[Federal Register Volume 80, Number 127 (Thursday, July 2, 2015)]
[Rules and Regulations]
[Pages 37988-37992]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-15913]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 257
[EPA-HQ-RCRA-2015-0331; FRL-9928-44-OSWER]
RIN-2050-AE81
Technical Amendments to the Hazardous and Solid Waste Management
System; Disposal of Coal Combustion Residuals From Electric Utilities--
Correction of the Effective Date
AGENCY: Environmental Protection Agency.
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: The Environmental Protection Agency (EPA or the Agency) is
taking action to amend the final rule regulating the disposal of coal
combustion residuals (CCR) as solid waste under subtitle D of the
Resource Conservation and Recovery Act (RCRA). After publication in the
Federal Register, inconsistencies resulting from typographical errors
established two different effective dates in the regulatory text for
the final CCR rule. This action corrects these inconsistencies and
revises the Code of Federal Regulations (CFR) so that it accurately
reflects the statutory effective date of six months
[[Page 37989]]
from the publication date of the rule, coinciding with a date of
October 19, 2015. Consistent with Federal requirements, the EPA is also
correcting dates for certain provisions that fall on January 18, 2016,
which is a Federal holiday, to the next succeeding Federal business
day, which is January 19, 2016.
DATES: This final rule is effective on October 19, 2015. Effective July
2, 2015, the effective date of the final CCR rule published on April
17, 2015 at 80 FR 21302 is corrected from October 14, 2015 to October
19, 2015.
ADDRESSES: The EPA has established a docket for this regulatory action
under Docket ID No. EPA-HQ-RCRA-2015-0331. All documents in this docket
are available at http://www.regulations.gov. Although listed in the
index, some information is not publicly available, e.g., Confidential
Business Information (CBI) or other information whose disclosure is
restricted by statute. Certain other material, such as copyrighted
material, is not placed on the Internet and will be publicly available
only in hard copy form. Publicly available docket materials are
available either electronically in http://www.regulations.gov or in
hard copy at the OSWER Docket, EPA/DC, WJC West Building, Room 3334,
1301 Constitution Ave. NW., Washington, DC 20460. The Public Reading
Room is open from 8:30 a.m. to 4:30 p.m., Monday through Friday,
excluding legal holidays. The telephone number for the Public Reading
Room is (202) 566-1744, and the telephone number for the OSWER Docket
is 202-566-0276.
FOR FURTHER INFORMATION CONTACT: For more information on this
rulemaking, contact Steve Souders, Materials Recovery and Waste
Management Division, Office of Resource Conservation and Recovery (MC
5304 P), U.S. Environmental Protection Agency, telephone number: (703)
308-8431; fax number: (703) 605-0595; email address:
[email protected].
For more information on this rulemaking please visit: http://www.epa.gov/epawaste/nonhaz/industrial/special/fossil/index.htm.
SUPPLEMENTARY INFORMATION:
The Contents of This Preamble Are Listed in the Following Outline
I. General Information
II. Statutory Authority
III. Corrections Made to the Regulatory Text Regarding the Effective
Date
IV. Statutory and Executive Order Reviews
I. General Information
A. Does this action apply to me?
This rule applies to all coal combustion residuals (CCR) generated
by electric utilities and independent power producers that fall within
the North American Industry Classification System (NAICS) code 221112
and may affect the following entities: Electric utility facilities and
independent power producers that fall under the NAICS code 221112. The
industry sector(s) identified above may not be exhaustive; other types
of entities not listed could also be affected. The Agency's aim is to
provide a guide for readers regarding those entities that potentially
could be affected by this action. If you have any questions regarding
the applicability of this action to a particular entity, consult the
person listed in the preceding FOR FURTHER INFORMATION CONTACT section.
B. Why are these amendments being issued as a final rule?
Section 553 of the Administrative Procedure Act (APA), 5 U.S.C.
553(b)(3)(B), provides that, when an Agency for good cause finds that
notice and public procedures are impracticable, unnecessary or contrary
to the public interest, the Agency may issue a final rule without
providing notice and an opportunity for public comment. Similarly,
section 553(d) authorizes an Agency to establish an effective date for
a rule that is sooner than 30 days from its publication, ``as otherwise
provided by the agency for good cause found and published with the
rule.''
This final rule only revises the CFR to be consistent with the
requirements in RCRA section 4004(c) and the Office of the Federal
Register (OFR) regulation at 1 U.S.C. 18.17(b). The EPA is issuing this
rule solely to ensure that the CFR accurately reflects the date by
which, under current law, the provisions of the rule become effective.
Consequently, the EPA has determined that there is good cause for
making the technical amendments in this final rule without prior
proposal and opportunity for comment, because notice and public comment
would be unnecessary. For the same reasons, the EPA has concluded that
good cause exists for making the corrections in this final rule
effective July 2, 2015.
1. Different Effective Dates
After publication in the Federal Register, inconsistencies
resulting from typographical errors established two different effective
dates for the final CCR rule, one that accurately reflects the
statutory effective date, and a second, inaccurate date (80 FR 21302,
April 17, 2015). This action corrects these inconsistencies in the CFR,
so that it accurately reflects the effective date under RCRA section
4004(c) of six months from the publication date of the rule, i.e.,
October 19, 2015.
Section 4004 (c) of RCRA generally establishes a six month
effective date for rules issued under subtitle D, providing that ``the
prohibition contained in subsection (b) shall take effect on the date
six months after the date of promulgation of regulations under
subsection (a).'' 42 U.S.C. 6944(c). In other words, RCRA requires that
six months after promulgation of a rule under section 4004(a), solid
waste can only be managed in a manner that complies with the
requirements of the rule.
Under RCRA, promulgation of a rule occurs upon signature and
publication in the Federal Register. Horsehead Resource Development Co,
Inc., v. EPA, 130 F.3d 1090, 1094-1095 (D.C. Cir. 1997) (``We hold . .
. at least in the absence of a contrary agency regulation,
``promulgation'' as used in section [7006(a)(1) of RCRA] means the date
of Federal Register publication.''). Thus by operation of law, the
requirements in the final CCR rule go into effect six months from the
date of its publication in the Federal Register, or October 19, 2015.
Based on the rule published in the Federal Register (80 FR 21302, April
17, 2015), the CFR inaccurately reflects the current date by which
facilities must be in compliance with certain requirements. This action
merely corrects the CFR to accurately reflect these existing legal
obligations; it does not alter or affect them in any way, but merely
ensures that the public will not be confused by inaccuracies. The EPA
has therefore determined that further public comment on this action is
unnecessary and that good cause exists for making the corrections in
this final rule without prior publication or public comment.
2. Inconsistency With Other Federal Regulations
The EPA is also correcting dates for certain provisions that fall
on January 18, 2016, which is a Federal holiday. According to 1 CFR
18.07(b), ``where the final count would fall on a Saturday, Sunday, or
holiday, the date certain will be the next succeeding Federal business
day.'' To be consistent with 1 CFR 18.07(b), that date needs to be
revised to the next Federal business day, or January 19, 2016. Based on
the final CCR rule published in Federal Register (80 FR 21302), the CFR
inaccurately reflects the current date by which
[[Page 37990]]
facilities must be in compliance with these requirements. This action
merely corrects the CFR to ensure that the public will not be confused.
The EPA has therefore determined that further public comment on this
action is unnecessary and that good cause exists for making the
corrections in this final rule without prior publication or public
comment.
II. Statutory Authority
This regulation is established under the authority of sections
1008(a), 2002(a), 3001, 4004, and 4005(a) of the Solid Waste Disposal
Act of 1970, as amended by the Resource Conservation and Recovery Act
of 1976, as amended by the Hazardous and Solid Waste Amendments of 1984
(HSWA), 42 U.S.C. 6906(b), 6907(a), 6912(a), 6944 and 6945(a).
III. Corrections Made to the Regulatory Text Regarding the Effective
Date
In drafting the final CCR rule, the Agency used the following two
bracketed ``instructions'' when referring to the effective date of the
CCR rule: (1) [INSERT DATE 180 DAYS AFTER THE DATE OF PUBLICATION IN
THE Federal Register]; and (2) [INSERT DATE SIX MONTHS AFTER THE DATE
OF PUBLICATION IN THE Federal Register]. These ``instructions''
provided direction to the OFR for computing and inserting a specified
date, in this case, the effective date of the rule.
On April 17, 2015, the CCR rule was published in the Federal
Register (80 FR 21302). After publication, the EPA discovered that the
two ``instructions'' used to calculate the effective date had resulted
in the computing and inserting of two different effective dates, rather
than single effective date established under RCRA 4004(c). The first
``instruction'' used in the CCR rule for the effective date exactly
mirrored the statutory language, i.e., [INSERT DATE 6 MONTHS AFTER DATE
OF PUBLICATION IN THE Federal Register], which resulted in a date of
October 19, 2015. By contrast, the second ``instruction,'' paraphrased
the statute, i.e., [INSERT DATE 180 DAYS AFTER THE DATE OF PUBLICATION
IN THE Federal Register], which resulted in a date of October 14, 2015.
In order to correct this error, the EPA is issuing this final rule to
revise the CFR so that it accurately reflects the existing effective
date for the CCR rule established by RCRA section 4004 (c), i.e.,
October 19, 2015, which is consistent with the ``instruction'' of:
[INSERT DATE SIX MONTHS AFTER THE DATE OF PUBLICATION IN THE Federal
Register].
In addition at Sec. 257.83(b)(3) and Sec. 257.84(b)(3)(i)
(Inspection requirements for CCR surface impoundments and CCR landfills
respectively) the instructions for calculating and inserting dates in
these two sections of the CCR rule were: [INSERT DATE NINE MONTHS AFTER
THE DATE OF PUBLICATION IN THE Federal Register]. After publication,
the EPA discovered that the computed and inserted date for these
provisions was January 18, 2016, which is a Federal holiday. According
to 1 CFR 18.07(b) ``where the final count would fall on a Saturday,
Sunday, or holiday, the date certain will be the next succeeding
Federal business day when a date falls on a weekend or a Federal
holiday, the [Office of Federal Register] uses the next Federal
business day.'' To be consistent with 1 CFR 18.07(b), that date needs
to be revised to the next Federal business day, or January 19, 2016.
Based on the rule published in the Federal Register, the CFR
inaccurately reflects the current date by which facilities must be in
compliance with these requirements.
In order to aid the public, the following table identifies those
sections of the rule which contained particular dates that the EPA is
correcting in this action, as well as those sections where no
correction is needed. The first column of the following table
identifies those sections of the CCR rule where the date of October 14,
2015 was inserted. These sections of the rule are being corrected in
this final rule to establish the correct date of October 19, 2015. The
second column of the table identifies those rule provisions where the
date of January 18, 2016, a Federal holiday, was inserted. These
sections of the rule are being corrected to establish the correct date
of January 19, 2016. The third column of the table identifies those
sections of the regulatory text where the correct effective date of
October 19, 2015 was inserted. These sections will not be changed.
------------------------------------------------------------------------
Rule provisions with an Rule provisions with Rule provisions with
October 14, 2015 effective a date of January the correct October
date that will be changed to 18, 2016 that will 19, 2015 effective
October 19, 2015 be changed to date
----------------------------- January 19, 2016 ---------------------
----------------------
Regulatory cite Regulatory cite Regulatory cite
------------------------------------------------------------------------
Sec. 257.53 (Definitions) Sec. 257.83(b)(3) Sec. 257.50(d) and
``active facility'' or (Inspection (e) (Scope and
``active electric utilities requirements for purpose).
or independent power CCR surface
producers'' ``existing CCR impoundments).
landfill'' ``existing CCR
surface impoundment''
``inactive CCR surface
impoundment'' ``lateral
expansion'' ``new CCR
landfill'' ``new CCR
surface impoundment''.
Sec. Sec. 257.51
257.84(b)(3)(i) (Effective date of
(Inspection this subpart).
requirements for
CCR landfills).
Sec. 257.80(b)(5)
(Air criteria).
Sec. 257.83(a)(2)
(Inspection
requirements for
CCR surface
impoundments).
Sec. 257.84(a)(2)
(Inspection
requirements for
CCR landfills).
Sec. 257.91(d)(2)
(Multiunit
groundwater
monitoring
systems).
Sec. 257.101(a)(1)
(Closure of unlined
impoundments).
------------------------------------------------------------------------
In addition to the inconsistencies in the regulatory text, the
preamble to the final CCR rule also contained several incorrect
effective dates: (1) 80 FR 21302: The DATES section in the preamble
states that the effective date of the rule is October 14, 2015 (180
days from the publication date) instead of the correct date of October
19, 2015; and (2) 80 FR 21467: EPA included a sentence in the
Congressional Review Act Executive Order stating that the CCR
[[Page 37991]]
rule ``will be effective 180 days after publication in the Federal
Register'' which equates to October 14, 2015, instead of stating that
the CCR rule ``will be effective six months after publication in the
Federal Register'' which equates to October 19, 2015. While the Agency
is not correcting the CCR rule preamble language, it is presenting
these additional inconsistencies to provide the reader with a complete
accounting of the error.
IV. Statutory and Executive Order Reviews
A. Executive Order 12866: Regulatory Planning and Review and Executive
Order 13563: Improving Regulation and Regulatory Review
This action is not a significant regulatory action and was
therefore not submitted to the Office of Management and Budget (OMB)
for review.
B. Paperwork Reduction Act (PRA)
This action is not a significant regulatory action and does not
impose an information collection burden under the PRA. The changes made
to the regulations as a result of this action impose no new or
different reporting requirements on regulated parties.
C. Regulatory Flexibility Act
This action does not modify existing legal requirements applicable
to any entity. As such, I certify that this action will not have a
significant economic impact on a substantial number of small entities
under the RFA. In making this determination, the impact of concern is
any significant adverse economic impact on small entities. An agency
may certify that a rule will not have a significant economic impact on
a substantial number of small entities if the rule relieves regulatory
burden, has no net burden or otherwise has a positive economic effect
on the small entities subject to the rule. This action corrects a
typographical error that resulted in the calculation of an incorrect
effective date in some sections of the regulation. This action merely
corrects that error so that the CFR will reflect the existing effective
date for the CCR rule of October 19, 2015, established by section 4004
(c) of RCRA. This action also corrects the dates in two provisions of
the CCR rule, which, as published, fall on a Federal holiday. This
action corrects the error and revises the CFR to reflect that,
consistent with 1 CFR 18.07(b), the correct the date for these two
provisions is the next Federal business day after the holiday or
January 19, 2016. The impacts on small businesses were already
addressed in the rule promulgated on April 17, 2015 (80 FR 21302); and
this rule will not impose any requirements on small entities beyond
those that have previously been analyzed. We have therefore concluded
that this action will have no net regulatory burden for small entities.
D. Unfunded Mandates Reform Act (UMRA)
This action does not contain any unfunded mandate as described in
UMRA, 2 U.S.C. 1531-1538, and does not significantly or uniquely affect
small governments. This action implements mandates specifically and
explicitly set forth in the Resource Conservation and Recovery Act
without the exercise of any policy discretion by the EPA.
E. Executive Order 13132: Federalism
This action does not have federalism implications. It will not have
substantial direct effects on the states, on the relationship between
the national government and the states, or on the distribution of power
and responsibilities among the various levels of government.
F. Executive Order 13175: Consultation and Coordination With Indian
Tribal Governments
This action does not have tribal implications, as specified in
Executive Order 13175. This action merely corrects typographical errors
that resulted in the calculation of an incorrect effective date in some
sections of the CCR rule. Thus Executive Order 13175 does not apply to
this action.
G. Executive Order 13045: Protection of Children From Environmental
Health Risks and Safety Risks
The EPA interprets E.O. 13045 as applying only to those regulatory
actions that concern environmental health or safety risks that the EPA
has reason to believe may disproportionately affect children, per the
definition of ``covered regulatory action'' in section 2-202 of the
Executive Order. This action is not subject to Executive Order 13045
because does not establish an environmental standard intended to
mitigate health or safety risks. This action merely corrects
typographical errors that resulted in the calculation of incorrect
effective dates in some sections of the CFR.
H. Executive Order 13211: Actions Concerning Regulations That
Significantly Affect Energy Supply, Distribution, or Use
This action is not subject to Executive Order 13211 because it is
not a significant regulatory action under Executive Order 12866.
I. National Technology Transfer and Advancement Act
This rulemaking does not involve technical standards.
J. Executive Order 12898: Federal Actions To Address Environmental
Justice in Minority Populations and Low-Income Populations
This rule merely corrects errors in dates and does not concern an
environmental health or safety risk. Therefore, Executive Order 12898
does not apply.
K. Congressional Review Act
This action is subject to the CRA, and the EPA will submit a rule
report to each House of Congress and to the Comptroller General of the
United States. This action is not a ``major rule'' as defined by U.S.C.
804(2).
List of Subjects in 40 CFR Part 257
Environmental protection, Beneficial use, Coal combustion products,
Coal combustion residuals, Coal combustion waste, Disposal, Hazardous
waste, Landfill, Surface impoundment.
Dated: June 16, 2015.
Mathy Stanislaus,
Assistant Administrator, Office of Solid Waste and Emergency Response.
For the reasons set out in the preamble, title 40, chapter I, of
the Code of Federal Regulations is amended as follows:
PART 257--CRITERIA FOR CLASSIFICATION OF SOLID WASTE DISPOSAL
FACILITIES AND PRACTICES
0
1. The authority citation for part 257 continues to read as follows:
Authority: 42 U.S.C. 6907(a)(3), 6912(a)(1), 6944(a); 33 U.S.C.
1345(d) and (e).
0
2. Section 257.53 is amended by revising the definitions of ``Active
facility or active electric utilities or independent power producers'',
``Existing CCR landfill'', ``Existing CCR surface impoundment'',
``Inactive CCR surface impoundment'', ``Lateral expansion'', ``New CCR
landfill'', and ``New CCR surface impoundment'' to read as follows:
[[Page 37992]]
Sec. 257.53 Definitions.
* * * * *
Active facility or active electric utilities or independent power
producers means any facility subject to the requirements of this
subpart that is in operation on October 19, 2015. An electric utility
or independent power producer is in operation if it is generating
electricity that is provided to electric power transmission systems or
to electric power distribution systems on or after October 19, 2015. An
off-site disposal facility is in operation if it is accepting or
managing CCR on or after October 19, 2015.
* * * * *
Existing CCR landfill means a CCR landfill that receives CCR both
before and after October 19, 2015, or for which construction commenced
prior to October 19, 2015 and receives CCR on or after October 19,
2015. A CCR landfill has commenced construction if the owner or
operator has obtained the federal, state, and local approvals or
permits necessary to begin physical construction and a continuous on-
site, physical construction program had begun prior to October 19,
2015.
Existing CCR surface impoundment means a CCR surface impoundment
that receives CCR both before and after October 19, 2015, or for which
construction commenced prior to October 19, 2015 and receives CCR on or
after October 19, 2015. A CCR surface impoundment has commenced
construction if the owner or operator has obtained the federal, state,
and local approvals or permits necessary to begin physical construction
and a continuous on-site, physical construction program had begun prior
to October 19, 2015.
* * * * *
Inactive CCR surface impoundment means a CCR surface impoundment
that no longer receives CCR on or after October 19, 2015 and still
contains both CCR and liquids on or after October 19, 2015.
* * * * *
Lateral expansion means a horizontal expansion of the waste
boundaries of an existing CCR landfill or existing CCR surface
impoundment made after October 19, 2015.
* * * * *
New CCR landfill means a CCR landfill or lateral expansion of a CCR
landfill that first receives CCR or commences construction after
October 19, 2015. A new CCR landfill has commenced construction if the
owner or operator has obtained the federal, state, and local approvals
or permits necessary to begin physical construction and a continuous
on-site, physical construction program had begun after October 19,
2015. Overfills are also considered new CCR landfills.
New CCR surface impoundment means a CCR surface impoundment or
lateral expansion of an existing or new CCR surface impoundment that
first receives CCR or commences construction after October 19, 2015. A
new CCR surface impoundment has commenced construction if the owner or
operator has obtained the federal, state, and local approvals or
permits necessary to begin physical construction and a continuous on-
site, physical construction program had begun after October 19, 2015.
* * * * *
0
3. Section 257.83 is amended by revising paragraph (b)(3)(i) to read as
follows:
Sec. 257.83 Inspection requirements for CCR surface impoundments.
* * * * *
(b) * * *
(3) * * * (i) Existing CCR surface impoundments. The owner or
operator of the CCR unit must complete the initial inspection required
by paragraphs (b)(1) and (2) of this section no later than January 19,
2016.
* * * * *
0
4. Section 257.84 is amended by revising paragraph (b)(3)(i) to read as
follows:
Sec. 257.84 Inspection requirements for CCR landfills.
* * * * *
(b) * * *
(3) * * * (i) Existing CCR landfills. The owner or operator of the
CCR unit must complete the initial inspection required by paragraphs
(b)(1) and (2) of this section no later than January 19, 2016.
* * * * *
[FR Doc. 2015-15913 Filed 7-1-15; 8:45 am]