 562-9019.
4. Mail: ``EPA-R04-OAR-2012-0696,'' Air Regulatory Management
Section, (formerly the Regulatory Development Section), Air Planning
and Implementation Branch, (formerly the Air Planning Branch) Air,
Pesticides and Toxics Management Division, U.S. Environmental
Protection Agency, Region 4, 61 Forsyth Street SW., Atlanta, Georgia
30303-8960.
5. Hand Delivery or Courier: Lynorae Benjamin, Chief, Air
Regulatory Management Section, Air Planning and Implementation Branch,
Air, Pesticides and Toxics Management Division, U.S. Environmental
Protection Agency, Region 4, 61 Forsyth Street SW., Atlanta, Georgia
30303-8960. Such deliveries are only accepted during the Regional
Office's normal hours of operation. The Regional Office's official
hours of business are Monday through Friday, 8:30 a.m. to 4:30 p.m.,
excluding Federal holidays.
Instructions: Direct your comments to Docket ID No. EPA-R04-OAR-
2012-0696. EPA's policy is that all comments received will be included
in the public docket without change and may be made available online at
www.regulations.gov, including any personal information provided,
unless the comment includes information claimed to be Confidential
Business Information (CBI) or other information whose disclosure is
restricted by statute. Do not submit through www.regulations.gov or
email, information that you consider to be CBI or otherwise protected.
The www.regulations.gov Web site is an ``anonymous access'' system,
which means EPA will not know your identity or contact information
unless you provide it in the body of your comment. If you send an email
comment directly to EPA without going through www.regulations.gov, your
email address will be automatically captured and included as part of
the comment that is placed in the public docket and made available on
the Internet. If you submit an electronic comment, EPA recommends that
you include your name and other contact information in the body of your
comment and with any disk or CD-ROM you submit. If EPA cannot read your
comment due to technical difficulties and cannot contact you for
clarification, EPA may not be able to consider your comment. Electronic
files should avoid the use of special characters, any form of
encryption, and be free of any defects or viruses. For additional
information about EPA's public docket visit the EPA Docket Center
homepage at http://www.epa.gov/epahome/dockets.htm.
Docket: All documents in the electronic docket are listed in the
www.regulations.gov index. Although listed in the index, some
information is not publicly available, i.e., CBI or other information
whose disclosure is restricted by statute. Certain other material, such
as copyrighted material, is not placed on the Internet and will be
publicly available only in hard copy form. Publicly available docket
materials are available either electronically in www.regulations.gov or
in hard copy at the Air Regulatory Management Section, Air Planning and
Implementation Branch, Air, Pesticides and Toxics Management Division,
U.S. Environmental Protection Agency, Region 4, 61 Forsyth Street SW.,
Atlanta, Georgia 30303-8960. EPA requests that if at all possible, you
contact the person listed in the FOR FURTHER INFORMATION CONTACT
section to schedule your inspection. The Regional Office's official
hours of business are Monday through Friday, 8:30 a.m. to 4:30 p.m.,
excluding Federal holidays.
FOR FURTHER INFORMATION CONTACT: Nacosta C. Ward, Air Regulatory
Management Section, Air Planning and Implementation Branch, Air,
Pesticides and Toxics Management Division, U.S. Environmental
Protection Agency, Region 4, 61 Forsyth Street SW., Atlanta, Georgia
30303-8960. The telephone number is (404) 562-9140. Ms. Ward can be
reached via electronic mail at [email protected].
SUPPLEMENTARY INFORMATION:
Table of Contents
I. Background
II. What elements are required under sections 110(a)(1) and (2)?
III. What is EPA's approach to the review of infrastructure SIP
submissions?
IV. What is EPA's analysis of how Georgia addressed the elements of
sections 110(a)(1) and (2) ``Infrastructure'' provisions?
V. Proposed Action
VI. Statutory and Executive Order Reviews
I. Background
On March 27, 2008, EPA promulgated a revised NAAQS for ozone based
on 8-hour average concentrations. EPA revised the level of the 8-hour
ozone NAAQS to 0.075 parts per million. See 77 FR 16436. Pursuant to
section 110(a)(1) of the CAA, states are required to submit SIPs
meeting the applicable requirements of section 110(a)(2) within three
years after promulgation of a new or revised NAAQS or within such
shorter period as EPA may prescribe. Section 110(a)(2) requires states
to address basic SIP elements such as requirements for monitoring,
basic program requirements and legal authority that are designed to
assure attainment and maintenance of the NAAQS. States were required to
submit such SIPs for the 2008 8-hour ozone NAAQS to EPA no later than
March 2011.\1\
---------------------------------------------------------------------------
\1\ In these infrastructure SIP submissions states generally
certify evidence of compliance with sections 110(a)(1) and (2) of
the CAA through a combination of state regulations and statutes,
some of which have been incorporated into the federally-approved
SIP. In addition, certain federally-approved, non-SIP regulations
may also be appropriate for demonstrating compliance with sections
110(a)(1) and (2). Unless otherwise indicated, the Georgia Rules for
Air Quality (also referred to as ``Rules'' or ``Regulations'') of
the Georgia SIP cited throughout this rulemaking have been approved
into Georgia's federally-approved SIP. The state statutes cited from
the Georgia Air Quality Act Article 1: Air Quality (also referred to
as ``O.C.G.A.'') throughout this rulemaking, however, are not
approved into the Georgia SIP.
---------------------------------------------------------------------------
Today's action is proposing to approve Georgia's infrastructure
submission for the applicable requirements of the 2008 8-hour ozone
NAAQS, with the exception of the PSD permitting requirements for major
sources of sections 110(a)(2)(C), (D)(i)(II) prong 3 and (J) and the
interstate transport requirements of section 110(a)(2)(D)(i)(I) and
(II) (prongs 1, 2, and 4). With respect to Georgia's infrastructure SIP
submission related to provisions pertaining to interstate transport
requirements of section 110(a)(2)(D)(i)(I) and (II) (prongs, 1, 2, and
4), EPA is not proposing any action today regarding these requirements
and will act on these requirements in a separate action. On March 18,
2015, EPA approved Georgia's May 14, 2012, infrastructure SIP
submission regarding the PSD permitting requirements for major sources
of sections 110(a)(2)(C), (D)(i)(II) prong 3 and (J) for the 2008 8-
hour NAAQS. See 80 FR 14019. Therefore, EPA is not proposing any action
in today's proposed rulemaking pertaining to the PSD components of
sections 110(a)(2)(C), D)(i)(II) prong 3, and (J). For the aspects of
Georgia's submittal proposed for approval today, EPA notes that the
Agency is not approving any specific rule, but rather proposing that
Georgia's already approved SIP meets certain CAA requirements.
[[Page 42779]]
II. What elements are required under Sections 110(a)(1) and (2)?
Section 110(a) of the CAA requires states to submit SIPs to provide
for the implementation, maintenance, and enforcement of a new or
revised NAAQS within three years following the promulgation of such
NAAQS, or within such shorter period as EPA may prescribe. Section
110(a) imposes the obligation upon states to make a SIP submission to
EPA for a new or revised NAAQS, but the contents of that submission may
vary depending upon the facts and circumstances. In particular, the
data and analytical tools available at the time the state develops and
submits the SIP for a new or revised NAAQS affects the content of the
submission. The contents of such SIP submissions may also vary
depending upon what provisions the state's existing SIP already
contains. In the case of the 2008 8-hour ozone NAAQS, states typically
have met the basic program elements required in section 110(a)(2)
through earlier SIP submissions in connection with the 1997 8-hour
ozone NAAQS.
More specifically, section 110(a)(1) provides the procedural and
timing requirements for SIPs. Section 110(a)(2) lists specific elements
that states must meet for ``infrastructure'' SIP requirements related
to a newly established or revised NAAQS. As mentioned above, these
requirements include basic SIP elements such as requirements for
monitoring, basic program requirements and legal authority that are
designed to assure attainment and maintenance of the NAAQS. The
requirements of section 110(a)(2) are summarized below and in EPA's
September 13, 2013, memorandum entitled ``Guidance on Infrastructure
State Implementation Plan (SIP) Elements under Clean Air Act Sections
110(a)(1) and 110(a)(2).'' \2\
---------------------------------------------------------------------------
\2\ Two elements identified in section 110(a)(2) are not
governed by the three year submission deadline of section 110(a)(1)
because SIPs incorporating necessary local nonattainment area
controls are not due within three years after promulgation of a new
or revised NAAQS, but rather due at the time the nonattainment area
plan requirements are due pursuant to section 172. These
requirements are: (1) Submissions required by section 110(a)(2)(C)
to the extent that subsection refers to a permit program as required
in part D Title I of the CAA; and (2) submissions required by
section 110(a)(2)(I) which pertain to the nonattainment planning
requirements of part D, Title I of the CAA. Today's proposed
rulemaking does not address infrastructure elements related to
section 110(a)(2)(I) or the nonattainment planning requirements of
110(a)(2)(C).
---------------------------------------------------------------------------
110(a)(2)(A): Emission Limits and Other Control Measures
110(a)(2)(B): Ambient Air Quality Monitoring/Data System
110(a)(2)(C): Programs for Enforcement of Control Measures
and for Construction or Modification of Stationary Sources \3\
---------------------------------------------------------------------------
\3\ This rulemaking only addresses requirements for this element
as they relate to attainment areas.
---------------------------------------------------------------------------
110(a)(2)(D)(i)(I) and (II): Interstate Pollution
Transport
110(a)(2)(D)(ii): Interstate Pollution Abatement and
International Air Pollution
110(a)(2)(E): Adequate Resources and Authority, Conflict
of Interest, and Oversight of Local Governments and Regional Agencies
110(a)(2)(F): Stationary Source Monitoring and Reporting
110(a)(2)(G): Emergency Powers
110(a)(2)(H): SIP revisions
110(a)(2)(I): Plan Revisions for Nonattainment Areas \4\
---------------------------------------------------------------------------
\4\ As mentioned above, this element is not relevant to today's
proposed rulemaking.
---------------------------------------------------------------------------
110(a)(2)(J): Consultation with Government Officials,
Public Notification, and PSD and Visibility Protection
110(a)(2)(K): Air Quality Modeling and Submission of
Modeling Data
110(a)(2)(L): Permitting fees
110(a)(2)(M): Consultation and Participation by Affected
Local Entities
III. What is EPA's approach to the review of infrastructure SIP
submissions?
EPA is acting upon the SIP submission from Georgia that addresses
the infrastructure requirements of CAA sections 110(a)(1) and 110(a)(2)
for the 2008 8-hour ozone NAAQS. The requirement for states to make a
SIP submission of this type arises out of CAA section 110(a)(1).
Pursuant to section 110(a)(1), states must make SIP submissions
``within 3 years (or such shorter period as the Administrator may
prescribe) after the promulgation of a national primary ambient air
quality standard (or any revision thereof),'' and these SIP submissions
are to provide for the ``implementation, maintenance, and enforcement''
of such NAAQS. The statute directly imposes on states the duty to make
these SIP submissions, and the requirement to make the submissions is
not conditioned upon EPA's taking any action other than promulgating a
new or revised NAAQS. Section 110(a)(2) includes a list of specific
elements that ``[e]ach such plan'' submission must address.
EPA has historically referred to these SIP submissions made for the
purpose of satisfying the requirements of CAA sections 110(a)(1) and
110(a)(2) as ``infrastructure SIP'' submissions. Although the term
``infrastructure SIP'' does not appear in the CAA, EPA uses the term to
distinguish this particular type of SIP submission from submissions
that are intended to satisfy other SIP requirements under the CAA, such
as ``nonattainment SIP'' or ``attainment plan SIP'' submissions to
address the nonattainment planning requirements of part D of title I of
the CAA, ``regional haze SIP'' submissions required by EPA rule to
address the visibility protection requirements of CAA section 169A, and
nonattainment new source review permit program submissions to address
the permit requirements of CAA, title I, part D.
Section 110(a)(1) addresses the timing and general requirements for
infrastructure SIP submissions, and section 110(a)(2) provides more
details concerning the required contents of these submissions. The list
of required elements provided in section 110(a)(2) contains a wide
variety of disparate provisions, some of which pertain to required
legal authority, some of which pertain to required substantive program
provisions, and some of which pertain to requirements for both
authority and substantive program provisions.\5\ EPA therefore believes
that while the timing requirement in section 110(a)(1) is unambiguous,
some of the other statutory provisions are ambiguous. In particular,
EPA believes that the list of required elements for infrastructure SIP
submissions provided in section 110(a)(2) contains ambiguities
concerning what is required for inclusion in an infrastructure SIP
submission.
---------------------------------------------------------------------------
\5\ For example: Section 110(a)(2)(E)(i) provides that states
must provide assurances that they have adequate legal authority
under state and local law to carry out the SIP; section 110(a)(2)(C)
provides that states must have a SIP-approved program to address
certain sources as required by part C of title I of the CAA; and
section 110(a)(2)(G) provides that states must have legal authority
to address emergencies as well as contingency plans that are
triggered in the event of such emergencies.
---------------------------------------------------------------------------
The following examples of ambiguities illustrate the need for EPA
to interpret some section 110(a)(1) and section 110(a)(2) requirements
with respect to infrastructure SIP submissions for a given new or
revised NAAQS. One example of ambiguity is that section 110(a)(2)
requires that ``each'' SIP submission must meet the list of
requirements therein, while EPA has long noted that this literal
reading of the statute is internally inconsistent and would create a
conflict with the nonattainment provisions in part D of title I of the
Act, which specifically address nonattainment SIP
[[Page 42780]]
requirements.\6\ Section 110(a)(2)(I) pertains to nonattainment SIP
requirements and part D addresses when attainment plan SIP submissions
to address nonattainment area requirements are due. For example,
section 172(b) requires EPA to establish a schedule for submission of
such plans for certain pollutants when the Administrator promulgates
the designation of an area as nonattainment, and section 107(d)(1)(B)
allows up to two years, or in some cases three years, for such
designations to be promulgated.\7\ This ambiguity illustrates that
rather than apply all the stated requirements of section 110(a)(2) in a
strict literal sense, EPA must determine which provisions of section
110(a)(2) are applicable for a particular infrastructure SIP
submission.
---------------------------------------------------------------------------
\6\ See, e.g., ``Rule To Reduce Interstate Transport of Fine
Particulate Matter and Ozone (Clean Air Interstate Rule); Revisions
to Acid Rain Program; Revisions to the NOx SIP Call; Final Rule,''
70 FR 25162, at 25163--65 (May 12, 2005) (explaining relationship
between timing requirement of section 110(a)(2)(D) versus section
110(a)(2)(I)).
\7\ EPA notes that this ambiguity within section 110(a)(2) is
heightened by the fact that various subparts of part D set specific
dates for submission of certain types of SIP submissions in
designated nonattainment areas for various pollutants. Note, e.g.,
that section 182(a)(1) provides specific dates for submission of
emissions inventories for the ozone NAAQS. Some of these specific
dates are necessarily later than three years after promulgation of
the new or revised NAAQS.
---------------------------------------------------------------------------
Another example of ambiguity within sections 110(a)(1) and
110(a)(2) with respect to infrastructure SIPs pertains to whether
states must meet all of the infrastructure SIP requirements in a single
SIP submission, and whether EPA must act upon such SIP submission in a
single action. Although section 110(a)(1) directs states to submit ``a
plan'' to meet these requirements, EPA interprets the CAA to allow
states to make multiple SIP submissions separately addressing
infrastructure SIP elements for the same NAAQS. If states elect to make
such multiple SIP submissions to meet the infrastructure SIP
requirements, EPA can elect to act on such submissions either
individually or in a larger combined action.\8\ Similarly, EPA
interprets the CAA to allow it to take action on the individual parts
of one larger, comprehensive infrastructure SIP submission for a given
NAAQS without concurrent action on the entire submission. For example,
EPA has sometimes elected to act at different times on various elements
and sub-elements of the same infrastructure SIP submission.\9\
---------------------------------------------------------------------------
\8\ See, e.g., ``Approval and Promulgation of Implementation
Plans; New Mexico; Revisions to the New Source Review (NSR) State
Implementation Plan (SIP); Prevention of Significant Deterioration
(PSD) and Nonattainment New Source Review (NNSR) Permitting,'' 78 FR
4339 (January 22, 2013) (EPA's final action approving the structural
PSD elements of the New Mexico SIP submitted by the State separately
to meet the requirements of EPA's 2008 PM2.5 NSR rule),
and ``Approval and Promulgation of Air Quality Implementation Plans;
New Mexico; Infrastructure and Interstate Transport Requirements for
the 2006 PM2.5 NAAQS,'' (78 FR 4337) (January 22, 2013)
(EPA's final action on the infrastructure SIP for the 2006
PM2.5 NAAQS).
\9\ On December 14, 2007, the State of Tennessee, through the
Tennessee Department of Environment and Conservation, made a SIP
revision to EPA demonstrating that the State meets the requirements
of sections 110(a)(1) and (2). EPA proposed action for
infrastructure SIP elements (C) and (J) on January 23, 2012 (77 FR
3213) and took final action on March 14, 2012 (77 FR 14976). On
April 16, 2012 (77 FR 22533) and July 23, 2012 (77 FR 42997), EPA
took separate proposed and final actions on all other section
110(a)(2) infrastructure SIP elements of Tennessee's December 14,
2007 submittal.
---------------------------------------------------------------------------
Ambiguities within sections 110(a)(1) and 110(a)(2) may also arise
with respect to infrastructure SIP submission requirements for
different NAAQS. Thus, EPA notes that not every element of section
110(a)(2) would be relevant, or as relevant, or relevant in the same
way, for each new or revised NAAQS. The states' attendant
infrastructure SIP submissions for each NAAQS therefore could be
different. For example, the monitoring requirements that a state might
need to meet in its infrastructure SIP submission for purposes of
section 110(a)(2)(B) could be very different for different pollutants
because the content and scope of a state's infrastructure SIP
submission to meet this element might be very different for an entirely
new NAAQS than for a minor revision to an existing NAAQS.\10\
---------------------------------------------------------------------------
\10\ For example, implementation of the 1997 PM2.5
NAAQS required the deployment of a system of new monitors to measure
ambient levels of that new indicator species for the new NAAQS.
---------------------------------------------------------------------------
EPA notes that interpretation of section 110(a)(2) is also
necessary when EPA reviews other types of SIP submissions required
under the CAA. Therefore, as with infrastructure SIP submissions, EPA
also has to identify and interpret the relevant elements of section
110(a)(2) that logically apply to these other types of SIP submissions.
For example, section 172(c)(7) requires that attainment plan SIP
submissions required by part D have to meet the ``applicable
requirements'' of section 110(a)(2). Thus, for example, attainment plan
SIP submissions must meet the requirements of section 110(a)(2)(A)
regarding enforceable emission limits and control measures and section
110(a)(2)(E)(i) regarding air agency resources and authority. By
contrast, it is clear that attainment plan SIP submissions required by
part D would not need to meet the portion of section 110(a)(2)(C) that
pertains to the PSD program required in part C of title I of the CAA,
because PSD does not apply to a pollutant for which an area is
designated nonattainment and thus subject to part D planning
requirements. As this example illustrates, each type of SIP submission
may implicate some elements of section 110(a)(2) but not others.
Given the potential for ambiguity in some of the statutory language
of section 110(a)(1) and section 110(a)(2), EPA believes that it is
appropriate to interpret the ambiguous portions of section 110(a)(1)
and section 110(a)(2) in the context of acting on a particular SIP
submission. In other words, EPA assumes that Congress could not have
intended that each and every SIP submission, regardless of the NAAQS in
question or the history of SIP development for the relevant pollutant,
would meet each of the requirements, or meet each of them in the same
way. Therefore, EPA has adopted an approach under which it reviews
infrastructure SIP submissions against the list of elements in section
110(a)(2), but only to the extent each element applies for that
particular NAAQS.
Historically, EPA has elected to use guidance documents to make
recommendations to states for infrastructure SIPs, in some cases
conveying needed interpretations on newly arising issues and in some
cases conveying interpretations that have already been developed and
applied to individual SIP submissions for particular elements.\11\ EPA
most recently issued guidance for infrastructure SIPs on September 13,
2013 (2013 Guidance).\12\ EPA developed this document to provide states
with up-to-date guidance for infrastructure SIPs for any new or revised
NAAQS. Within this guidance, EPA describes the duty of states to make
infrastructure SIP submissions to meet basic structural SIP
requirements within three years of promulgation of a new or revised
NAAQS. EPA also made recommendations about many specific subsections of
section 110(a)(2) that are relevant in the context of infrastructure
[[Page 42781]]
SIP submissions.\13\ The guidance also discusses the substantively
important issues that are germane to certain subsections of section
110(a)(2). Significantly, EPA interprets sections 110(a)(1) and
110(a)(2) such that infrastructure SIP submissions need to address
certain issues and need not address others. Accordingly, EPA reviews
each infrastructure SIP submission for compliance with the applicable
statutory provisions of section 110(a)(2), as appropriate.
---------------------------------------------------------------------------
\11\ EPA notes, however, that nothing in the CAA requires EPA to
provide guidance or to promulgate regulations for infrastructure SIP
submissions. The CAA directly applies to states and requires the
submission of infrastructure SIP submissions, regardless of whether
or not EPA provides guidance or regulations pertaining to such
submissions. EPA elects to issue such guidance in order to assist
states, as appropriate.
\12\ ``Guidance on Infrastructure State Implementation Plan
(SIP) Elements under Clean Air Act Sections 110(a)(1) and
110(a)(2),'' Memorandum from Stephen D. Page, September 13, 2013.
\13\ EPA's September 13, 2013, guidance did not make
recommendations with respect to infrastructure SIP submissions to
address section 110(a)(2)(D)(i)(I). EPA issued the guidance shortly
after the U.S. Supreme Court agreed to review the D.C. Circuit
decision in EME Homer City, 696 F.3d7 (D.C. Cir. 2012) which had
interpreted the requirements of section 110(a)(2)(D)(i)(I). In light
of the uncertainty created by ongoing litigation, EPA elected not to
provide additional guidance on the requirements of section
110(a)(2)(D)(i)(I) at that time. As the guidance is neither binding
nor required by statute, whether EPA elects to provide guidance on a
particular section has no impact on a state's CAA obligations.
---------------------------------------------------------------------------
As an example, section 110(a)(2)(E)(ii) is a required element of
section 110(a)(2) for infrastructure SIP submissions. Under this
element, a state must meet the substantive requirements of section 128,
which pertain to state boards that approve permits or enforcement
orders and heads of executive agencies with similar powers. Thus, EPA
reviews infrastructure SIP submissions to ensure that the state's
implementation plan appropriately addresses the requirements of section
110(a)(2)(E)(ii) and section 128. The 2013 Guidance explains EPA's
interpretation that there may be a variety of ways by which states can
appropriately address these substantive statutory requirements,
depending on the structure of an individual state's permitting or
enforcement program (e.g., whether permits and enforcement orders are
approved by a multi-member board or by a head of an executive agency).
However they are addressed by the state, the substantive requirements
of section 128 are necessarily included in EPA's evaluation of
infrastructure SIP submissions because section 110(a)(2)(E)(ii)
explicitly requires that the state satisfy the provisions of section
128.
As another example, EPA's review of infrastructure SIP submissions
with respect to the PSD program requirements in sections 110(a)(2)(C),
(D)(i)(II), and (J) focuses upon the structural PSD program
requirements contained in part C and EPA's PSD regulations. Structural
PSD program requirements include provisions necessary for the PSD
program to address all regulated sources and NSR pollutants, including
greenhouse gases. By contrast, structural PSD program requirements do
not include provisions that are not required under EPA's regulations at
40 CFR 51.166 but are merely available as an option for the state, such
as the option to provide grandfathering of complete permit applications
with respect to the 2012 PM2.5 NAAQS. Accordingly, the
latter optional provisions are types of provisions EPA considers
irrelevant in the context of an infrastructure SIP action.
For other section 110(a)(2) elements, however, EPA's review of a
state's infrastructure SIP submission focuses on assuring that the
state's SIP meets basic structural requirements. For example, section
110(a)(2)(C) includes, among other things, the requirement that states
have a program to regulate minor new sources. Thus, EPA evaluates
whether the state has an EPA-approved minor new source review program
and whether the program addresses the pollutants relevant to that
NAAQS. In the context of acting on an infrastructure SIP submission,
however, EPA does not think it is necessary to conduct a review of each
and every provision of a state's existing minor source program (i.e.,
already in the existing SIP) for compliance with the requirements of
the CAA and EPA's regulations that pertain to such programs.
With respect to certain other issues, EPA does not believe that an
action on a state's infrastructure SIP submission is necessarily the
appropriate type of action in which to address possible deficiencies in
a state's existing SIP. These issues include: (i) Existing provisions
related to excess emissions from sources during periods of startup,
shutdown, or malfunction that may be contrary to the CAA and EPA's
policies addressing such excess emissions (``SSM''); (ii) existing
provisions related to ``director's variance'' or ``director's
discretion'' that may be contrary to the CAA because they purport to
allow revisions to SIP-approved emissions limits while limiting public
process or not requiring further approval by EPA; and (iii) existing
provisions for PSD programs that may be inconsistent with current
requirements of EPA's ``Final NSR Improvement Rule,'' 67 FR 80186
(December 31, 2002), as amended by 72 FR 32526 (June 13, 2007) (``NSR
Reform''). Thus, EPA believes it may approve an infrastructure SIP
submission without scrutinizing the totality of the existing SIP for
such potentially deficient provisions and may approve the submission
even if it is aware of such existing provisions.\14\ It is important to
note that EPA's approval of a state's infrastructure SIP submission
should not be construed as explicit or implicit re-approval of any
existing potentially deficient provisions that relate to the three
specific issues just described.
---------------------------------------------------------------------------
\14\ By contrast, EPA notes that if a state were to include a
new provision in an infrastructure SIP submission that contained a
legal deficiency, such as a new exemption for excess emissions
during SSM events, then EPA would need to evaluate that provision
for compliance against the rubric of applicable CAA requirements in
the context of the action on the infrastructure SIP.
---------------------------------------------------------------------------
EPA's approach to review of infrastructure SIP submissions is to
identify the CAA requirements that are logically applicable to that
submission. EPA believes that this approach to the review of a
particular infrastructure SIP submission is appropriate, because it
would not be reasonable to read the general requirements of section
110(a)(1) and the list of elements in 110(a)(2) as requiring review of
each and every provision of a state's existing SIP against all
requirements in the CAA and EPA regulations merely for purposes of
assuring that the state in question has the basic structural elements
for a functioning SIP for a new or revised NAAQS. Because SIPs have
grown by accretion over the decades as statutory and regulatory
requirements under the CAA have evolved, they may include some outmoded
provisions and historical artifacts. These provisions, while not fully
up to date, nevertheless may not pose a significant problem for the
purposes of ``implementation, maintenance, and enforcement'' of a new
or revised NAAQS when EPA evaluates adequacy of the infrastructure SIP
submission. EPA believes that a better approach is for states and EPA
to focus attention on those elements of section 110(a)(2) of the CAA
most likely to warrant a specific SIP revision due to the promulgation
of a new or revised NAAQS or other factors.
For example, EPA's 2013 Guidance gives simpler recommendations with
respect to carbon monoxide than other NAAQS pollutants to meet the
visibility requirements of section 110(a)(2)(D)(i)(II), because carbon
monoxide does not affect visibility. As a result, an infrastructure SIP
submission for any future new or revised NAAQS for carbon monoxide need
only state this fact in order to address the visibility prong of
section 110(a)(2)(D)(i)(II).
Finally, EPA believes that its approach with respect to
infrastructure SIP requirements is based on a reasonable reading of
sections 110(a)(1)
[[Page 42782]]
and 110(a)(2) because the CAA provides other avenues and mechanisms to
address specific substantive deficiencies in existing SIPs. These other
statutory tools allow EPA to take appropriately tailored action,
depending upon the nature and severity of the alleged SIP deficiency.
Section 110(k)(5) authorizes EPA to issue a ``SIP call'' whenever the
Agency determines that a state's SIP is substantially inadequate to
attain or maintain the NAAQS, to mitigate interstate transport, or to
otherwise comply with the CAA.\15\ Section 110(k)(6) authorizes EPA to
correct errors in past actions, such as past approvals of SIP
submissions.\16\ Significantly, EPA's determination that an action on a
state's infrastructure SIP submission is not the appropriate time and
place to address all potential existing SIP deficiencies does not
preclude EPA's subsequent reliance on provisions in section 110(a)(2)
as part of the basis for action to correct those deficiencies at a
later time. For example, although it may not be appropriate to require
a state to eliminate all existing inappropriate director's discretion
provisions in the course of acting on an infrastructure SIP submission,
EPA believes that section 110(a)(2)(A) may be among the statutory bases
that EPA relies upon in the course of addressing such deficiency in a
subsequent action.\17\
---------------------------------------------------------------------------
\15\ For example, EPA issued a SIP call to Utah to address
specific existing SIP deficiencies related to the treatment of
excess emissions during SSM events. See ``Finding of Substantial
Inadequacy of Implementation Plan; Call for Utah State
Implementation Plan Revisions,'' 74 FR 21639 (April 18, 2011).
\16\ EPA has used this authority to correct errors in past
actions on SIP submissions related to PSD programs. See ``Limitation
of Approval of Prevention of Significant Deterioration Provisions
Concerning Greenhouse Gas Emitting-Sources in State Implementation
Plans; Final Rule,'' 75 FR 82536 (December 30, 2010). EPA has
previously used its authority under CAA section 110(k)(6) to remove
numerous other SIP provisions that the Agency determined it had
approved in error. See, e.g., 61 FR 38664 (July 25, 1996) and 62 FR
34641 (June 27, 1997) (corrections to American Samoa, Arizona,
California, Hawaii, and Nevada SIPs); 69 FR 67062 (November 16,
2004) (corrections to California SIP); and 74 FR 57051 (November 3,
2009) (corrections to Arizona and Nevada SIPs).
\17\ See, e.g., EPA's disapproval of a SIP submission from
Colorado on the grounds that it would have included a director's
discretion provision inconsistent with CAA requirements, including
section 110(a)(2)(A). See, e.g., 75 FR 42342 at 42344 (July 21,
2010) (proposed disapproval of director's discretion provisions); 76
FR 4540 (Jan. 26, 2011) (final disapproval of such provisions).
---------------------------------------------------------------------------
IV. What is EPA's analysis of how Georgia addressed the elements of
Sections 110(a)(1) and (2) ``Infrastructure'' Provisions?
The Georgia infrastructure submission addresses the provisions of
sections 110(a)(1) and (2) as described below.
1. 110(a)(2)(A) Emission limits and other control measures: There
are several provisions within the Georgia Rules for Air Quality that
provide GA EPD with the necessary authority to adopt and enforce air
quality controls, which include enforceable emission limitations and
other control measures. Rule 391-3-1-.01 ``Definitions'' provides
definitions of emissions limitations, controls, and standards for
Georgia. Rules 391-3-1-.02 ``Provisions'' and 391-3-1-.03 ``Permits''
provides emissions limitations, control measures and compliance
schedules and provides Georgia with the authority to enforce such
provisions for ozone. EPA has made the preliminary determination that
the provisions contained in these rules are adequate to protect the
2008 8-hour ozone NAAQS in the State.
In this action, EPA is not proposing to approve or disapprove any
existing State provisions with regard to excess emissions during
startup, shutdown or malfunction (SSM) of operations at a facility. EPA
believes that a number of states have SSM provisions which are contrary
to the CAA and existing EPA guidance, ``State Implementation Plans:
Policy Regarding Excess Emissions During Malfunctions, Startup, and
Shutdown'' (September 20, 1999), and the Agency is addressing such
state regulations in a separate action.\18\ In the meantime, EPA
encourages any state having a deficient SSM provision to take steps to
correct it as soon as possible.
---------------------------------------------------------------------------
\18\ On May 22, 2015, the EPA Administrator signed a final
action entitled, ``State Implementation Plans: Response to Petition
for Rulemaking; Restatement and Update of EPA's SSM Policy
Applicable to SIPs; Findings of Substantial Inadequacy; and SIP
Calls to Amend Provisions Applying to Excess Emissions During
Periods of Startup, Shutdown, and Malfunction.'' The prepublication
version of this rule is available at http://www.epa.gov/airquality/urbanair/sipstatus/emissions.html.
---------------------------------------------------------------------------
Additionally, in this action, EPA is not proposing to approve or
disapprove any existing State rules with regard to director's
discretion or variance provisions. EPA believes that a number of states
have such provisions which are contrary to the CAA and existing EPA
guidance (52 FR 45109 (November 24, 1987)), and the Agency plans to
take action in the future to address such state regulations. In the
meantime, EPA encourages any state having a director's discretion or
variance provision which is contrary to the CAA and EPA guidance to
take steps to correct the deficiency as soon as possible.
2. 110(a)(2)(B) Ambient air quality monitoring/data system: SIPs
are required to provide for the establishment and operation of ambient
air quality monitors; the compilation and analysis of ambient air
quality data; and the submission of these data to EPA upon request.
Georgia Air Quality Act Article 1: Air Quality (O.C.G.A. Section 12-9-6
(b)(13) Powers and duties of director as to air quality generally)
along with the Georgia Annual Monitoring Network Plan, provides GA EPD
with the authority to monitor ambient air quality in Georgia through an
ambient air quality monitoring system in the State, which includes the
monitoring of ozone at appropriate locations throughout the state using
the EPA approved Federal Reference Method or equivalent monitors.
Annually, States develop and submit to EPA for approval statewide
ambient monitoring network plans consistent with the requirements of 40
CFR parts 50, 53, and 58. The annual network plan involves an
evaluation of any proposed changes to the monitoring network, includes
the annual ambient monitoring network design plan and a certified
evaluation of the agency's ambient monitors and auxiliary support
equipment.\19\ The latest monitoring network plan for Georgia was
submitted to EPA on June 1, 2014, and on November 7, 2014, EPA approved
this plan. Georgia's approved monitoring network plan can be accessed
at www.regulations.gov using Docket ID No. EPA-R04-OAR-2012-0696. EPA
has made the preliminary determination that Georgia's SIP and practices
are adequate for the ambient air quality monitoring and data system
related to the 2008 8-hour ozone NAAQS.
---------------------------------------------------------------------------
\19\ On occasion, proposed changes to the monitoring network are
evaluated outside of the network plan approval process in accordance
with 40 CFR part 58.
---------------------------------------------------------------------------
3. 110(a)(2)(C) Program for enforcement of control measures
including review of proposed new sources: This element consists of
three sub-elements; enforcement, state-wide regulation of new and
modified minor sources and minor modifications of major sources; and
preconstruction permitting of major sources and major modifications in
areas designated attainment or unclassifiable for the subject NAAQS as
required by CAA title I part C (i.e., the major source
PSD program). To meet these obligations, Georgia cited Rules 391-3-
[[Page 42783]]
1-.07 ``Inspections and Investigations,'' Rule 391-3-1-.09
``Enforcement,'' and Rule 391-3-1-.03(1), ``Construction (SIP) Permit''
along with the Georgia Air Quality Act Article 1: Air Quality (O.C.G.A.
Sections 12-9-13 Proceedings for enforcement and 12-9-7 Permit
required; application; issuance; revocation, suspension, or amendment)
each of which pertain to enforcement and permitting of any new major
stationary source or any project at an existing major stationary source
in an area designated as attainment or unclassifiable as well as
regulation of minor stationary sources. In this action, EPA is only
proposing to approve Georgia's infrastructure SIP submission for the
2008 8-hour ozone NAAQS with respect to the general requirement in
section 110(a)(2)(C) to include a program in the SIP that provides for
the enforcement of emission limits and control measures on sources of
oxides of nitrogen (NOx) and volatile organic compounds (VOCs) and the
regulation of minor sources and modifications to assist in the
protection of air quality in nonattainment, attainment or
unclassifiable areas.
Enforcement: GA EPD's above-described, SIP-approved regulations
provide for enforcement of ozone precursor (VOC and NOx) emission
limits and control measures.
Preconstruction PSD Permitting for Major Sources: With respect to
Georgia's May 14, 2012, infrastructure SIP submission related to the
preconstruction PSD permitting requirements for major sources of
section 110(a)(2)(C), EPA took final action to approve these provisions
for the 2008 8-hour ozone NAAQS on March 18, 2015. See 80 FR 14019.
Regulation of minor sources and modifications: Section 110(a)(2)(C)
also requires the SIP to include provisions that govern the minor
source program that regulates emissions of the 2008 8-hour ozone NAAQS.
Rule 391-3-1-.03(1), ``Construction (SIP) Permit'' governs the
preconstruction permitting of modifications and construction of minor
stationary sources.
EPA has made the preliminary determination that Georgia's SIP and
practices are adequate for enforcement of control measures and
regulation of minor sources and modifications related to the 2008 8-
hour ozone NAAQS.
4. 110(a)(2)(D)(i)(I) and (II) Interstate Pollution Transport:
Section 110(a)(2)(D)(i) has two components; 110(a)(2)(D)(i)(I) and
110(a)(2)(D)(II). Each of these components have two subparts resulting
in four distinct components, commonly referred to as ``prongs,'' that
must be addressed in infrastructure SIP submissions. The first two
prongs, which are codified in section 110(a)(2)(D)(i)(I), are
provisions that prohibit any source or other type of emissions activity
in one state from contributing significantly to nonattainment of the
NAAQS in another state (``prong 1''), and interfering with maintenance
of the NAAQS in another state (``prong 2''). The third and fourth
prongs, which are codified in section 110(a)(2)(D)(i)(II), are
provisions that prohibit emissions activity in one state interfering
with measures required to prevent significant deterioration of air
quality in another state (``prong 3''), or to protect visibility in
another state (``prong 4''). With respect to Georgia's infrastructure
SIP submissions related to the interstate transport requirements of
section 110(a)(2)(D)(i)(I) and 110(a)(2)(D)(i)(II) (prongs 1 through
4), EPA is not proposing any action today regarding these requirements.
With respect to Georgia's May 14, 2012, infrastructure SIP submission
related to the preconstruction PSD permitting requirements for major
sources of section 110(a)(2)(D)(i)(II) (prong 3), EPA took final action
to approve these provisions for the 2008 8-hour ozone NAAQS on March
18, 2015. See 80 FR 14019. EPA will act on prongs 1, 2, and 4 of
section 110(a)(2)(D)(i)(I) and (II) in a separate action.
5. 110(a)(2)(D)(ii) Interstate Pollution Abatement and
International Air Pollution: Section 110(a)(2)(D)(ii) requires SIPs to
include provisions ensuring compliance with sections 115 and 126 of the
Act, relating to interstate and international pollution abatement. Rule
391-3-1-.02 ``Provisions'' provides how GA EPD will notify neighboring
states of potential impacts from new or modified sources consistent
with the requirements of 40 CFR 51.166. In addition, Georgia does not
have any pending obligation under sections 115 and 126 of the CAA.
Accordingly, EPA has made the preliminary determination that Georgia's
SIP and practices are adequate for ensuring compliance with the
applicable requirements relating to interstate and international
pollution abatement for the 2008 8-hour ozone NAAQS.
6. 110(a)(2)(E) Adequate Resources and Authority, Conflict of
Interest, and Oversight of Local Governments and Regional Agencies:
Section 110(a)(2)(E) requires that each implementation plan provide (i)
necessary assurances that the State will have adequate personnel,
funding, and authority under state law to carry out its implementation
plan, (ii) that the State comply with the requirements respecting State
Boards pursuant to section 128 of the Act, and (iii) necessary
assurances that, where the State has relied on a local or regional
government, agency, or instrumentality for the implementation of any
plan provision, the State has responsibility for ensuring adequate
implementation of such plan provisions. EPA is proposing to approve
Georgia's SIP as meeting the requirements of section 110(a)(2)(E).
EPA's rationale for today's proposal respecting sub-elements (i), (ii),
and (iii) is described below.
In support of EPA's proposal to approve sub-elements
110(a)(2)(E)(i) and (iii), EPA notes that GA EPD is responsible for
promulgating rules and regulations for the NAAQS, emissions standards
general policies, a system of permits, and fee schedules for the review
of plans, and other planning needs. Georgia's infrastructure SIP
submission cites Georgia Air Quality Act Article 1: Air Quality
(O.C.G.A. Section 12-9-10 Permit related fees; costs of public notice
and Rule 391-3-1-.03(9) ``Georgia Air Permit Fee System'' which
provides the State's adequate funding and authority and rules for
permit fees. Additionally, as evidence of the adequacy of GA EPD's
resources, EPA submitted a letter to Georgia on March 26, 2014,
outlining 105 grant commitments and the current status of these
commitments for fiscal year 2013. The letter EPA submitted to Georgia
can be accessed at www.regulations.gov using Docket ID No. EPA-R04-OAR-
2012-0696. Annually, states update these grant commitments based on
current SIP requirements, air quality planning, and applicable
requirements related to the NAAQS. Georgia satisfactorily met all
commitments agreed to in the Air Planning Agreement for fiscal year
2013, therefore Georgia's grants were finalized and closed out.
With respect to the requirements of section 110(a)(2)(E)(ii)
pertaining the state board requirements of CAA section 128, Georgia's
infrastructure SIP submission cites Georgia Air Quality Act Article 1:
Air Quality (O.C.G.A. Section 12-9-5 Powers and duties of Board of
Natural Resources as to air quality generally) which provides the
powers and duties of the Board of Natural Resources as to air quality
and provides that at least a majority of members of this board
represent the public interest and not derive any significant portion of
income from persons subject to permits or enforcement orders and that
potential conflicts of interest will be adequately disclosed. This
provision has been incorporated into the federally approved
[[Page 42784]]
SIP. Collectively, these rules and commitments provide evidence that GA
EPD has adequate personnel, funding, and legal authority under state
law to carry out the state's implementation plan and related issues to
ensure that conflicts of interest are adequately addressed. EPA has
made the preliminary determination that Georgia has adequate resources
and authority to satisfy sections 110(a)(2)(E)(i), (ii), and (iii) of
the 2008 8-hour ozone NAAQS.
7. 110(a)(2)(F) Stationary Source Monitoring and Reporting:
Georgia's infrastructure SIP submission describes how the State
establishes requirements for emissions compliance testing and utilizes
emissions sampling and analysis. It further describes how the State
ensures the quality of its data through observing emissions and
monitoring operations. GA EPD uses these data to track progress towards
maintaining the NAAQS, develop control and maintenance strategies,
identify sources and general emission levels, and determine compliance
with emission regulations and additional EPA requirements. Georgia
meets these requirements through the Georgia Air Quality Act Article 1:
Air Quality (O.C.G.A. Section 12-9-5(b)(6) Powers and duties of Board
of Natural Resources as to air quality generally), Rules 391-3-1-.02(3)
``Sampling,'' 391-3-1-.02(6)(b) ``General Monitoring and Reporting
Requirements,'' 391-3-1-.02(6) ``Source Monitoring,'' 391-3-1-.02(7)
``Prevention of Significant Deterioration of Air Quality,'' 391-3-
1-.02(11) ``Compliance Assurance Monitoring,'' and, 391-3-1-.03
``Permits.''
In addition, Rule 391-3-1-.02(3) ``Sampling'' \20\ allows for the
use of credible evidence in the event that the GA EPD Director has
evidence that a source is violating an emission standard or permit
condition, the Director may require that the owner or operator of any
source submit to the Director any information necessary to determine
the compliance status of the source. In addition, EPA is unaware of any
provision preventing the use of credible evidence in the Georgia SIP.
---------------------------------------------------------------------------
\20\ This rule is not approved into the federally approved SIP.
---------------------------------------------------------------------------
Georgia is required to submit emissions data to EPA for purposes of
the National Emissions Inventory (NEI). The NEI is EPA's central
repository for air emissions data. EPA published the Air Emissions
Reporting Rule (AERR) on December 5, 2008, which modified the
requirements for collecting and reporting air emissions data. See 73 FR
76539. The AERR shortened the time states had to report emissions data
from 17 to 12 months, giving states one calendar year to submit
emissions data. All states are required to submit a comprehensive
emissions inventory every three years and report emissions for certain
larger sources annually through EPA's online Emissions Inventory
System. States report emissions data for the six criteria pollutants
and the precursors that form them--NOX, sulfur dioxide,
ammonia, lead, carbon monoxide, particulate matter, and volatile
organic compounds. Many states also voluntarily report emissions of
hazardous air pollutants. Georgia made its latest update to the 2011
NEI on June 10, 2014. EPA compiles the emissions data, supplementing it
where necessary, and releases it to the general public through the Web
site http://www.epa.gov/ttn/chief/eiinformation.html. EPA has made the
preliminary determination that Georgia's SIP and practices are adequate
for the stationary source monitoring systems obligations for the 2008
8-hour ozone NAAQS.
8. 110(a)(2)(G) Emergency powers: This section requires that states
demonstrate authority comparable with section 303 of the CAA and
adequate contingency plans to implement such authority. Georgia's
infrastructure SIP submission cites air pollution emergency episodes
and preplanned abatement strategies in the Georgia Air Quality Act:
Article 1: Air Quality (O.C.G.A. Sections 12-9-2 Declaration of public
policy, 12-9-6 Powers and duties of director as to air quality
generally, 12-9-12 Injunctive relief, 12-9-13 Proceedings for
enforcement, and 12-9-14 Powers of director in situations involving
imminent and substantial danger to public health), and Rule 391-3-1 .04
``Air Pollution Episodes.'' O.C.G.A. Section 12-9-2 provides ``[i]t is
declared to be the public policy of the state of Georgia to preserve,
protect, and improve air quality . . . to attain and maintain ambient
air quality standards so as to safeguard the public health, safety, and
welfare.'' O.C.G.A. Section 12-9-6(b)(10) provides the Director of EPD
authority to ``issue orders as may be necessary to enforce compliance
with [the Georgia Air Quality Act Article 1: Air Quality (O.C.G.A)] and
all rules and regulations of this article.'' O.C.G.A. Section 12-9-12
provides that ``[w]henever in the judgment of the director any person
has engaged in or is about to engage in any act or practice which
constitutes or will constitute an unlawful action under [the Georgia
Air Quality Act Article 1: Air Quality (O.C.G.A)], he may make
application to the superior court of the county in which the unlawful
act or practice has been or is about to be engaged in, or in which
jurisdiction is appropriate, for an order enjoining such act or
practice or for an order requiring compliance with this article. Upon a
showing by the director that such person has engaged in or is about to
engage in any such act or practice, a permanent or temporary
injunction, restraining order, or other order shall be granted without
the necessity of showing lack of an adequate remedy of law.'' O.C.G.A.
Section 12-19-13 specifically pertains to enforcement proceedings when
the Director of EPD has reason to believe that a violation of any
provision of the Georgia Air Quality Act Article 1: Air Quality
(O.C.G.A), or environmental rules, regulations or orders have occurred.
O.C.G.A. Section 12-9-14 also provides that the Governor, may issue
orders as necessary to protect the health of persons who are, or may
be, affected by a pollution source or facility after ``consult[ation]
with local authorities in order to confirm the correctness of the
information on which action proposed to be taken is based and to
ascertain the action which such authorities are or will be taking.''
Rule 391-3-1-.04 ``Air Pollution Episodes'' provides that the
Director of EPD ``will proclaim that an Air Pollution Alert, Air
Pollution Warning, or Air Pollution Emergency exists when the
meteorological conditions are such that an air stagnation condition is
in existence and/or the accumulation of air contaminants in any place
is attaining or has attained levels which could, if such levels are
sustained or exceeded, lead to a substantial threat to the health of
persons in the specific area affected.'' Collectively the cited
provisions provide that Georgia EPD demonstrate authority comparable
with section 303 of the CAA and adequate contingency plans to implement
such authority in the state. EPA has made the preliminary determination
that Georgia's SIP and practices are adequate to satisfy the emergency
powers obligations of the 2008 8-hour ozone NAAQS.
9. 110(a)(2)(H) SIP revisions: GA EPD is responsible for adopting
air quality rules and revising SIPs as needed to attain or maintain the
NAAQS in Georgia. Georgia Air Quality Act: Article 1: Air Quality
(O.C.G.A. Section 12-9-6(b)(12), 12-9-6(b)(13) Powers and duties of
director as to air quality generally) provides Georgia the authority to
implement the CAA and submit SIP revisions whenever the NAAQS are
revised. These provisions also provide GA EPD the ability and authority
to respond to calls for SIP
[[Page 42785]]
revisions, and Georgia has provided a number of SIP revisions over the
years for implementation of the NAAQS. Accordingly, EPA has made the
preliminary determination that Georgia's SIP and practices adequately
demonstrate a commitment to provide future SIP revisions related to the
2008 8-hour ozone NAAQS, when necessary.
10. 110(a)(2)(J) Consultation with Government Officials, Public
Notification, and PSD and Visibility Protection: EPA is proposing to
approve Georgia's infrastructure SIP for the 2008 8-hour ozone NAAQS
with respect to the general requirement in section 110(a)(2)(J) to
include a program in the SIP that complies with the applicable
consultation requirements of section 121, the public notification
requirements of section 127, and visibility protection. With respect to
Georgia's infrastructure SIP submission related to the preconstruction
PSD permitting, EPA took final action to approve Georgia's May 14,
2012, 2008 8-hour ozone NAAQS infrastructure SIP for these requirements
on March 18, 2015. See 80 FR 14019. EPA's rationale for its proposed
action regarding applicable consultation requirements of section 121,
the public notification requirements of section 127, and the visibility
requirements is described below.
Consultation with government officials (121 consultation): Section
110(a)(2)(J) of the CAA requires states to provide a process for
consultation with local governments, designated organizations and
federal land managers (FLMs) carrying out NAAQS implementation
requirements pursuant to section 121 relative to consultation. Georgia
Air Quality Act: Article 1: Air Quality (O.C.G.A. Section 12-9-5(b)(17)
Powers and duties of Board of Natural Resources as to air quality
generally), Georgia Administrative Procedures Act (O.C.G.A. Section 50-
13-4 Procedural requirements for adoption, amendment, or repeal of
rules; emergency rules; limitation on action to contest rule;
legislative override), and Rule 391-3-1-.02(7) ``Prevention of
Significant Deterioration (PSD)'' as it relates to Class I areas along
with the Regional Haze SIP Plan provide for consultation with
government officials whose jurisdictions might be affected by SIP
development activities. These consultation procedures were developed in
coordination with the transportation partners in the State and are
consistent with the approaches used for development of mobile
inventories for SIPs. Implementation of transportation conformity as
outlined in the consultation procedures requires GA EPD to consult with
federal, state and local transportation and air quality agency
officials on the development of motor vehicle emissions budgets. The
Regional Haze SIP provides for consultation between appropriate state,
local, and tribal air pollution control agencies as well as the
corresponding Federal Land Managers.
Public notification (127 public notification): GA EPD has public
notice mechanisms in place to notify the public of ozone and other
pollutant forecasting, including an air quality monitoring Web site
providing ground level ozone alerts, http://www.georgiaair.org/smogforecast/. Regulation 391-3-1-.04, ``Air Pollution Episodes,''
requires that EPD notify the public of any air pollution episode or
NAAQS violation. Additionally, the Georgia SIP process affords the
public an opportunity to participate in regulatory and other efforts to
improve air quality by holding public hearings for interested persons
to appear and submit written or oral comments.
Visibility Protection: EPA's September 2013 Infrastructure SIP
Guidance notes that EPA does not generally treat the visibility
protection aspects of section 110(a)(2)(J) as applicable for purposes
of the infrastructure SIP approval process. EPA recognizes that states
are subject to visibility protection and regional haze program
requirements under Part C of the Act (which includes sections 169A and
169B). However, in the event of the establishment of a new primary
NAAQS, the visibility protection and regional haze program requirements
under part C do not change. Thus, EPA concludes there are no new
applicable visibility protection obligations under section 110(a)(2)(J)
as a result of the 2008 8-hour ozone NAAQS that need to be addressed in
Georgia's infrastructure SIP submission as it relates to visibility
protection.
EPA has made the preliminary determination that Georgia's SIP and
practices adequately demonstrate the State's ability to provide
consultation with government officials, public notification related to
the 2008 8-hour ozone NAAQS when necessary, and, as explained above, is
sufficient for visibility protection for this element.
11. 110(a)(2)(K) Air Quality Modeling and Submission of Modeling
Data: Section 110(a)(2)(K) of the CAA requires that SIPs provide for
performing air quality modeling so that effects on air quality of
emissions from NAAQS pollutants can be predicted and submission of such
data to the USEPA can be made. Regulation 391-3-1-.02(7)(b)(8),
``Prevention of Significant Deterioration of Air Quality (PSD)-Air
Quality Models,'' incorporates by reference 40 CFR 52.21(l), which
specifies that air modeling be conducted in accordance with 40 CFR part
51, Appendix W ``Guideline on Air Quality Models.'' This regulation
demonstrates that Georgia has the authority to perform air quality
modeling and to provide relevant data for the purpose of predicting the
effect on ambient air quality of the 2008 8-hour ozone NAAQS.
Additionally, Georgia supports a regional effort to coordinate the
development of emissions inventories and conduct regional modeling for
several NAAQS, including the 2008 8-hour ozone NAAQS, for the
Southeastern states. Taken as a whole, Georgia's air quality
regulations demonstrate that GA EPD has the authority to provide
relevant data for the purpose of predicting the effect on ambient air
quality of the 2008 8-hour ozone NAAQS. EPA has made the preliminary
determination that Georgia's SIP and practices adequately demonstrate
the State's ability to provide for air quality modeling, along with
analysis of the associated data, related to the 2008 8-hour ozone NAAQS
when necessary.
12. 110(a)(2)(L) Permitting fees: This element necessitates that
the SIP require the owner or operator of each major stationary source
to pay to the permitting authority, as a condition of any permit
required under the CAA, a fee sufficient to cover (i) the reasonable
costs of reviewing and acting upon any application for such a permit,
and (ii) if the owner or operator receives a permit for such source,
the reasonable costs of implementing and enforcing the terms and
conditions of any such permit (not including any court costs or other
costs associated with any enforcement action), until such fee
requirement is superseded with respect to such sources by the
Administrator's approval of a fee program under title V.
To satisfy these requirements, Georgia's infrastructure SIP
submission cites Rule 391-3-1-.03(9) ``Permit Fees,'' \21\ which
includes the federally approved title V fee program. Additionally,
Georgia's PSD and NNSR programs are funded by title V fees. Georgia's
authority to charge fees or require funding for processing PSD and NNSR
permits is provided for in the Georgia Air Quality Act: Article 1: Air
Quality (O.C.G.A. Section 12-9-10 Permit related fees; costs of public
notice). Georgia's fully approved title V operating permit program
covers the cost of implementation and enforcement
[[Page 42786]]
of PSD and NNSR permits after they have been issued. EPA has made the
preliminary determination that Georgia's practices adequately provide
for permitting fees related to the 2008 8-hour ozone NAAQS, when
necessary.
---------------------------------------------------------------------------
\21\ This rule is not approved into the federally approved SIP.
---------------------------------------------------------------------------
13. 110(a)(2)(M) Consultation and Participation by Affected Local
Entities: This element requires states to provide for consultation and
participation in SIP development by local political subdivisions
affected by the SIP. The Georgia Air Quality Act: Article 1: Air
Quality (O.C.G.A. Section 12-9-5 (b)(17) Powers and duties of Board of
Natural Resources as to air quality generally) establishes
``satisfactory processes of consultation and cooperation with local
governments or other designated organizations of elected officials or
federal agencies for purposes of planning [and implementation].''
Furthermore, GA EPD has demonstrated consultation with, and
participation by, affected local entities through its work with local
political subdivisions during the developing of its Transportation
Conformity SIP, and Regional Haze Implementation Plan. EPA has made the
preliminary determination that Georgia's SIP and practices adequately
demonstrate consultation with affected local entities related to the
2008 8-hour ozone NAAQS, when necessary.
V. Proposed Action
With the exception of the PSD permitting requirements for major
sources contained in section 110(a)(2)(C), (D)(i)(II) prong 3, and (J)
and the interstate transport requirements of section 110(a)(2)(D)(i)(I)
and (II) (prongs 1, 2 and 4), EPA is proposing to approve GA EPD's
infrastructure SIP submission, submitted May 14, 2012, for the 2008 8-
hour ozone NAAQS because it meets the above described infrastructure
SIP requirements. EPA is proposing to approve these portions of
Georgia's infrastructure SIP submission for the 2008 8-hour ozone NAAQS
because these aspects of the submission are consistent with section 110
of the CAA. EPA previously acted upon Georgia's infrastructure
submission for the PSD permitting requirements for major sources of
sections 110(a)(2)(C), (D)(i)(II) prong 3 and (J) on March 18, 2015,
and will address prongs 1, 2, and 4 of section 110(a)(2)(D)(i)(I) and
(II) in a separate action.
VI. Statutory and Executive Order Reviews
Under the CAA, the Administrator is required to approve a SIP
submission that complies with the provisions of the Act and applicable
federal regulations. See 42 U.S.C. 7410(k); 40 CFR 52.02(a). Thus, in
reviewing SIP submissions, EPA's role is to approve state choices,
provided that they meet the criteria of the CAA. Accordingly, this
proposed action merely approves state law as meeting federal
requirements and does not impose additional requirements beyond those
imposed by state law. For that reason, this proposed action:
is not a significant regulatory action subject to review
by the Office of Management and Budget under Executive Orders 12866 (58
FR 51735, October 4, 1993) and 13563 (76 FR 3821, January 21, 2011);
does not impose an information collection burden under the
provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);
is certified as not having a significant economic impact
on a substantial number of small entities under the Regulatory
Flexibility Act (5 U.S.C. 601 et seq.);
does not contain any unfunded mandate or significantly or
uniquely affect small governments, as described in the Unfunded
Mandates Reform Act of 1995 (Pub. L. 104-4);
does not have Federalism implications as specified in
Executive Order 13132 (64 FR 43255, August 10, 1999);
is not an economically significant regulatory action based
on health or safety risks subject to Executive Order 13045 (62 FR
19885, April 23, 1997);
is not a significant regulatory action subject to
Executive Order 13211 (66 FR 28355, May 22, 2001);
is not subject to requirements of Section 12(d) of the
National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272
note) because application of those requirements would be inconsistent
with the CAA; and
does not provide EPA with the discretionary authority to
address, as appropriate, disproportionate human health or environmental
effects, using practicable and legally permissible methods, under
Executive Order 12898 (59 FR 7629, February 16, 1994).
In addition, the Georgia SIP is not approved to apply on any Indian
reservation land or in any other area where EPA or an Indian tribe has
demonstrated that a tribe has jurisdiction. In those areas of Indian
country, the rule does not have tribal implications as specified by
Executive Order 13175 (65 FR 67249, November 9, 2000), nor will it
impose substantial direct costs on tribal governments or preempt tribal
law.
List of Subjects in 40 CFR Part 52
Environmental protection, Air pollution control, Incorporation by
reference, Intergovernmental relations, Nitrogen dioxide, Ozone,
Reporting and recordkeeping requirements, Volatile organic compounds.
Authority: 42 U.S.C. 7401 et seq.
Dated: July 6, 2015.
Heather McTeer Toney,
Regional Administrator, Region 4.
[FR Doc. 2015-17740 Filed 7-17-15; 8:45 am]
BILLING CODE 6560-50-P