DEPARTMENT OF ENERGY
Office of Energy Efficiency and Renewable Energy
Nationwide Categorical Waivers Under the American Recovery and
Reinvestment Act of 2009 (Recovery Act)
AGENCY: Office of Energy Efficiency and Renewable Energy, U.S.
Department of Energy (DOE).
ACTION: Notice of Amended Limited Waivers.
-----------------------------------------------------------------------
SUMMARY: The U.S. Department of Energy (DOE) is hereby granting an
Amended Waiver of section 1605 of the American Reinvestment and
Recovery Act of 2009 (Recovery Act Buy American provisions) in EERE-
funded projects for LED tube lights to replace T8/other 4 foot
fluorescents.
DATES: Effective Date: November 6, 2012.
FOR FURTHER INFORMATION CONTACT: Christine Platt-Patrick, Office of
Energy Efficiency and Renewable Energy (EERE), (202) 586-7691,
Department of Energy, 1000 Independence Avenue SW., Mailstop EE-2K,
Washington, DC 20585.
SUPPLEMENTARY INFORMATION: Under the authority of Recovery Act, Pub. L.
111-5, section 1605(b)(2), the head of a Federal department or agency
may issue a ``determination of inapplicability'' (a waiver of the Buy
American provision) if the iron, steel, or relevant manufactured good
is not produced or manufactured in the United States in sufficient and
reasonably available quantities and of a satisfactory quality
(``nonavailability''). The authority of the Secretary of Energy to make
all inapplicability determinations was re-delegated to the Assistant
Secretary for Energy Efficiency and Renewable Energy (EERE), for EERE
projects under the Recovery Act, in Redelegation Order No. 00-002.01E,
dated April 25, 2011.
On September 30, 2010, The Assistant Secretary issued a
nonavailability waiver for LED tube lights to replace T8/other 4 foot
fluorescents.
As with all waivers, the Assistant Secretary reserved the right to
revisit and amend this determination based on any changes in the
manufacturing landscape, such as the entry into the market of new
domestic manufacturers. In this case, domestic manufacturers have moved
manufacturing capacity to the United States, broadening the scope of
domestically manufactured LED lamps available for purchase.
The remaining items covered by the September 30, 2010 Waiver
(motorized automatic two (2) wing revolving doors;
self[hyphen]contained photovoltaic LED area lighting systems;
ultrasonic directional sensors and DC300 facility controllers for a
parking guidance system; load management ripple control receivers for
an existing load management system) continue to be covered by the
September 30, 2010 waiver and remain subject to the specifications and
conditions of that waiver.
In order for the withdrawn waivers to continue to apply substantial
steps to commit funds for the purchase of the formerly waived items
must have been made on or before November 30, 2012.
Substantial steps to commit funds would include, but are not
limited to, (1) Issuing a Request for Proposals (RFP) on or before
November 30, 2012 (applicable only where the grantee accepts a proposal
received under that RFP); (2) in the case of a sole source selection:
placing an order for the goods on or before November 30, 2012; (3)
commencing a bidding process on or before November 30, 2012; (4) in
circumstances where the grantee solicited quotes without an RFP: the
grantee purchases the goods based on a quote dated on or before
November 30, 2012 and the order for the goods is placed on or before
November 30, 2012; or (5) grantee has executed a contract or purchase
agreement with a supplier to acquire affected goods on or before
November 30, 2012.
EERE hereby provides notice that on November 6, 2012, an Amended
Waiver of section 1605 of the American Reinvestment and Recovery Act of
2009 (Recovery Act Buy American provisions) in EERE-funded projects for
LED tube lights to replace T8/other 4 foot fluorescents.
This amendment withdraws the nonavailability waiver issued on
September 30, 2010 for LED tube lights to replace T8/other 4 foot
fluorescents. This notice constitutes the detailed written
justification required by Section 1605(c) for waivers based on a
finding under subsection (b).
This waiver determination is pursuant to the delegation of
authority by the Secretary of Energy to the Assistant Secretary for
Energy Efficiency and Renewable Energy with respect to expenditures
within the purview of his responsibility. Consequently, this waiver
applies to all EERE projects carried out under the Recovery Act.
Authority: Public Law 111-5, section 1605.
Issued in Washington, DC on November 20, 2012.
David T. Danielson,
Assistant Secretary, Energy Efficiency and Renewable Energy, U.S.
Department of Energy.
Editorial Note: This document was received at the Office of the
Federal Register August 7, 2013.
[FR Doc. 2013-19476 Filed 8-9-13; 8:45 am]