[Federal Register Volume 79, Number 15 (Thursday, January 23, 2014)]
[Notices]
[Page 3798]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2014-01281]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 637-097]
PUD No. 1 of Chelan County; Notice of Application Accepted for
Filing and Soliciting Comments, Motions to Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Non-project use of project lands and waters
b. Project No: 637-097
c. Date Filed: January 7, 2014
d. Applicant: Public Utility District No. 1 of Chelan County
e. Name of Project: Lake Chelan Hydroelectric Project
f. Location: Chelan River in Chelan County, Washington.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a--825r
h. Applicant Contact: Michelle Smith, Licensing and Compliance
Manager, Public Utility District No. 1 of Chelan County, 327 North
Wenatchee Avenue, Wenatchee, Washington 98801. Phone: 888-663-8121, ext
4180. Email: [email protected].
i. FERC Contact: Shana High at (202) 502-8674, or email:
[email protected].
j. Deadline for filing comments, motions to intervene, and
protests: February 14, 2014.
All documents may be filed electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at [email protected] or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Secretary, Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426.
Please include the project number (P-637-097) on any comments, motions,
or recommendations filed.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
k. Description of Request: Public Utility District No. 1 of Chelan
County proposes to permit Chelan Lookout LLC to construct a 70-slip
marina to provide boat moorage and lake access for property owners at
the Lookout at Lake Chelan, a residential development on Lake Chelan's
north shore. The 12,773 square-foot facility would be constructed on
private property (29%) and Washington Department of Natural Resources
leased land (71%). The application details proposed compensatory
mitigation. No dredging or fill would occur, and no fuel facilities are
proposed.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street, NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at http://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field (P-637) to access the document. You
may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, call 1-866-
208-3676 or email [email protected], for TTY, call (202) 502-
8659. A copy is also available for inspection and reproduction at the
address in item (h) above. Agencies may obtain copies of the
application directly from the applicant.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214, respectively. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
o. Filing and Service of Documents: Any filing must (1) bear in all
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO
INTERVENE'' as applicable; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person commenting, protesting or intervening; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis. Any filing made by an intervenor must be accompanied
by proof of service on all persons listed in the service list prepared
by the Commission in this proceeding, in accordance with 18 CFR
385.2010.
Dated: January 15, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-01281 Filed 1-22-14; 8:45 am]
BILLING CODE 6717-01-P