[Federal Register Volume 79, Number 10 (Wednesday, January 15, 2014)]
[Notices]
[Pages 2650-2651]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2014-00540]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2058-086]
Avista Corporation; Notice of Application To Amend License and
Accepted for Filing, Soliciting Comments, Motions To Intervene, and
Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Amendment to License.
b. Project No: 2058-086.
c. Date Filed: December 12, 2013.
d. Applicant: Avista Corporation.
e. Name of Project: Clark Fork Hydroelectric Project.
f. Location: On the Clark Fork River in Bonner County, Idaho and
Sanders County, Montana. The project occupies federal lands
administered by the US Forest Service.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Avista, Attn: Timothy J. Swant, MSC-1, P.O.
Box 3727, Spokane, WA 99220-3727, (406)-847-1282.
i. FERC Contact: Steven Sachs at (202) 502-8666; or
[email protected].
j. Deadline for filing comments, motions to intervene, and
protests, is 30 days from the issuance date of this notice by the
Commission. The Commission strongly encourages electronic filing.
Please file any motion to intervene, protest, comments, and/or
recommendations using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-2058-086.
k. Description of Request: The applicant proposes to modify the
Noxon Rapids development of the Clark Fork Project by removing three
900-foot-long, 230-kilovolt (kV) transmission lines and replacing them
with three new 3,800-foot-long, 230-kV transmission lines. Construction
of the new transmission lines would require the project boundary to be
expanded by 12 acres onto land owned by the applicant.
l. Locations of the Application: This filing may be viewed on the
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number P-2058 in the docket number field to access the
document. You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and
issuances related to this or other pending projects. For assistance,
call 1-866-208-3676 or email [email protected], for TTY, call
(202) 502-8659. A copy is also available for inspection and
reproduction at the address in item (h) above and at the Commission's
Public Reference Room, located at 888 First Street, NE., Room 2A,
Washington, DC 20426, or by calling (202) 502-8371.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
[[Page 2651]]
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis and otherwise comply with the requirements of 18 CFR
4.34(b). All comments, motions to intervene, or protests should relate
to project works which are the subject of the license amendment.
Agencies may obtain copies of the application directly from the
applicant. A copy of any protest or motion to intervene must be served
upon each representative of the applicant specified in the particular
application. If an intervener files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency. A copy of all other
filings in reference to this application must be accompanied by proof
of service on all persons listed in the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and
385.2010.
Dated: January 8, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-00540 Filed 1-14-14; 8:45 am]
BILLING CODE 6717-01-P