[Federal Register Volume 79, Number 88 (Wednesday, May 7, 2014)]
[Rules and Regulations]
[Pages 26143-26150]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2014-10347]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52
[EPA-R04-OAR-2012-0814; FRL-9910-42-Region 4]
Approval and Promulgation of Implementation Plans; Region 4
States; Visibility Protection Infrastructure Requirements for the 1997
and 2006 Fine Particulate Matter National Ambient Air Quality Standards
AGENCY: Environmental Protection Agency.
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: The Environmental Protection Agency (EPA) is taking final
action to approve submissions from Alabama, Georgia, Kentucky,
Mississippi, North Carolina, South Carolina, and Tennessee for
inclusion into each state's respective state implementation plan (SIP).
This action pertains to Clean Air Act (CAA or Act) requirements
regarding the protection of visibility in another state for the 1997
annual and 2006 24-hour fine particulate matter (PM2.5)
National Ambient Air Quality Standards (NAAQS). The CAA requires that
each state adopt and submit a SIP for the implementation, maintenance,
and enforcement of each NAAQS promulgated by EPA. These plans are
commonly referred to as ``infrastructure'' SIPs. Specifically, EPA is
taking final action to approve the submissions for Alabama, Georgia,
Kentucky, Mississippi, North Carolina, South Carolina, and Tennessee as
they relate to the 1997 annual and 2006 24-hour PM2.5 NAAQS
infrastructure SIP requirements to protect visibility in other states.
All other applicable infrastructure requirements for these NAAQS
associated with these seven states have been addressed in separate
rulemakings.
DATES: This rule will be effective June 6, 2014.
ADDRESSES: EPA has established a docket for this action under Docket
Identification No. EPA-R04-OAR-2012-0814. All documents in the docket
are listed on the www.regulations.gov Web site. Although listed in the
index, some information is not publicly available, i.e., Confidential
Business Information or other information whose disclosure is
restricted by statute. Certain other material, such as copyrighted
material, is not placed on the Internet and will be publicly available
only in hard copy form. Publicly available docket materials are
available either electronically through
[[Page 26144]]
www.regulations.gov or in hard copy at the Regulatory Development
Section, Air Planning Branch, Air, Pesticides and Toxics Management
Division, U.S. Environmental Protection Agency, Region 4, 61 Forsyth
Street SW., Atlanta, Georgia 30303-8960. EPA requests that if at all
possible, you contact the person listed in the FOR FURTHER INFORMATION
CONTACT section to schedule your inspection. The Regional Office's
official hours of business are Monday through Friday, 8:30 to 4:30
excluding federal holidays.
FOR FURTHER INFORMATION CONTACT: Sean Lakeman, Regulatory Development
Section, Air Planning Branch, Air, Pesticides and Toxics Management
Division, U.S. Environmental Protection Agency, Region 4, 61 Forsyth
Street SW., Atlanta, Georgia 30303-8960. The telephone number is (404)
562-9043. Mr. Lakeman can be reached via electronic mail at
[email protected].
SUPPLEMENTARY INFORMATION:
I. Background
Upon promulgation of a new or revised NAAQS, sections 110(a)(1) and
(2) of the CAA require states to address basic SIP requirements,
including emissions inventories, monitoring, and modeling to assure
attainment and maintenance for that new NAAQS. On July 18, 1997 (62 FR
36852), EPA promulgated a new annual PM2.5 NAAQS and on
October 17, 2006 (71 FR 61144), EPA promulgated a new 24-hour NAAQS. On
February 20, 2013, EPA proposed to approve SIP submissions from
Alabama, Georgia, Kentucky, Mississippi, North Carolina, South
Carolina, and Tennessee as they relate to section 110(a)(2)(D)(i)(II)
infrastructure SIP requirements to protect visibility in other states
for both the 1997 and 2006 PM2.5 NAAQS. A summary of the
background for today's final action is provided below. See EPA's
February 20, 2013, proposed rulemaking at 78 FR 11805 for more detail.
Section 110(a)(2)(D) has two components: 110(a)(2)(D)(i) and
110(a)(2)(D)(ii). Section 110(a)(2)(D)(i) includes four distinct
components, commonly referred to as ``prongs,'' that must be addressed
in infrastructure SIP submissions. The first two prongs, which are
codified in section 110(a)(2)(D)(i)(I), are provisions that prohibit
any source or other type of emissions activity in one state from
contributing significantly to nonattainment of the NAAQS in another
state (prong 1) and interfering with maintenance of the NAAQS in
another state (prong 2). The third and fourth prongs, which are
codified in section 110(a)(2)(D)(i)(II), are provisions that prohibit
emissions activity in one state interfering with measures required to
prevent significant deterioration of air quality in another state
(prong 3), and to protect visibility in another state (prong 4).
Section 110(a)(2)(D)(ii) requires SIPs to include provisions insuring
compliance with sections 115 and 126 of the Act, relating to interstate
and international pollution abatement.
EPA has previously taken action to address SIP submissions from
Alabama, Georgia, Kentucky, Mississippi, North Carolina, South
Carolina, and Tennessee related to prongs 1 through 3 of section
110(a)(2)(D)(i) and the requirements of section 110(a)(2)(D)(ii) for
the 1997 annual and 2006 24-hour PM2.5 NAAQS. Today's final
rulemaking relates only to prong 4 of section 110(a)(2)(D)(i)(II),
which as previously described, requires that infrastructure SIPs
contain adequate provisions to protect visibility in other states.
II. Response to Comments
EPA received three sets of comments on the February 20, 2013
proposed rulemaking to approve the SIP submissions from Alabama,
Georgia, Kentucky, Mississippi, North Carolina, South Carolina, and
Tennessee addressing prong 4 of section 110(a)(2)(D)(i)(II). Two of the
commenters, the Municipal Electric Authority of Georgia and the Utility
Air Regulatory Group, support EPA's proposed action and one commenter,
the National Parks Conservation Association (the ``Commenter''),
opposes the proposed action. A summary of the adverse comments and
EPA's responses are provided below.
Comment 1: The Commenter states that EPA must disapprove the
infrastructure SIP submissions from Alabama, Georgia, Kentucky,
Mississippi, North Carolina, South Carolina, and Tennessee as they
relate to prong 4 of section 110(a)(2)(D)(i) because the submittals
rely on the Clean Air Interstate Rule (CAIR) to satisfy best available
retrofit technology (BART) and reasonable progress requirements for
CAIR-subject electric generating units (EGUs). According to the
Commenter, EPA must direct each state to develop a plan consistent with
the requirements of the Regional Haze Rule for source-specific BART and
reasonable progress for nitrogen oxide (NOX) and sulfur
dioxide (SO2) emissions from EGUs subject to these regional
haze provisions. The Commenter contends that reliance on CAIR is
improper because CAIR was ``declared illegal'' and remanded by the U.S.
Court of Appeals for the District of Columbia Circuit (DC Circuit) in
North Carolina v. EPA, 550 F.3d 1176 (D.C. Cir. 2008) and is therefore
not permanent and enforceable. The Commenter further contends that CAIR
cannot substitute for BART because it is impermissible under section
169A of the CAA for EPA or the states to rely on a cap-and-trade
program as a substitute for, or exemption from, BART and because EPA's
better-than-BART provision in the Regional Haze Rule violates the CAA.
The Commenter also believes that Alabama, Georgia, Kentucky, North
Carolina, and South Carolina improperly relied on CAIR to ``exempt''
sources from a reasonable progress review and that, ``[i]n most cases,
the states did not perform a unit-specific reasonable progress
analysis, but more generally asserted that reliance on CAIR was
sufficient for reasonable progress.'' The Commenter believes that in
the absence of such an analysis, ``it is not possible to determine
whether or the extent to which CAIR may fulfill RP requirements,
assuming that it could overcome the impossible hurdle of being an
unenforceable program.'' The Commenter is concerned that the reliance
on CAIR to ``remove emission reduction obligations from many sources of
SO2'' and the ``methodical elimination of sources of
NOX and PM emissions'' through the states' area of influence
methodology ``may have prevented the achievement of meaningful
reasonable progress.'' The Commenter also believes that ``it is
incumbent upon the states and EPA to demonstrate in their SIPs that
they have actually taken all measures necessary to reduce their share
of pollutants'' to meet reasonable progress goals in neighboring
states' Class I areas, citing language in 40 CFR 51.308(d)(3)(ii).
Response 1: EPA disagrees with the Commenter. As discussed in EPA's
proposed rulemaking related to today's action, the DC Circuit vacated
the Cross-State Air Pollution Rule (CSAPR) in EME Homer City Generation
v. EPA, 696 F.3d 7, 38 (D.C. Cir. 2012) and ordered EPA to ``continue
administering CAIR pending the promulgation of a valid replacement.''
The Agency believes that it is therefore appropriate for EPA to rely on
CAIR emission reductions for purposes of assessing the adequacy of the
infrastructure SIPs subject to this action with respect to prong 4 of
section 110(a)(2)(D)(i)(II) while a valid replacement rule is developed
and until submissions complying with any such new rule are submitted by
the states and acted upon by EPA or until EME Homer
[[Page 26145]]
City is resolved in a way that provides different direction regarding
CAIR and CSAPR.
Furthermore, CAIR remains part of the federally-approved SIPs for
Alabama, Georgia, Kentucky, Mississippi, North Carolina, South
Carolina, and Tennessee and can be considered in determining whether
each of the infrastructure SIPs subject to today's action meets the
requirements of prong 4. EPA is taking final action to approve these
infrastructure SIP submissions with respect to prong 4 because the EPA-
approved regional haze SIP for each state, in combination with each
state's implementation plan provisions to implement CAIR, adequately
prevent sources in each state from interfering with measures adopted by
other states to protect visibility during the first planning period.\1\
EPA notes that all of the rulemakings and proposed rulemakings cited by
the Commenter that discuss the limited approvability of SIPs due to the
status of CAIR were issued by EPA prior to the vacatur of CSAPR. Since
the vacatur of CSAPR in August 2012 and with continued implementation
of CAIR per the direction of the DC Circuit in EME Homer City, EPA has
approved redesignations of areas to attainment of the 1997 and 2006
PM2.5 NAAQS in which states have relied on CAIR as a
permanent and enforceable measure.\2\
---------------------------------------------------------------------------
\1\ Under CAA sections 301(a) and 110(k)(6) and EPA's long-
standing guidance, a limited approval results in approval of the
entire SIP submittal, even those parts that are deficient and
prevent EPA from granting a full approval of the SIP revision.
Processing of State Implementation Plan (SIP) Revisions, EPA
Memorandum from John Calcagni, Director, Air Quality Management
Division, OAQPS, to Air Division Directors, EPA Regional Offices I-
X, September 7, 1992, (1992 Calcagni Memorandum) located at http://www.epa.gov/ttn/caaa/t1/memoranda/siproc.pdf. Therefore, EPA
believes it is appropriate to approve the infrastructure SIPs
subject to today's action as they relate to prong 4 despite the
limited approval granted to the relevant regional haze SIPs.
The SIP provisions implementing CAIR for each of the states
subject to this action are identified in the following sections of
40 CFR Part 52: 52.50(c) (Alabama); 52.570(c) (Georgia); 52.920(c)
(Kentucky); 52.1270(c) (Mississippi); 52.1770(c) (North Carolina);
52.2120(c) (South Carolina); and 52.2220(c) (Tennessee).
\2\ See 77 FR 76415 (Dec. 28, 2012) (redesignation of
Huntingdon-Ashland, West Virginia for the 1997 PM2.5
NAAQS); 78 FR 59841 (Sept. 30, 2013) (redesignation of Wheeling,
West Virginia for the 1997 PM2.5 NAAQS); 78 FR 56168
(Sept. 12, 2013) (redesignation of Parkersburg, West Virginia for
the 1997 PM2.5 NAAQS); 78 FR 5306 (Jan. 25, 2013)
(redesignation of Birmingham, Alabama for the 2006 PM2.5
NAAQS).
---------------------------------------------------------------------------
EPA disagrees with the Commenter that the CAA does not allow states
to rely on an alternative program such as CAIR in lieu of source-
specific BART. EPA's regulations allow states to adopt alternatives to
BART that provide for greater reasonable progress, and EPA's
determination that states may rely on CAIR to meet the BART
requirements has been upheld by the DC Circuit as meeting the
requirements of the CAA. In the first case challenging the provisions
in the Regional Haze Rule allowing for states to adopt alternative
programs in lieu of BART, Center for Energy and Economic Development v.
EPA, 398 F.3d 653, 660 (D.C. Cir. 2005), the court affirmed the
Agency's interpretation of section 169A(b)(2) as allowing for
alternatives to BART where those alternatives will result in greater
reasonable progress than BART. In the second case, Utility Air
Regulatory Group v. EPA, 471 F.3d 1333 (D.C. Cir. 2006), the court
specifically upheld EPA's determination that states could rely on CAIR
as an alternative to BART for EGUs in the CAIR-affected states. The
court concluded that the EPA's two-pronged test for determining whether
an alternative program achieves greater reasonable progress was a
reasonable one and also agreed with EPA that nothing in the CAA
required the EPA to ``impose a separate technology mandate for sources
whose emissions affect Class I areas, rather than piggy-backing on
solutions devised under other statutory categories, where such
solutions meet the statutory requirements.'' \3\
---------------------------------------------------------------------------
\3\ Utility Air Regulatory Group, 471 F.3d at 1340.
---------------------------------------------------------------------------
More fundamentally, EPA disagrees with the Commenter that the
adequacy of the BART measures in the regional haze SIPs for these
states is relevant to the question of whether each state's
implementation plan meets the requirements of section 110(a)(2)(D)(i)
of the CAA with respect to visibility. EPA interprets the visibility
provisions in this section of the CAA as requiring states to include in
their SIPs measures to prohibit emissions that would interfere with the
reasonable progress goals set to protect Class I areas in other states.
The Regional Haze Rule includes a similar requirement in 40 CFR
51.308(d)(3), and for each of the states subject to this action, EPA
found that the respective regional haze SIP meets this requirement.\4\
Each of these states relied on CAIR to achieve significant reductions
in emissions to both meet the BART requirements and to address impacts
of the state on Class I areas in other states.\5\ The question of
whether or not CAIR satisfies the BART requirements has no bearing on
whether these measures meet the requirements of prong 4.
---------------------------------------------------------------------------
\4\ See Alabama: 77 FR 11937, 11947-48, 11955-56 (Feb. 28, 2012)
(proposed), 77 FR 38515 (June 28, 2012) (final); Georgia: 77 FR
11452, 11463, 11474-75 (Feb. 27, 2012) (proposed), 77 FR 38501 (June
28, 2012) (final); Kentucky: 76 FR 78194, 78205-06, 78213 (Dec. 16,
2011) (proposed), 77 FR 19098 (Mar. 30, 2012) (final); Mississippi:
77 FR 11879, 11888, 11892 (Feb. 28, 2012) (proposed), 77 FR 38191
(June 27, 2012) (final); North Carolina: 77 FR 11858, 11869, 11877
(Feb. 28, 2012) (proposed), 77 FR 38185 (June 27, 2012) (final);
South Carolina: 77 FR 11894, 11904, 11911-12 (Feb. 28, 2012)
(proposed), 77 FR 38509 (June 28, 2012) (final); Tennessee: 76 FR
33662, 33673, 33683-84 (June 9, 2011) (proposed), 77 FR 24392 (Apr.
24, 2012) (final).
\5\ See, e.g., 77 FR 11949, 11951, 11956.
---------------------------------------------------------------------------
Regarding the reasonable progress evaluations, each state at issue
focused its reasonable progress analysis on SO2 emissions
based on the conclusion that sulfate particles account for the greatest
portion of the regional haze affecting Class I areas in these
states.\6\ Each state then established areas of influence and
contribution thresholds to determine which of its sources should be
evaluated for reasonable progress control.\7\ EPA approved each state's
methodology for identifying units for reasonable progress evaluation
and each state's reasonable progress determinations in the respective
regional haze SIP actions and provided a detailed discussion of the
methodology and the rationale for approval in the Federal Register
notices associated with those actions.\8\
---------------------------------------------------------------------------
\6\ This conclusion was reached by the Visibility Improvement
State and Tribal Association of the Southeast (VISTAS) regional
planning organization and adopted by each of the VISTAS states in
their respective regional haze SIP submissions. VISTAS member states
include: Alabama, Florida, Georgia, Kentucky, Mississippi, North
Carolina, South Carolina, Tennessee, Virginia, and West Virginia.
VISTAS determined that ammonium sulfate accounted for 69 to 87
percent of the calculated light extinction at the 18 Class I areas
within the region. See, e.g., 77 FR 11946.
In evaluating reasonable progress, states may identify and focus
on key pollutants that contribute to visibility impairment. EPA,
Guidance for Setting Reasonable Progress Goals Under the Regional
Haze Program at 3-1 (June 1, 2007) [hereinafter ``Reasonable
Progress Guidance''].
\7\ See, e.g., 77 FR 11947-48.
\8\ See, e.g., id. at 11946-49.
---------------------------------------------------------------------------
Contrary to the Commenter's assertions, Alabama, Georgia, Kentucky,
North Carolina, and South Carolina did not ``exempt [CAIR] sources . .
. that would otherwise be subject to reasonable progress review.'' Each
of these states considered the four statutory reasonable progress
factors in evaluating whether CAIR would satisfy reasonable progress
requirements for the state's EGU sector and determined that no
additional controls beyond CAIR were reasonable for SO2
during the first planning period.\9\ As discussed in EPA's
[[Page 26146]]
Reasonable Progress Guidance, states may evaluate the need for
reasonable progress controls on a source category basis, rather than
through a unit-specific analysis, and have wide latitude to determine
additional control requirements for ensuring reasonable progress.\10\
The guidance also notes that states may consider emissions reductions
from cap-and-trade programs such as CAIR in addition to source-specific
controls.\11\
---------------------------------------------------------------------------
\9\ 77 FR 11949; 77 FR 11464-69; 76 FR 78206-07; 77 FR 11872; 77
FR 11906-07. Georgia concluded that additional controls were not
required on CAIR-subject EGUs that significantly contributed to
visibility impairment at Class I areas that are clearly projected to
meet or exceed the Uniform Rate of Progress (URP) in 2018 because of
CAIR emissions reductions and the emissions reductions associated
with Georgia state rule 391-3-1-.02(13) (capping SO2
emissions from Georgia EGUs in 2015 at 30 percent of 2002 actual
emissions). Georgia evaluated reasonable progress controls for EGUs
that significantly contributed to visibility impairment at Class I
areas not meeting the URP. 77 FR 11469.
\10\ Reasonable Progress Guidance at 4-2.
\11\ Id.
---------------------------------------------------------------------------
As mentioned above, EPA determined that each of the regional haze
SIPs submitted by the states subject to this action adequately prevents
sources in the state from interfering with the reasonable progress
goals adopted by other states to protect visibility during the first
planning period, thus satisfying the requirements of 40 CFR
51.308(d)(3). These states participated in a regional planning process
through VISTAS, and their SIPs include all measures needed to achieve
their respective apportionment of emissions reduction obligations
agreed upon through that process as required by 40 CFR
51.308(d)(3)(ii).\12\
---------------------------------------------------------------------------
\12\ See, e.g., 77 FR 38193.
---------------------------------------------------------------------------
Comment 2: EPA must disapprove the infrastructure SIP submittals
from North Carolina and South Carolina under prong 4 of 110(a)(2)(D)(i)
because EPA has not approved the State's five-year progress reports.
Response 2: EPA disagrees with the Commenter. EPA received the
North Carolina and South Carolina progress report SIP submittals on May
31, 2013, and December 28, 2012, respectively. As of this final
rulemaking, EPA has not taken final action on these submissions, and no
such action is due pursuant to CAA section 110(k)(2) at this time.
Therefore, EPA does not believe that EPA approval of these progress
reports is a required structural element necessary before EPA may
approve the North Carolina and South Carolina infrastructure SIPs
subject to this action.
Nevertheless, EPA notes that it has proposed approval of South
Carolina's progress report SIP submission since the publication of the
proposed infrastructure action that is the subject of this
rulemaking.\13\ As discussed in the proposed rulemaking on the progress
report, South Carolina provided SO2 emissions data from
EPA's Clean Air Markets Division (CAMD) for EGUs in South Carolina and
in the entire VISTAS region from 2002-2011.\14\ This data indicates
that emissions of SO2, the primary contributor to visibility
impairment in the VISTAS region, have declined significantly since
South Carolina submitted its regional haze SIP in 2007.\15\ South
Carolina's progress report also states that total SO2
emissions from South Carolina EGUs are already below the 2018
projections in South Carolina's 2007 regional haze SIP submittal and
are expected to decrease further.\16\ In addition, the most current
visibility data available at the time of EPA's proposed approval of the
progress report shows that visibility has improved at the Cape Romain
Wilderness Area, the Class I area within South Carolina.\17\ For these
reasons, EPA has proposed to approve South Carolina's negative
declaration pursuant to 40 CFR 51.308(h) that no further substantive
revision of the State's regional haze SIP is required at this time to
achieve the reasonable progress goals for Class I areas affected by the
State's sources and continues to believe that the State's existing SIP
(including the regional haze SIP and CAIR) contains adequate provisions
to meet the visibility protection requirements of section
110(a)(2)(D)(i)(II).\18\
---------------------------------------------------------------------------
\13\ 79 FR 3147 (Jan. 17, 2014).
\14\ Id. at 3150.
\15\ Id.
\16\ Id. at 3151.
\17\ Id. at 3152.
\18\ 79 FR at 3152.
---------------------------------------------------------------------------
Although EPA has not yet proposed action on North Carolina's
progress report SIP, the Agency has performed a preliminary review of
the submission. North Carolina included 2011 SO2 emissions
data from CAMD for EGUs in North Carolina that are expected to be
retired by 2015 and for EGUs that were projected in the 2007 regional
haze SIP submission to have controls installed by 2018.\19\ Based on
this data, North Carolina reported a reduction in SO2
emissions of approximately 390,000 tons per year from these units
between 2002-2011 and estimated that 2018 SO2 emissions
would be approximately 80 percent lower than those projected in the
regional haze SIP.\20\ North Carolina also provided visibility data
supporting its conclusion that visibility has improved since the 2000-
2004 baseline at all five of the Class I areas in the State.\21\ Based
on EPA's preliminary review of this information and other information
provided in the State's progress report SIP submission, EPA continues
to believe, at this time, that the State's existing SIP (including the
regional haze SIP and CAIR) contains adequate provisions to meet the
visibility protection requirements of section 110(a)(2)(D)(i)(II).
---------------------------------------------------------------------------
\19\ Regional Haze 5-Year Periodic Review State Implementation
Plan for North Carolina Class I Areas (May 31, 2013) at 32-36.
\20\ Id. at 32.
\21\ Id. at 42-44.
---------------------------------------------------------------------------
III. This Action
EPA is taking final action to approve the infrastructure SIP
submissions from Alabama, Georgia, Kentucky, Mississippi, North
Carolina, South Carolina, and Tennessee as demonstrating that these
states meet the applicable requirements of section 110(a)(2)(D)(i) of
the CAA that relate to the protection of visibility in other states for
the 1997 annual and 2006 24-hour PM2.5 NAAQS. In describing
how its submission meets this requirement, Alabama, Georgia, Kentucky,
Mississippi, North Carolina, South Carolina, and Tennessee each
referred to EPA-approved state provisions requiring EGUs to comply with
the CAIR and to the limited approval and limited disapproval of its
regional haze SIP. Although EPA has not fully approved the regional
haze SIPs from these states, the Agency believes that the
infrastructure SIP submission together with previously approved SIP
provisions, specifically those provisions that require EGUs to comply
with CAIR and the additional measures in the regional haze SIP
addressing BART and reasonable progress requirements for other sources
or pollutants, are adequate to demonstrate compliance with prong 4.
IV. Final Action
As described above, EPA is approving SIP submissions from Alabama,
Georgia, Kentucky, Mississippi, North Carolina, South Carolina, and
Tennessee to incorporate provisions into the states' implementation
plans to address prong 4 of section 110(a)(2)(D)(i) of the CAA for both
the 1997 and 2006 PM2.5 NAAQS because these submissions are
consistent with section 110 of the CAA.
V. Statutory and Executive Order Reviews
Under the CAA, the Administrator is required to approve a SIP
submission that complies with the provisions of the Act and applicable
federal regulations. See 42 U.S.C. 7410(k); 40 CFR 52.02(a). Thus, in
reviewing SIP submissions, EPA's role is to approve state choices,
provided that they meet the criteria of the CAA. Accordingly, this
final action merely approves state law as meeting federal requirements
and does not
[[Page 26147]]
impose additional requirements beyond those imposed by state law. For
that reason, this action:
Is not a ``significant regulatory action'' subject to
review by the Office of Management and Budget under Executive Order
12866 (58 FR 51735, October 4, 1993);
does not impose an information collection burden under the
provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);
is certified as not having a significant economic impact
on a substantial number of small entities under the Regulatory
Flexibility Act (5 U.S.C. 601 et seq.);
does not contain any unfunded mandate or significantly or
uniquely affect small governments, as described in the Unfunded
Mandates Reform Act of 1995 (Pub. L. 104-4);
does not have Federalism implications as specified in
Executive Order 13132 (64 FR 43255, August 10, 1999);
is not an economically significant regulatory action based
on health or safety risks subject to Executive Order 13045 (62 FR
19885, April 23, 1997);
is not a significant regulatory action subject to
Executive Order 13211 (66 FR 28355, May 22, 2001);
is not subject to requirements of Section 12(d) of the
National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272
note) because application of those requirements would be inconsistent
with the CAA; and
does not provide EPA with the discretionary authority to
address, as appropriate, disproportionate human health or environmental
effects, using practicable and legally permissible methods, under
Executive Order 12898 (59 FR 7629, February 16, 1994).
EPA has determined that this final rule does not have tribal
implications as specified by Executive Order 13175 (65 FR 67249,
November 9, 2000), because there are no ``substantial direct effects''
on an Indian Tribe as a result of this action. EPA notes that the
Catawba Indian Nation Reservation is located within South Carolina.
Pursuant to the Catawba Indian Claims Settlement Act, S.C. Code Ann.
27-16-120, ``all state and local environmental laws and regulations
apply to the Catawba Indian Nation and Reservation and are fully
enforceable by all relevant state and local agencies and authorities.''
Thus, while the South Carolina SIP applies to the Catawba Reservation,
because today's action is not a substantive revision to the South
Carolina SIP, and is instead approving South Carolina's infrastructure
SIP submission to incorporate provisions satisfying prong 4 of section
110(a)(2)(D)(i), EPA has determined that today's action will have no
``substantial direct effects'' on the Catawba Indian Nation. EPA has
also determined that these revisions will not impose any substantial
direct costs on tribal governments or preempt tribal law.
The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the
Small Business Regulatory Enforcement Fairness Act of 1996, generally
provides that before a rule may take effect, the agency promulgating
the rule must submit a rule report, which includes a copy of the rule,
to each House of the Congress and to the Comptroller General of the
United States. EPA will submit a report containing this action and
other required information to the U.S. Senate, the U.S. House of
Representatives, and the Comptroller General of the United States prior
to publication of the rule in the Federal Register. A major rule cannot
take effect until 60 days after it is published in the Federal
Register. This action is not a ``major rule'' as defined by 5 U.S.C.
804(2).
Under section 307(b)(1) of the CAA, petitions for judicial review
of this action must be filed in the United States Court of Appeals for
the appropriate circuit by July 7, 2014. Filing a petition for
reconsideration by the Administrator of this final rule does not affect
the finality of this action for the purposes of judicial review nor
does it extend the time within which a petition for judicial review may
be filed, and shall not postpone the effectiveness of such rule or
action. This action may not be challenged later in proceedings to
enforce its requirements. See section 307(b)(2).
List of Subjects in 40 CFR Part 52
Environmental protection, Air pollution control, Incorporation by
reference, Intergovernmental relations, Nitrogen dioxide, Particulate
matter, Reporting and recordkeeping requirements, Volatile organic
compounds.
Dated: April 18, 2014.
A. Stanley Meiburg,
Acting Regional Administrator, Region 4.
40 CFR part 52 is amended as follows:
PART 52--APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS
0
1. The authority citation for part 52 continues to read as follows:
Authority: 42 U.S.C. 7401 et seq.
Subpart B--Alabama
0
2. Section 52.50(e) is amended by adding two new entries for
``110(a)(1) and (2) Infrastructure Requirements for 1997 Fine
Particulate Matter National Ambient Air Quality Standards'' and
``110(a)(1) and (2) Infrastructure Requirements for 2006 Fine
Particulate Matter National Ambient Air Quality Standards'' at the end
of the table to read as follows:
Sec. 52.50 Identification of plan.
* * * * *
(e) * * *
EPA-Approved Alabama Non-Regulatory Provisions
----------------------------------------------------------------------------------------------------------------
State
Applicable submittal
Name of nonregulatory SIP geographic or date/ EPA Approval date Explanation
provision nonattainment area effective
date
----------------------------------------------------------------------------------------------------------------
* * * * * * *
110(a)(1) and (2) Infrastructure Alabama............. 7/25/2008 5/7/2014 [Insert Addressing prong 4
Requirements for 1997 Fine citation of of section
Particulate Matter National publication]. 110(a)(2)(D)(i)
Ambient Air Quality Standards. only.
110(a)(1) and (2) Infrastructure Alabama............. 9/23/2009 5/7/2014 [Insert Addressing prong 4
Requirements for 2006 Fine citation of of section
Particulate Matter National publication]. 110(a)(2)(D)(i)
Ambient Air Quality Standards. only.
----------------------------------------------------------------------------------------------------------------
[[Page 26148]]
Subpart L--Georgia
0
3. Section 52.570(e) is amended by adding two new entries for
``110(a)(1) and (2) Infrastructure Requirements for 1997 Fine
Particulate Matter National Ambient Air Quality Standards'' and
``110(a)(1) and (2) Infrastructure Requirements for 2006 Fine
Particulate Matter National Ambient Air Quality Standards'' at the end
of the table to read as follows:
Sec. 52.570 Identification of plan.
* * * * *
(e) * * *
EPA-Approved Georgia Non-Regulatory Provisions
----------------------------------------------------------------------------------------------------------------
State
Applicable submittal
Name of nonregulatory SIP geographic or date/ EPA Approval date Explanation
provision nonattainment area effective
date
----------------------------------------------------------------------------------------------------------------
* * * * * * *
110(a)(1) and (2) Infrastructure Georgia............. 7/23/2008 5/7/2014 [Insert Addressing prong 4
Requirements for 1997 Fine citation of of section
Particulate Matter National publication]. 110(a)(2)(D)(i)
Ambient Air Quality Standards. only.
110(a)(1) and (2) Infrastructure Georgia............. 10/21/2009 5/7/2014 [Insert Addressing prong 4
Requirements for 2006 Fine citation of of section
Particulate Matter National publication]. 110(a)(2)(D)(i)
Ambient Air Quality Standards. only.
----------------------------------------------------------------------------------------------------------------
Subpart S--Kentucky
0
4. Section 52.920(e) is amended by adding two new entries for
``110(a)(1) and (2) Infrastructure Requirements for 1997 Fine
Particulate Matter National Ambient Air Quality Standards'' and
``110(a)(1) and (2) Infrastructure Requirements for 2006 Fine
Particulate Matter National Ambient Air Quality Standards.'' at the end
of the table to read as follows:
Sec. 52.920 Identification of plan.
* * * * *
(e) * * *
EPA-Approved Kentucky Non-Regulatory Provisions
----------------------------------------------------------------------------------------------------------------
State
Applicable submittal
Name of nonregulatory SIP geographic or date/ EPA Approval date Explanations
provision nonattainment area effective
date
----------------------------------------------------------------------------------------------------------------
* * * * * * *
110(a)(1) and (2) Infrastructure Kentucky............ 8/26/2008 5/7/2014 [Insert Addressing prong 4
Requirements for 1997 Fine citation of of section
Particulate Matter National publication]. 110(a)(2)(D)(i)
Ambient Air Quality Standards. only.
110(a)(1) and (2) Infrastructure Kentucky............ 7/17/2012 5/7/2014 [Insert Addressing prong 4
Requirements for 2006 Fine citation of of section
Particulate Matter National publication]. 110(a)(2)(D)(i)
Ambient Air Quality Standards. only.
----------------------------------------------------------------------------------------------------------------
Subpart Z--Mississippi
0
5. Section 52.1270(e) is amended by adding two new entries for
``110(a)(1) and (2) Infrastructure Requirements for 1997 Fine
Particulate Matter National Ambient Air Quality Standards'' and
``110(a)(1) and (2) Infrastructure Requirements for 2006 Fine
Particulate Matter National Ambient Air Quality Standards'' at the end
of the table to read as follows:
Sec. 52.1270 Identification of plan.
* * * * *
(e) * * *
EPA-Approved Mississippi Non-Regulatory Provisions
----------------------------------------------------------------------------------------------------------------
State
Applicable submittal
Name of nonregulatory SIP geographic or date/ EPA Approval date Explanation
provision nonattainment area effective
date
----------------------------------------------------------------------------------------------------------------
* * * * * * *
110(a)(1) and (2) Infrastructure Mississippi......... 12/7/2007 5/7/2014 [Insert Addressing prong 4
Requirements for 1997 Fine citation of of section
Particulate Matter National publication]. 110(a)(2)(D)(i)
Ambient Air Quality Standards. only.
110(a)(1) and (2) Infrastructure Mississippi......... 10/6/2009 5/7/2014 [Insert Addressing prong 4
Requirements for 2006 Fine citation of of section
Particulate Matter National publication]. 110(a)(2)(D)(i)
Ambient Air Quality Standards. only.
----------------------------------------------------------------------------------------------------------------
[[Page 26149]]
Subpart II--North Carolina
0
6. Section 52.1770(e) is amended by adding two new entries for
``110(a)(1) and (2) Infrastructure Requirements for 1997 Fine
Particulate Matter National Ambient Air Quality Standards'' and
``110(a)(1) and (2) Infrastructure Requirements for 2006 Fine
Particulate Matter National Ambient Air Quality Standards'' at the end
of the table to read as follows:
Sec. 52.1770 Identification of plan.
* * * * *
(e) * * *
EPA-Approved North Carolina Non-Regulatory Provisions
----------------------------------------------------------------------------------------------------------------
State
Provision effective EPA Approval date Federal Register Explanation
date citation
----------------------------------------------------------------------------------------------------------------
* * * * * * *
110(a)(1) and (2) Infrastructure 4/1/2008 5/7/2014............ [Insert citation of Addressing prong 4
Requirements for 1997 Fine publication]. of section
Particulate Matter National 110(a)(2)(D)(i)
Ambient Air Quality Standards. only.
110(a)(1) and (2) Infrastructure 9/21/2009 5/7/2014 [Insert [Insert citation of Addressing prong 4
Requirements for 2006 Fine citation of publication]. of section
Particulate Matter National publication]. 110(a)(2)(D)(i)
Ambient Air Quality Standards. only.
----------------------------------------------------------------------------------------------------------------
Subpart PP--South Carolina
0
7. Section 52.2120(e) is amended by adding two new entries for
``110(a)(1) and (2) Infrastructure Requirements for 1997 Fine
Particulate Matter National Ambient Air Quality Standards'' and
``110(a)(1) and (2) Infrastructure Requirements for 2006 Fine
Particulate Matter National Ambient Air Quality Standards'' at the end
of the table to read as follows:
Sec. 52.2120 Identification of plan.
* * * * *
(e) * * *
EPA-Approved South Carolina Non-Regulatory Provisions
----------------------------------------------------------------------------------------------------------------
State
Provision effective EPA Approval date Explanation
date
----------------------------------------------------------------------------------------------------------------
* * * * * * *
110(a)(1) and (2) Infrastructure 4/14/2008 5/7/2014 [Insert citation Addressing prong 4 of
Requirements for 1997 Fine Particulate of publication]. section 110(a)(2)(D)(i)
Matter National Ambient Air Quality only.
Standards.
110(a)(1) and (2) Infrastructure 9/18/2009 5/7/2014 [Insert citation Addressing prong 4 of
Requirements for 2006 Fine Particulate of publication]. section 110(a)(2)(D)(i)
Matter National Ambient Air Quality only.
Standards.
----------------------------------------------------------------------------------------------------------------
Subpart RR--Tennessee
0
8. Section 52.2220(e), is amended by adding two new entries for
``110(a)(1) and (2) Infrastructure Requirements for 1997 Fine
Particulate Matter National Ambient Air Quality Standards'' and
``110(a)(1) and (2) Infrastructure Requirements for 2006 Fine
Particulate Matter National Ambient Air Quality Standards'' at the end
of the table to read as follows:
Sec. 52.2220 Identification of plan.
* * * * *
(e) * * *
EPA-Approved Tennessee Non-Regulatory Provisions
----------------------------------------------------------------------------------------------------------------
Applicable State
Name of nonregulatory SIP geographic or effective EPA Approval date Explanation
provision nonattainment area date
----------------------------------------------------------------------------------------------------------------
* * * * * * *
110(a)(1) and (2) Infrastructure Tennessee........... 12/14/2007 5/7/2014 [Insert Addressing prong 4
Requirements for 1997 Fine citation of of section
Particulate Matter National publication]. 110(a)(2)(D)(i)
Ambient Air Quality Standards. only.
110(a)(1) and (2) Infrastructure Tennessee........... 10/19/2009 5/7/2014 [Insert Addressing prong 4
Requirements for 2006 Fine citation of of section
Particulate Matter National publication]. 110(a)(2)(D)(i)
Ambient Air Quality Standards. only.
----------------------------------------------------------------------------------------------------------------
[[Page 26150]]
[FR Doc. 2014-10347 Filed 5-6-14; 8:45 am]
BILLING CODE 6560-50-P