[Federal Register Volume 80, Number 130 (Wednesday, July 8, 2015)]
[Notices]
[Pages 39098-39099]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-16683]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2804-033]
Goose River Hydro, Inc.; Notice of Intent To File License
Application, Filing of Pre-Application Document, and Approving Use of
the Traditional Licensing Process
a. Type of Filing: Notice of Intent to File License Application and
Request to Use the Traditional Licensing Process.
b. Project No.: 2804-033.
c. Date Filed: May 29, 2015.
d. Submitted By: Goose River Hydro, Inc.
e. Name of Project: Goose River Hydroelectric Project.
f. Location: On the Goose River, in Waldo County, Maine. No federal
lands are occupied by the project works or located within the project
boundary.
g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
h. Potential Applicant Contact: Nicholas Cabral, Goose River Hydro,
Inc., 41 Sedgewood Drive, Kennebunk, ME 04043; (207) 604-4394; email:
[email protected].
i. FERC Contact: Julia Kolberg at (202) 502-8261; or email at
[email protected].
j. Goose River Hydro, Inc. filed its request to use the Traditional
Licensing Process on May 29, 2015. Goose River Hydro, Inc. provided
public notice of its request on May 29, 2015. In a letter dated June
30, 2015, the Director of the Division of Hydropower Licensing approved
Goose River Hydro, Inc.'s request to use the Traditional Licensing
Process.
k. With this notice, we are initiating informal consultation with
the U.S. Fish and Wildlife Service and/or NOAA Fisheries under section
7 of the Endangered Species Act and the joint agency regulations
thereunder at 50 CFR part 402; and NOAA Fisheries under section 305(b)
of the Magnuson-Stevens Fishery Conservation and Management Act and
implementing regulations at 50 CFR 600.920. We are also initiating
consultation with the Maine State Historic Preservation Officer, as
required by section 106, National Historic Preservation Act, and the
implementing regulations of the Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating Goose River Hydro, Inc. as
the Commission's non-federal representative for carrying out informal
consultation pursuant to section 7 of the Endangered Species Act and
section 305(b) of the Magnuson-Stevens Fishery Conservation and
Management Act; and consultation pursuant to section 106 of the
National Historic Preservation Act.
m. Goose River Hydro, Inc. filed a Pre-Application Document (PAD;
including a proposed process plan and schedule) with the Commission,
pursuant to 18 CFR 5.6 of the Commission's regulations.
n. A copy of the PAD is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's Web site
(http://www.ferc.gov), using the ``eLibrary'' link. Enter the docket
number, excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at
the address in paragraph h.
o. The licensee states its unequivocal intent to submit an
application for a new license for Project No. 2804. Pursuant to 18 CFR
16.8, 16.9, and 16.10 each application for a new license and any
competing license applications must be filed with the Commission at
least 24 months prior to the expiration of the existing license. All
applications for license for this project must be filed by March 20,
2018.
p. Register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
[[Page 39099]]
Dated: June 30, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-16683 Filed 7-7-15; 8:45 am]
BILLING CODE 6717-01-P