DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12704-007]
Maine Tidal Power; Notice of Preliminary Permit Application
Accepted For Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On December 2, 2013, Maine Tidal Power filed an application for a
successive preliminary permit, pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the feasibility of the Half Moon
Cove Tidal Power Project (Half Moon Cove Project) to be located in
Cobscook and Passamaquoddy Bay, near the cities of Eastport and Perry,
Washington County, Maine. The sole purpose of a preliminary permit, if
issued, is to grant the permit holder priority to file a license
application during the permit term. A preliminary permit does not
authorize the permit holder to perform any land-disturbing activities
or otherwise enter upon lands or waters owned by others without the
owners' express permission.
The proposed project would consist of the following: (1) A new
1,200-foot-long tidal wall with a crest elevation of approximately 27
feet above mean sea level (msl); (2) a new 60-foot-wide, 20-foot-high
filling and empting gate; (3) the 850-acre Half Moon Cove with a
surface elevation of 13.0 feet above msl; (4) a new 60-foot-wide, 125-
foot-long gated powerhouse with four turbine generating units with a
total capacity of 21.5 megawatts; (5) a new 34.5 kilovolt, 7.1-mile-
long transmission line extending from the project powerhouse to an
existing substation owned by Bangor Hydroelectric Company located in
the town of Pembroke, ME (the point of interconnection with the
distribution grid); and (6) appurtenant facilities. The estimated
annual generation of the Half Moon Cove Project would be 30,000
megawatt-hours.
Applicant Contact: Mr. Normand Laberge, Maine Tidal Power, 46 Place
Cove Road, Trescott, Maine 04652; phone: (207) 733-5513.
FERC Contact: Tom Dean; phone: (202) 502-6041; or
[email protected].
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-12704-007.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-12704) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: January 30, 2014.
Kimberly D. Bose,
Secretary.