DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14594-000]
Howard A. Hanson Power, LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On March 3, 2014, Howard A. Hanson Power, LLC, filed an application
for a preliminary permit, pursuant to section 4(f) of the Federal Power
Act (FPA), proposing to study the feasibility of the Howard A. Hanson
Hydroelectric Project (Hanson Project or project) to be located on
Howard A. Hanson reservoir near Enumclaw in King County, Washington.
The sole purpose of a preliminary permit, if issued, is to grant the
permit holder priority to file a license application during the permit
term. A preliminary permit does not authorize the permit holder to
perform any land-disturbing activities or otherwise enter upon lands or
waters owned by others without the owners' express permission.
The proposed project would consist of the following: (1) An
existing earth and rockfill dam on the Howard A. Hanson reservoir
having a total storage capacity of 136,700 acre-feet at a normal
maximum operating elevation of 1,141 feet mean sea level; (2) four 150
to 300-foot-long, 48-inch-diameter steel penstocks each housing an
inline turbine/generation unit for a total capacity of 5 megawatts; (3)
an overhead or buried 1-mile-long, 15-kilovolt transmission line
extending from the project to an existing local utility's line (the
point of interconnection); and (4) appurtenant facilities. The
estimated annual generation of the Hanson Project would be 26 gigawatt-
hours.
Applicant Contact: Mr. Magn[uacute]s J[oacute]hannesson, Howard A.
Hanson Power, LLC, 46 Peninsula Center, Ste. E, Rolling Hills Estates,
CA 90274, phone 310-699-6400, email [email protected].
FERC Contact: Ryan Hansen, phone: (202) 502-8074, email
[email protected].
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent,
[[Page 29184]]
and competing applications using the Commission's eFiling system at
http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at [email protected], (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426. The first page of any filing should
include docket number P-14594-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14594) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: May 14, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-11712 Filed 5-20-14; 8:45 am]