[Federal Register Volume 79, Number 154 (Monday, August 11, 2014)]
[Notices]
[Pages 46781-46782]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2014-18893]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RD14-11-000]
Proposed Agency Information Collection
AGENCY: Federal Energy Regulatory Commission, Energy.
ACTION: Notice and Request for Comments.
-----------------------------------------------------------------------
SUMMARY: The Federal Energy Regulatory Commission (Commission) invites
public comment in Docket No. RD14-11-000 on a proposed change to a
collection of information that the Commission is developing for
submission to the Office of Management and Budget (OMB) pursuant to the
Paperwork Reduction Act of 1995. Comments are invited on: (a) Whether
the proposed collection of information is necessary for the proper
performance of the functions of the agency, including whether the
information shall have practical utility; (b) the accuracy of the
agency's estimate of the burden of the proposed collection of
information, including the validity of the methodology and assumptions
used; (c) ways to enhance the quality, utility, and clarity of the
information to be collected; and (d) ways to minimize the burden of the
collection of information on respondents, including through the use of
automated collection techniques or other forms of information
technology.
DATES: Comments regarding this proposed information collection must be
received on or before October 10, 2014.
ADDRESSES: Comments, identified by docket number, may be filed in the
following ways:
Electronic Filing through http://www.ferc.gov. Documents
created electronically using word processing software should be filed
in native applications or print-to-PDF format and not in a scanned
format.
Mail/Hand Delivery: Those unable to file electronically
may mail or hand-deliver an original of their comments to: Federal
Energy Regulatory Commission, Secretary of the Commission, 888 First
Street NE., Washington, DC 20426.
[[Page 46782]]
FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at
[email protected], telephone at (202) 502-8663, and fax at (202)
273-0873.
SUPPLEMENTARY INFORMATION: The proposed information collection changes
in Docket No. RD14-11-000 relate to the proposed Reliability Standards
VAR-001-4 (Voltage and Reactive Control) and VAR-002-3 (Generator
Operation for Maintaining Network Voltage Schedules), developed by the
North American Electric Reliability Corporation (NERC), and submitted
to the Commission for approval. The Commission received NERC's petition
to approve the proposed Reliability Standards on June 9, 2014.
NERC summarizes the VAR group of standards as follows:
The Voltage and Reactive (``VAR'') group of Reliability
Standards, which consists of two continent-wide Reliability
Standards, VAR-001-3 and VAR-002-2b, is designed to maintain voltage
stability on the Bulk-Power System, protect transmission,
generation, distribution, and customer equipment, and support the
reliable operation of the Bulk-Power System.\1\
---------------------------------------------------------------------------
\1\ NERC Petition at 3.
In its petition, NERC also summarizes the proposed Reliability
---------------------------------------------------------------------------
Standards' applicability and requirements:
In general, proposed Reliability Standard VAR-001-4 sets forth
the requirements applicable to Transmission Operators for
scheduling, monitoring, and controlling Reactive Power resources in
the Real-time Operations, Same-day Operations, and Operational
Planning time horizons to regulate voltage and Reactive Power flows
for the reliable operation of the Bulk-Power System. Proposed
Reliability Standard VAR-002-3 sets forth the requirements
applicable to Generator Operators and Generator Owners for providing
the necessary reactive support and voltage control necessary to
maintain reliable operations. Generators are the largest and most
reliable Reactive Power resource and play an integral role in
maintaining voltage stability on the Bulk-Power System.
Collectively, the proposed Reliability Standards are designed to
prevent voltage instability and voltage collapse on the Bulk-Power
System.\2\
---------------------------------------------------------------------------
\2\ Id. at 4.
Finally, NERC also states that the proposed Reliability Standards
improve reliability, clarify requirement language and eliminate
redundant or unnecessary requirements.\3\
---------------------------------------------------------------------------
\3\ Id. at 15.
---------------------------------------------------------------------------
Burden Statement: Commission staff analyzed the proposed and
currently enforced standards and has concluded that while information
collection requirements have been deleted, added, and/or changed, the
overall paperwork burden and applicable respondent universe remains
unchanged. However, the Commission intends to submit a request for
approval to OMB under the Paperwork Reduction Act (PRA) related to the
proposed Reliability Standards because there are substantive changes to
information collection requirements. For PRA purposes, the information
collection requirements in proposed Reliability Standards VAR-001-4 and
VAR-002-3 are identified as FERC-725A and OMB Control Number 1902-0244.
Dated: July 31, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-18893 Filed 8-8-14; 8:45 am]