[Federal Register Volume 80, Number 40 (Monday, March 2, 2015)]
[Notices]
[Pages 11236-11239]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-04292]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-247; NRC-2015-0038]
Entergy Nuclear Operations, Inc., Indian Point Nuclear
Generating, Unit 2
AGENCY: Nuclear Regulatory Commission.
ACTION: License amendment application; opportunity to comment, request
a hearing, and petition for leave to intervene.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is considering
issuance of an amendment to Facility Operating License No. DPR-26,
issued to Entergy Nuclear Operations, Inc., for operation of the Indian
Point Nuclear Generating, Unit 2. The proposed amendment would allow a
revision to the acceptance criteria for the Surveillance Requirement
3.1.4.2 for Control Rod G-3. During the last two performances of this
Surveillance on September 18, 2014, and December 11, 2014, Control Rod
G-3 misalignment occurred with Shutdown Bank B group movement as
displayed by the Individual Rod Position Indication and Plant
Instrument Computer System. The proposed change is to defer subsequent
testing of the Control Rod G-3 until repaired during the next refuel
outage (March 2016) or forced outage long enough to repair the Control
Rod.
DATES: Submit comments by April 1, 2015. Requests for a hearing or
petition for leave to intervene must be filed by May 1, 2015.
ADDRESSES: You may submit comments by any of the following methods
(unless this document describes a different method for submitting
comments on a specific subject):
Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2015-0038. Address
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact
the individual listed in the FOR FURTHER INFORMATION CONTACT section of
this document.
Mail comments to: Cindy Bladey, Office of Administration,
Mail Stop: OWFN-12-H08, U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001.
For additional direction on obtaining information and submitting
comments, see ``Obtaining Information and Submitting Comments'' in the
SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: Douglas V. Pickett, Office of Nuclear
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001; telephone: 301-415-1364, email: [email protected].
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC-2015-0038 when contacting the NRC
about the availability of information for this action. You may obtain
publicly-available information related to this action by any of the
following methods:
Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2015-0038.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly-available documents online in the
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS,
please contact the NRC's Public Document Room (PDR) reference staff at
1-800-397-4209, 301-415-4737, or by email to [email protected]. The
Proposed License Amendment Regarding a Change to Technical
Specification 3.1.4, ``Reactivity Control Systems'', is available in
ADAMS under Accession No. ML15044A471.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
B. Submitting Comments
Please include Docket ID NRC-2015-0038 in the subject line of your
comment submission, in order to ensure that the NRC is able to make
your comment submission available to the public in this docket.
The NRC cautions you not to include identifying or contact
information that you do not want to be publicly disclosed in your
comment submission. The NRC posts all comment submissions at http://www.regulations.gov as well as entering the comment submissions into
ADAMS. The NRC does not routinely edit comment submissions to remove
identifying or contact information.
If you are requesting or aggregating comments from other persons
for submission to the NRC, then you should inform those persons not to
include identifying or contact information that they do not want to be
publicly disclosed in their comment submission. Your request should
state that the NRC does not routinely edit comment submissions to
remove such information before making the comment submissions available
to the public or entering the comment submissions into ADAMS.
I. Introduction
The NRC is considering issuance of an amendment to Facility
Operating License No. DPR-26, issued to Entergy Nuclear Operations,
Inc., for operation of the Indian Point Nuclear Generating, Unit 2,
located in Westchester County, New York.
The proposed amendment would allow a revision to the acceptance
criteria for Surveillance Requirement 3.1.4.2 for Control Rod G-3.
During the last two performances of this Surveillance on September 18,
2014, and December 11, 2014, Control Rod G-3 misalignment occurred with
Shutdown Bank B group movement as displayed by the Individual Rod
Position Indication and Plant Instrument Computer System. The proposed
change is to defer subsequent testing of the Control Rod G-3 until
repaired during the next refuel outage (March 2016) or forced outage
long enough to repair the Control Rod.
Before any issuance of the proposed license amendment, the NRC will
need to make the findings required by the
[[Page 11237]]
Atomic Energy Act of 1954, as amended (the Act), and NRC's regulations.
The NRC has made a proposed determination that the license
amendment request involves no significant hazards consideration. Under
the NRC's regulations in Sec. 50.92 of Title 10 of the Code of Federal
Regulations (10 CFR), this means that operation of the facility in
accordance with the proposed amendment would not (1) involve a
significant increase in the probability or consequences of an accident
previously evaluated; or (2) create the possibility of a new or
different kind of accident from any accident previously evaluated; or
(3) involve a significant reduction in a margin of safety. As required
by 10 CFR 50.91(a), the licensee has provided its analysis of the issue
of no significant hazards consideration, which is presented below:
1. Does the proposed License amendment involve a significant
increase in the probability or consequences of an accident
previously evaluated?
Response: No.
The proposed change revises the requirement to perform SR
3.1.4.2 testing on Control Rod G-3 until the next refuel outage or
forced outage of sufficient duration. Performing a technical
specification surveillance test is not an accident initiator and
does not increase the probability of an accident occurring. Since
the control rod remains operable, the proposed change does not
affect or create any accident initiators or precursors. The proposed
revision to the test frequency is based on the ability of the
control rod to continue to be able to perform its design function.
The safety analyses assume control rod full insertion be [by] de-
energizing the CRDM coils and not the ability to move a full length
control rod by its drive mechanism. The last rod drop test verified
this ability so there is no increase in the consequences of an
accident.
Therefore the proposed change does not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed License amendment create the possibility of
a new or different kind of accident from any accident previously
evaluated?
Response: No.
The proposed change revises the requirement to perform SR
3.1.4.2 testing on Control Rod G-3 by changing the frequency of the
test. The proposed change does not involve installation of new
equipment or modification of existing equipment, so that no new
equipment failure modes are introduced. Also, the proposed change in
test frequency does not result in a change to the way that the
equipment or facility is operated so that no new accident initiators
are created.
Therefore the proposed change does not create the possibility of
a new or different kind of accident from any accident previously
evaluated.
3. Does the proposed License amendment involve a significant
reduction in a margin of safety?
Response: No.
The conduct of performance tests on safety-related plant
equipment is a means of assuring that the equipment is capable of
performing its intended safety function and therefore maintaining
the margin of safety established in the safety analysis for the
facility. The proposed change revises the requirement to perform SR
3.1.4.2 testing on Control Rod G-3 by changing the frequency of the
test. The proposed change is based [on] the fact that there have
been no problems with past tests of the Control Rod G-3 indicating
the [that] there are no problems with binding that could prevent the
rod from inserting and a 12 hour surveillance on rod position that
would indicate any changes in position. There are no indications
that the trip function would not work assuring the reduction in
margin of safety is not significant.
Therefore, the proposed changes do not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
license amendment request involves a No Significant Hazards
Consideration.
The NRC is seeking public comments on this proposed determination
that the license amendment request involves no significant hazards
consideration. Any comments received within 30 days after the date of
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendment until the
expiration of 60 days after the date of publication of this notice. The
Commission may issue the license amendment before expiration of the 60-
day notice period if the Commission concludes the amendment involves no
significant hazards consideration. In addition, the Commission may
issue the amendment prior to the expiration of the 30-day comment
period should circumstances change during the 30-day comment period
such that failure to act in a timely way would result, for example, in
derating or shutdown of the facility. Should the Commission take action
prior to the expiration of either the comment period or the notice
period, it will publish in the Federal Register a notice of issuance.
Should the Commission make a final No Significant Hazards Consideration
Determination, any hearing will take place after issuance. The
Commission expects that the need to take this action will occur very
infrequently.
II. Opportunity To Request a Hearing and Petition for Leave To
Intervene
Within 60 days after the date of publication of this Federal
Register notice, any person whose interest may be affected by this
proceeding and who desires to participate as a party in the proceeding
must file a written request for hearing or a petition for leave to
intervene specifying the contentions which the person seeks to have
litigated in the hearing with respect to the license amendment request.
Requests for hearing and petitions for leave to intervene shall be
filed in accordance with the NRC's ``Agency Rules of Practice and
Procedure'' in 10 CFR part 2. Interested person(s) should consult a
current copy of 10 CFR 2.309, which is available at the NRC's PDR. The
NRC's regulations are accessible electronically from the NRC Library on
the NRC's Web site at http://www.nrc.gov/reading-rm/doc-collections/cfr/.
As required by 10 CFR 2.309, a request for hearing or petition for
leave to intervene must set forth with particularity the interest of
the petitioner in the proceeding and how that interest may be affected
by the results of the proceeding. The hearing request or petition must
specifically explain the reasons why intervention should be permitted,
with particular reference to the following general requirements: (1)
The name, address, and telephone number of the requestor or petitioner;
(2) the nature of the requestor's/petitioner's right under the Act to
be made a party to the proceeding; (3) the nature and extent of the
requestor's/petitioner's property, financial, or other interest in the
proceeding; and (4) the possible effect of any decision or order which
may be entered in the proceeding on the requestor's/petitioner's
interest. The hearing request or petition must also include the
specific contentions that the requestor/petitioner seeks to have
litigated at the proceeding.
For each contention, the requestor/petitioner must provide a
specific statement of the issue of law or fact to be raised or
controverted, as well as a brief explanation of the basis for the
contention. Additionally, the requestor/petitioner must demonstrate
that the issue raised by each contention is within the scope of the
proceeding and is material to the findings that the NRC must make to
support the granting of a license amendment in response to the
application. The hearing request or petition must also include a
concise statement of the alleged facts or expert opinion that support
the contention and on which the requestor/petitioner
[[Page 11238]]
intends to rely at the hearing, together with references to those
specific sources and documents. The hearing request or petition must
provide sufficient information to show that a genuine dispute exists
with the applicant on a material issue of law or fact, including
references to specific portions of the application for amendment that
the petitioner disputes and the supporting reasons for each dispute. If
the requestor/petitioner believes that the application for amendment
fails to contain information on a relevant matter as required by law,
the requestor/petitioner must identify each failure and the supporting
reasons for the requestor's/petitioner's belief. Each contention must
be one which, if proven, would entitle the requestor/petitioner to
relief. A requestor/petitioner who does not satisfy these requirements
for at least one contention will not be permitted to participate as a
party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene,
and have the opportunity to participate fully in the conduct of the
hearing with respect to resolution of that person's admitted
contentions, including the opportunity to present evidence and to
submit a cross-examination plan for cross-examination of witnesses,
consistent with NRC regulations, policies, and procedures. The Atomic
Safety and Licensing Board will set the time and place for any
prehearing conferences and evidentiary hearings, and the appropriate
notices will be provided.
Hearing requests or petitions for leave to intervene must be filed
no later than 60 days from the date of publication of this notice.
Requests for hearing, petitions for leave to intervene, and motions for
leave to file new or amended contentions that are filed after the 60-
day deadline will not be entertained absent a determination by the
presiding officer that the filing demonstrates good cause by satisfying
the three factors in 10 CFR 2.309(c)(1)(i)-(iii).
If a hearing is requested, the Commission will make a final
determination on the issue of no significant hazards consideration. The
final determination will serve to decide when the hearing is held. If
the final determination is that the amendment request involves no
significant hazards consideration, the Commission may issue the
amendment and make it immediately effective, notwithstanding the
request for a hearing. Any hearing held would take place after issuance
of the amendment. If the final determination is that the amendment
request involves a significant hazards consideration, then any hearing
held would take place before the issuance of any amendment unless the
Commission finds an imminent danger to the health or safety of the
public, in which case it will issue an appropriate order or rule under
10 CFR part 2.
III. Electronic Submissions (E-Filing)
All documents filed in NRC adjudicatory proceedings, including a
request for hearing, a petition for leave to intervene, any motion or
other document filed in the proceeding prior to the submission of a
request for hearing or petition to intervene, and documents filed by
interested governmental entities participating under 10 CFR 2.315(c),
must be filed in accordance with the NRC's E-Filing rule (72 FR 49139;
August 28, 2007). The E-Filing process requires participants to submit
and serve all adjudicatory documents over the internet, or in some
cases to mail copies on electronic storage media. Participants may not
submit paper copies of their filings unless they seek an exemption in
accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least
ten 10 days prior to the filing deadline, the participant should
contact the Office of the Secretary by email at [email protected],
or by telephone at 301-415-1677, to request (1) a digital
identification (ID) certificate, which allows the participant (or its
counsel or representative) to digitally sign documents and access the
E-Submittal server for any proceeding in which it is participating; and
(2) advise the Secretary that the participant will be submitting a
request or petition for hearing (even in instances in which the
participant, or its counsel or representative, already holds an NRC-
issued digital ID certificate). Based upon this information, the
Secretary will establish an electronic docket for the hearing in this
proceeding if the Secretary has not already established an electronic
docket.
Information about applying for a digital ID certificate is
available on the NRC's public Web site at http://www.nrc.gov/site-help/e-submittals/getting-started.html. System requirements for accessing
the E-Submittal server are detailed in the NRC's ``Guidance for
Electronic Submission,'' which is available on the agency's public Web
site at http://www.nrc.gov/site-help/e-submittals.html. Participants
may attempt to use other software not listed on the Web site, but
should note that the NRC's E-Filing system does not support unlisted
software, and the NRC Meta System Help Desk will not be able to offer
assistance in using unlisted software.
If a participant is electronically submitting a document to the NRC
in accordance with the E-Filing rule, the participant must file the
document using the NRC's online, Web-based submission form. In order to
serve documents through the Electronic Information Exchange System,
users will be required to install a Web browser plug-in from the NRC's
Web site. Further information on the Web-based submission form,
including the installation of the Web browser plug-in, is available on
the NRC's public Web site at http://www.nrc.gov/site-help/e-submittals.html.
Once a participant has obtained a digital ID certificate and a
docket has been created, the participant can then submit a request for
hearing or petition for leave to intervene. Submissions should be in
Portable Document Format (PDF) in accordance with NRC guidance
available on the NRC's public Web site at http://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the time the
documents are submitted through the NRC's E-Filing system. To be
timely, an electronic filing must be submitted to the E-Filing system
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of
a transmission, the E-Filing system time-stamps the document and sends
the submitter an email notice confirming receipt of the document. The
E-Filing system also distributes an email notice that provides access
to the document to the NRC's Office of the General Counsel and any
others who have advised the Office of the Secretary that they wish to
participate in the proceeding, so that the filer need not serve the
documents on those participants separately. Therefore, applicants and
other participants (or their counsel or representative) must apply for
and receive a digital ID certificate before a hearing request/petition
to intervene is filed so that they can obtain access to the document
via the E-Filing system.
A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC Meta System
Help Desk through the ``Contact Us'' link located on the NRC's public
Web site at http://www.nrc.gov/site-help/e-submittals.html, by email to
[email protected], or by a toll-free call at 1-866-672-7640. The
NRC Meta System Help Desk is available
[[Page 11239]]
between 8 a.m. and 8 p.m., Eastern Time, Monday through Friday,
excluding government holidays.
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, Sixteenth
Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland
20852, Attention: Rulemaking and Adjudications Staff. Participants
filing a document in this manner are responsible for serving the
document on all other participants. Filing is considered complete by
first-class mail as of the time of deposit in the mail, or by courier,
express mail, or expedited delivery service upon depositing the
document with the provider of the service. A presiding officer, having
granted an exemption request from using E-Filing, may require a
participant or party to use E-Filing if the presiding officer
subsequently determines that the reason for granting the exemption from
use of E-Filing no longer exists.
Documents submitted in adjudicatory proceedings will appear in the
NRC's electronic hearing docket which is available to the public at
http://ehd1.nrc.gov/ehd/, unless excluded pursuant to an order of the
Commission, or the presiding officer. Participants are requested not to
include personal privacy information, such as social security numbers,
home addresses, or home phone numbers in their filings, unless an NRC
regulation or other law requires submission of such information.
However, a request to intervene will require including information on
local residence in order to demonstrate a proximity assertion of
interest in the proceeding. With respect to copyrighted works, except
for limited excerpts that serve the purpose of the adjudicatory filings
and would constitute a Fair Use application, participants are requested
not to include copyrighted materials in their submission.
For further details with respect to this action, see the
application for license amendment dated February 12, 2015 (ADAMS
Accession No. ML15044A471).
Attorney for licensee: Jeanne Cho, Assistant General Counsel,
Entergy Nuclear Operations, Inc., 440 Hamiliton Avenue, White Plains,
NY 10601.
NRC Branch Chief: Benjamin Beasley.
Dated at Rockville, Maryland, this 23rd day of February 2015.
For the Nuclear Regulatory Commission.
Douglas V. Pickett,
Senior Project Manager, Plant Licensing Branch I-1, Division of
Operating Reactor Licensing, Office of Nuclear Reactor Regulation.
[FR Doc. 2015-04292 Filed 2-27-15; 8:45 am]