DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP15-523-000]
American Midstream (Midla), LLC; Notice of Application
Take notice that on June 29, 2015, American Midstream (Midla), LLC
(Midla) filed an application with the Federal Energy Regulatory
Commission pursuant to section 7(c) of the Natural Gas Act (NGA)
requesting authority to construct its Natchez Pipeline, consisting of
approximately 51.97 miles of 12-inch-diameter pipeline and
approximately 0.5 miles of 4-inch-diameter lateral pipeline from
interconnections with Tennessee Gas Pipeline Company, L.L.C. and
Columbia Gulf Transmission, LLC in the Winnsboro, Louisiana area,
through Franklin, Catahoula, and Concordia Parishes, Louisiana, under
the Mississippi River, and into Adams County, Mississippi to the
Natchez, Mississippi area. The Natchez Pipeline will provide up to
48,300 Dekatherms per day at an estimated cost of $66.2 million, all as
more fully set forth in the application which is on file with the
Commission and open to public inspection.
This filing is available for review at the Commission in the Public
Reference Room or may be viewed on the Commission's Web site web at
http://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC at
[email protected] or call toll-free, (886) 208-3676 or TYY,
(202) 502-8659.
Any questions regarding the application should be directed to
Dennis J. Kelly, Senior Counsel for Midla, 1400 16th Street, Suite 300,
Denver, CO 80202, by phone at (720) 457-6076 or by email at
[email protected].
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below file with the Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a
motion to intervene in accordance
[[Page 42098]]
with the requirements of the Commission's Rules of Practice and
Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA
(18 CFR 157.10). A person obtaining party status will be placed on the
service list maintained by the Secretary of the Commission and will
receive copies of all documents filed by the applicant and by all other
parties. A party must submit seven copies of filings made in the
proceeding with the Commission and must mail a copy to the applicant
and to every other party. Only parties to the proceeding can ask for
court review of Commission orders in the proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to the party or parties directly
involved in the protest.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commentors will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commentors will not be required to serve copies of filed
documents on all other parties. However, the non-party commentors will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at http://www.ferc.gov. Persons unable to file electronically should
submit an original and seven copies of the protest or intervention to
the Federal Energy regulatory Commission, 888 First Street NE.,
Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern Time on July 31, 2015
Dated: July 10, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-17441 Filed 7-15-15; 8:45 am]