DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No., 14593-000]


 Patman Power, LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

    On February 28, 2014, Wright Patman Power, LLC filed an application 
for a preliminary permit, pursuant to section 4(f) of the Federal Power 
Act (FPA), proposing to study the feasibility of a hydropower project 
to be located at the U.S. Army Corps of Engineers' (Corps) Wright 
Patman Dam, on the Sulphur River near the town of Texarkana in Bowie 
County, Texas. The sole purpose of a preliminary permit, if issued, is 
to grant the permit holder priority to file a license application 
during the permit term. A preliminary permit does not authorize the 
permit holder to perform any land-disturbing activities or otherwise 
enter upon lands or waters owned by others without the owners' express 
permission.
    The proposed project would consist of the following: (1) Three 48 
inch-diameter, 300-foot-long steel penstocks; (2) three inline 
generation units with a total capacity of 4-megawatts; (3) a switchyard 
on the south bank adjacent to the dam; (4) a 1-mile-long, 138kV 
transmission line.
    The project would have an average annual generation of 10,000 
megawatt-hours and operate utilizing surplus water from the Wright 
Patman Lake, as directed by the Corps.
    Applicant Contact: Mr. Magn[uacute]s J[oacute]hannesson, Wister 
Power, LLC, 46 Peninsula Center, Suite E, Rolling Hills Estates, CA 
90274. (310) 699-6400.

[[Page 47104]]

    FERC Contact: Christiane Casey, [email protected], (202) 
502-8577.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and 
competing applications may be filed electronically via the Internet. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
Web site http://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at [email protected] or toll free at 1-866-208-3676, 
or for TTY, (202) 502-8659. Although the Commission strongly encourages 
electronic filing, documents may also be paper-filed. To paper-file, 
mail an original and five copies to: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14593) in the docket number field to access 
the document. For assistance, contact FERC Online Support.