Turnagain Arm Tidal Energy Corporation; Notice of Preliminary
Permit Application Accepted for Filing and Soliciting Comments, Motions
To Intervene, and Competing Applications
On February 1, 2013, the Turnagain Arm Tidal Energy Corporation,
filed an application for a preliminary permit, pursuant to section 4(f)
of the Federal Power Act (FPA), proposing to study the feasibility of
the Turnagain Arm Tidal Electric Generation Project (Turnagain Arm
Project or project) to be located on the Turnagain Arm of Cook Inlet
and adjacent lands of the Kenai Peninsula Borough and the Municipality
of Anchorage, Alaska. The sole purpose of a preliminary permit, if
issued, is to grant the permit holder priority to file a license
application during the permit term. A preliminary permit does not
authorize the permit holder to perform any land-disturbing activities
or
[[Page 44558]]
otherwise enter upon lands or waters owned by others without the
owners' express permission.
The proposed project would consist of the following: (1) An 8-mile-
long tidal fence situated between Fire Island near Anchorage and Point
Possession in the Kenai Peninsula Borough, and consisting of 24, 10-
megawatt (MW) Davis turbines with tidal-to-electrical energy generating
units for a total installed capacity of 240 MW; (2) one control
building/substation onshore near Anchorage and one near Point
Possession; (3) an 18-mile-long, 230-kilovolt (kV) submerged
transmission line connecting the tidal fence to the existing Chugach
Electric Association substation at Point Woronzof in Anchorage and a
new substation at Point Possession; (4) a 28-mile-long, 230-kV
aboveground transmission line running parallel to an existing Homer
Electric Association (HEA) transmission line corridor and extending
from Point Possession to the existing HEA Nikiski substation; and (5)
appurtenant facilities. The proposed project would have an estimated
average annual generation of 1,271,950 megawatt-hours.
Applicant Contact: Mr. Dominic Lee, President and Chief Executive
Officer, Turnagain Arm Tidal Energy Corporation, 821 N. Street, Suite
207, Anchorage, Alaska 99501; phone: (907) 274-7571.
FERC Contact: Kim Nguyen; phone: (202) 502-6105.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site http://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at [email protected] or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and five copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-13509) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: July 18, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-17812 Filed 7-23-13; 8:45 am]
BILLING CODE 6717-01-P