[Federal Register Volume 78, Number 115 (Friday, June 14, 2013)]
[Rules and Regulations]
[Pages 35757-35758]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2013-14123]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[USCG-2013-0395]
Drawbridge Operation Regulations; Connecticut River, Westport, CT
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, First Coast Guard District, has issued a
temporary deviation from the regulation governing the operation of the
Route 82 Bridge across the Connecticut River, mile 16.8, between East
Haddam and Haddam, Connecticut. The deviation is necessary to
facilitate public safety during a public event, the bridge's 100th
Anniversary Parade. Under this temporary deviation,
[[Page 35758]]
the bridge may remain closed for two and one half hours.
DATES: This deviation is effective between 8 a.m. and 10:30 a.m. on
June 15, 2013.
ADDRESSES: The docket for this deviation, [USCG-2013-0395] is available
at http://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH.'' Click on Open Docket Folder on the line
associated with this deviation. You may also visit the Docket
Management Facility in Room W12-140, on the ground floor of the
Department of Transportation West Building, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Ms. Judy Leung-Yee, Project Officer,
First Coast Guard District, [email protected], or (212) 668-
7165. If you have questions on viewing the docket, call Barbara
Hairston, Program Manager, Docket Operations, telephone 202-366-9826.
SUPPLEMENTARY INFORMATION: The Route 82 Bridge has a vertical clearance
of 22 feet at mean high water and 25 feet at mean low water in the
closed position. The existing drawbridge operating regulations are
found at 33 CFR 117.205(c).
The bridge owner, Connecticut Department of Transportation,
requested a two and a half hour closure to facilitate public safety
during a public event, the 100th Anniversary Parade at the bridge.
Under this temporary deviation the bridge may remain in the closed
position between 8 a.m. and 10:30 a.m. on June 15, 2013. Vessels that
can pass under the bridge without a bridge opening may do so at all
times.
The Connecticut River supports both commercial and recreational
navigation of various sizes.
In accordance with 33 CFR 117.35(e), the bridge must return to its
regular operating schedule immediately at the end of the designated
deviation period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: June 4, 2013.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. 2013-14123 Filed 6-13-13; 8:45 am]
BILLING CODE 9110-04-P