[Federal Register Volume 79, Number 92 (Tuesday, May 13, 2014)]
[Notices]
[Page 27297]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2014-10881]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14586-000]
James R. Robertson, PE; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On February 10, 2014, James R. Robertson, PE, filed an application
for a preliminary permit, pursuant to section 4(f) of the Federal Power
Act (FPA), proposing to study the feasibility of hydropower at the U.S.
Army Corps of Engineers' (Corps) Sutton Dam, on the Elk River, in
Sutton, Braxton County, West Virginia. The sole purpose of a
preliminary permit, if issued, is to grant the permit holder priority
to file a license application during the permit term. A preliminary
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by
others without the owners' express permission.
The proposed Sutton Hydroelectric Power Project would consist of
the following: (1) A new 80-foot-long by 40-foot-wide powerhouse
containing three generating units with a total installed capacity of
9.2 megawatts; (2) a new multiple-port intake structure to be located
at the upstream face of the Sutton dam; (3) a new 12-foot-diameter,
300-foot-long steel penstock; (4) a new 70-foot-long by 30-foot-wide
switchyard; (5) a new 138-kilovolt, 4,000-foot-long transmission line;
and (6) appurtenant facilities. The estimated annual generation of the
proposed project would be 36 gigawatt-hours.
Applicant Contact: James R. Robertson, PE, 5702 Reno Court,
Boonsboro, MD 21713; phone: (240) 405-5667.
FERC Contact: Monir Chowdhury; phone: (202) 502-6736.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters,
without prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and
contact information at the end of your comments. For assistance, please
contact FERC Online Support at [email protected], (866) 208-
3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic
filing, please send a paper copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426. The
first page of any filing should include docket number P-14586-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14586) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: May 6, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-10881 Filed 5-12-14; 8:45 am]
BILLING CODE 6717-01-P