DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13563-003]
Juneau Hydropower, Inc.; Notice of Application Accepted for
Filing and Soliciting Motions To Intervene and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Major Original License.
b. Project No.: 13563-003.
c. Date filed: May 29, 2014.
d. Applicant: Juneau Hydropower, Inc.
e. Name of Project: Sweetheart Lake Hydroelectric Project.
f. Location: On Sweetheart Lake and Sweetheart Creek in the City
and Borough of Juneau, Alaska. The project will occupy about 2,058
acres of federal lands located in the Tongass National Forest
administered by the United States Forest Service.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Duff W. Mitchell, Business Manager, Juneau
Hydropower, Inc., P.O. Box 22775, Juneau, AK 99802; (907) 789-2775.
i. FERC Contact: John Matkowski at (202) 502-8576,
[email protected].
j. Deadline for filing motions to intervene and protests: 60 days
from the issuance date of this notice.
The Commission strongly encourages electronic filing. Please file
filing motions to intervene and protests using the Commission's eFiling
system at http://www.ferc.gov/docs-filing/efiling.asp. For assistance,
please contact FERC Online Support at [email protected], (866)
208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic
filing, please send a paper copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426. The
first page of any filing should include docket number P-13563-003.
The Commission's Rules of Practice and Procedures require all
intervenors filing documents with the Commission to serve a copy of
that document on each person on the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
k. This application has been accepted for filing, but is not ready
for environmental analysis at this time.
l. The proposed Sweetheart Lake Project would consist of: (1) The
existing Sweetheart Lake with a surface area of 1,702 acres and an
active storage capacity of 94,069 acre-feet at normal maximum water
elevation; (2) a 280-foot-long, 111-foot-high roller-compacted concrete
dam, (3) an intake structure with a fish screen; (4) a 9,621-foot-long,
15-foot-high, 15-foot-wide unlined power tunnel conveying flow from the
project intake to the penstock; (5) a 1,056-foot-long, 7- to 9-foot-
diameter penstock, the initial 896 feet of which is located in the
lower power tunnel; (6) a 160-foot-long, 60-foot-wide powerhouse
containing three 6.6-megawatt Francis generating units; (7) a 541-foot-
long tailrace that will flow into Sweetheart Creek; (8) a 25-foot-long,
5-foot-wide, 4-foot-deep salmon smolt re-entry pool located adjacent to
the powerhouse and tailrace; (9) a switchyard adjacent to the
powerhouse; (10) an 8.69-mile-long, 138-kilovolt (kV) transmission line
consisting of buried, submarine, and overhead segments; (11) a 2.8-
mile-long, 12.47-kV service line; (12) a 4,400-foot-long access road;
(13) marine access facilities including a dock, ramp, and landing site;
(14) a caretaker facility near the powerhouse; (15) a shelter facility
at the dam site; and (16) appurtenant facilities. The proposed
Sweetheart Lake Project would have an average annual generation of 116
gigawatt-hours.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at http://www.ferc.gov using the ``eLibrary''
link. Enter the docket
[[Page 46783]]
number excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support. A
copy is also available for inspection and reproduction at the address
in item h above.
You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Any qualified applicant desiring to file a competing application
must submit to the Commission, on or before the specified intervention
deadline date, a competing development application, or a notice of
intent to file such an application. Submission of a timely notice of
intent allows an interested person to file the competing development
application no later than 120 days after the specified intervention
deadline date. Applications for preliminary permits will not be
accepted in response to this notice.
A notice of intent must specify the exact name, business address,
and telephone number of the prospective applicant, and must include an
unequivocal statement of intent to submit a development application. A
notice of intent must be served on the applicant(s) named in this
public notice.
Anyone may submit a protest or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210, 385.211, and 385.214. In determining the appropriate action to
take, the Commission will consider all protests filed, but only those
who file a motion to intervene in accordance with the Commission's
Rules may become a party to the proceeding. Any protests or motions to
intervene must be received on or before the specified deadline date for
the particular application.
When the application is ready for environmental analysis, the
Commission will issue a public notice requesting comments,
recommendations, terms and conditions, or prescriptions.
All filings must (1) bear in all capital letters the title
``PROTEST'' or ``MOTION TO INTERVENE,'' ``NOTICE OF INTENT TO FILE
COMPETING APPLICATION,'' or ``COMPETING APPLICATION;'' (2) set forth in
the heading the name of the applicant and the project number of the
application to which the filing responds; (3) furnish the name,
address, and telephone number of the person protesting or intervening;
and (4) otherwise comply with the requirements of 18 CFR 385.2001
through 385.2005. Agencies may obtain copies of the application
directly from the applicant. A copy of any protest or motion to
intervene must be served upon each representative of the applicant
specified in the particular application.
Dated: July 31, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-18892 Filed 8-8-14; 8:45 am]