[Federal Register Volume 80, Number 11 (Friday, January 16, 2015)]
[Notices]
[Pages 2407-2408]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-00574]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14657-000]
Appalachian Mountain Club; Notice of Application Tendered for
Filing With the Commission and Soliciting Additional Study Requests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Original Minor License.
b. Project No.: 14657-000.
c. Date filed: December 29, 2014.
d. Applicant: Appalachian Mountain Club.
e. Name of Project: Zealand Falls Hydroelectric Project.
f. Location: On Whitehall Brook, in the Town of Bethlehem, Grafton
County, New Hampshire. The project would occupy 0.66 acres of federal
land managed by the U.S. Forest Service.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
[[Page 2408]]
h. Applicant Contact: James Wrigley, Appalachian Mountain Club,
P.O. Box 298, Gorham, New Hampshire 03581, (603) 466-8110.
i. FERC Contact: John Baummer, (202) 502-6837,
[email protected].
j. Cooperating agencies: Federal, State, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item l below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See, 94 FERC ]
61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission by the deadline
listed in item l below.
l. Deadline for filing additional study requests and requests for
cooperating agency status: With this notice, we are waiving the 60-day
timeframe in Section 4.32(b)(7) of 18 CFR for requesting additional
studies and requests for cooperating agency status. Instead, requests
for studies and cooperating agency status are due 30 days from the date
of this notice.
The Commission strongly encourages electronic filing. Please file
additional study requests and requests for cooperating agency status
using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support
at [email protected], (866) 208-3676 (toll free), or (202)
502-8659 (TTY). In lieu of electronic filing, please send a paper copy
to: Secretary, Federal Energy Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first page of any filing should include
docket number P-14657-000.
m. The application is not ready for environmental analysis at this
time.
n. The existing, unlicensed Zealand Falls Hydroelectric Project
consists of: (1) A 27-foot-long, 3-inch diameter intake pipe with a 1/
8-inch welded wire debris screen; (2) a 50.5-inch-long, 26.5-inch-wide,
31-inch-high settling tank; (3) a 1,374-foot-long penstock consisting
of a 970-foot-long, 3-inch-diameter section connected to a 404-foot-
long, 2-inch diameter section; (4) a 47.75-inch-wide, 41.25-inch-long
generator shed; (5) a single turbine-generator unit with an installed
capacity of 2.5 kilowatts; (6) a 6.5-foot-long, 3-inch diameter drain
line; (7) a buried 300-foot-long, 48-volt transmission line connecting
the turbine-generator unit to Zealand Falls Hut; and (8) appurtenant
facilities. The project generates approximately 1,010 kilowatt-hours
annually. The applicant proposes to continue operating the project in a
run-of-river mode.
o. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at http://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
p. Procedural schedule: The application will be processed according
to the following preliminary schedule. Revisions to the schedule will
be made as appropriate.
------------------------------------------------------------------------
------------------------------------------------------------------------
Issue Notice Ready for Environmental March 2015.
Analysis.
Issue Notice of the Availability of the June 2015.
EA.
------------------------------------------------------------------------
Dated: January 9, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-00574 Filed 1-15-15; 8:45 am]