[Federal Register Volume 78, Number 40 (Thursday, February 28, 2013)]
[Notices]
[Pages 13621-13624]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2013-04648]
-----------------------------------------------------------------------
DEPARTMENT OF AGRICULTURE
Forest Service
San Bernardino National Forest; California; Omya Sentinel and
Butterfield Quarry Expansion Project
AGENCY: Forest Service, USDA.
ACTION: Notice of intent to prepare an environmental impact statement
and environmental impact report.
-----------------------------------------------------------------------
SUMMARY: Omya California (Omya), a division of Omya Inc., has submitted
the following applications:
An Amended Plan of Operations and Reclamation Plan to the
U.S. Department of Agriculture, Forest Service, San Bernardino National
Forest (SBNF); and
A Mining and Land Reclamation Plan Conditional Use Permit
application submitted to the County of San Bernardino (County).
Combined, these applications propose the expansion of the existing
Sentinel and Butterfield Quarries. The existing permitted Sentinel and
Butterfield limestone quarries are located on mining claims within the
SBNF. Known limestone ore resources, within the proposed quarry
expansions, will add an additional 20 years life to the Sentinel
Quarry, add an additional 40 years life to the Butterfield Quarry, and
will allow mining at both quarries to be extended until 2055. Depending
on market demand, the combined Sentinel and Butterfield Quarries
average ore production rates will be approximately 680,000 tons per
year compared to the 3-year average between 2004-2006 of approximately
378,000 tons per year. Reclamation will occur concurrently with mining.
The proposed expansion includes 48.7 acres of disturbance at the
Sentinel Quarry and 28.8 acres of disturbance at the Butterfield
Quarry, for a total of 77.3 acres. Quarry development and expansion
will be phased. Disturbance proposed for the project includes expansion
of existing Sentinel and Butterfield Quarries, expansion of associated
overburden placement sites, additional internal access roads and
ancillary facility areas, and minor adjustments to existing disturbance
boundaries. There are no new quarries, haul roads or overburden sites
in this plan, only the phased expanded development and reclamation of
the existing Sentinel and Butterfield Quarries.
Implementation of the Proposed Project will require discretionary
approvals from Federal, State, and local agencies and, therefore, this
project is subject to the environmental review requirements of both the
National Environmental Policy Act (NEPA) and the California
Environmental Quality Act (CEQA). To ensure coordination between the
NEPA and CEQA processes, and to avoid duplication of effort, a joint
Environmental Impact Statement (EIS) and Environmental Impact Report
(EIR) is being prepared as recommended by
[[Page 13622]]
CEQA Guidelines Section 15222 and 40 CFR 1506.25. The Forest Service is
the NEPA Lead Agency and the County will be the CEQA Lead Agency for
the joint EIR/EIS. As Lead Agency for the NEPA process, the Forest
Service issues this Notice of Intent (NOI), as required by NEPA, for
the Project. The County will issue a separate Notice of Preparation
(NOP), as required for CEQA for the Proposed Project.
Comments are being requested to help identify significant issues or
concerns related to the proposed action, to determine the scope of the
issues (including alternatives) that need to be analyzed and to
eliminate from detailed study those issues that are not significant.
Supporting documentation should be included with comments recommending
that the EIR/EIS address specific environmental issues.
DATES: Comments concerning the scope of the analysis must be received
by April 1, 2013. The draft EIR/EIS is expected October 2013 and the
final EIR/EIS is expected February 2014.
ADDRESSES: Send written comments to Maya Rohr, Omya Sentinel and
Butterfield--Quarries Expansion Project, Sespe Consulting, 5920 Friars
Road, Suite 103, San Diego, CA 92108. Comments may also be sent via
email to [email protected].
Public Scoping meetings will be held on March 11, 2013 at the Big
Bear Discovery Center, 40971 North Shore Drive (Highway 38), Fawnskin,
California 92333 beginning at 5 p.m. PST, and March 12, 2013 at the
Lucerne Valley Community Center, 33187 Highway 247 East, Lucerne
Valley, California 92356 beginning at 5 p.m. PST.
It is important that reviewers provide their comments at such times
and in such a way that they are useful to the Agency's preparation of
the EIR/EIS. Therefore, comments should be provided prior to the close
of the comment period and should clearly articulate the reviewer's
concerns and contentions.
Comments received in response to this solicitation, including names
and addresses of those who comment, will be part of the public record
for this proposed action. Comments submitted anonymously will be
accepted and considered, however.
FOR FURTHER INFORMATION CONTACT: Maya Rohr, Senior Project Manager,
Sespe Consulting at (619) 894-8669 or [email protected].
Individuals who use telecommunication devices for the deaf (TDD)
may call the Federal Information Relay Service (FIRS) at 1-800-877-8339
between 8 a.m. and 8 p.m., Eastern Time, Monday through Friday.
SUPPLEMENTARY INFORMATION: Omya California submitted the Amended Plan
of Operations and Reclamation Plan for the proposed expansion of the
existing Butterfield Limestone Quarry to the San Bernardino National
Forest, on November 1, 2010. The project was scoped as an Environmental
Assessment (EA), and through the analysis of the comments received, the
Responsible Official determined that an EIS would be prepared. At that
time, the project was expanded to include additional expansion at the
Sentinel Quarry as well.
The project site is located approximately 7.5 miles south of the
community of Lucerne Valley and 5 miles north of Big Bear Lake within
the SBNF in San Bernardino County, California, and is accessed by the
vested Crystal Creek Haul Road. The project area is within portions of
Sections 23, 24, and 25 Township 3 North, Range 1 West, SBBM. The
Butterfield and Sentinel Quarries are located entirely within portions
of approximately 954 acres of unpatented placer claims controlled by
Omya located on public land administered by the Forest Service. These
claims include Crystal Creek 1, 2, 4, 13 and 14, Slope North and King
3.
Both quarries have been mined by Omya since 1977. The Sentinel
Quarry is currently permitted to operate through the year 2035, and the
Butterfield Quarry through 2015. Known limestone resources, with the
proposed quarry expansions, will add an additional 40 years of
operations for Butterfield (2016 through 2055) and a proposed
additional 20 years for the Sentinel Quarry (2036 through 2055).
Depending on market demand, average ore production rates to the
processing plant in Lucerne Valley will increase to approximately
680,000 tons of ore to the plant per year, compared to the 3-year
average between 2004-2006 of approximately 378,000 tons per year.
The previously approved State Mining and Reclamation Act (SMARA)
Reclamation Plans (2003) include a site specific approved revegetation
plan, including growth media salvage, organics placement, seeding and
revegetation, seed collection and propagation, irrigation, site
cleanup, public safety, rock and fill slope stability, drainage and
erosion controls, monitoring and maintenance plan and bond release
criteria.
Purpose and Need for Action
Omya submitted an amended Plan of Operations and Reclamation Plan
to the Forest Service, and a Conditional Use Permit application and
Reclamation Plan to the County. These submittals describe the proposed
expansion of the existing Sentinel and Butterfield Quarries. The Forest
Service is analyzing the surface use of National Forest System lands in
connection with operations authorized by the United States mining laws
(30 U.S.C. 21-54). The United States mining laws confer a statutory
right to enter upon the public lands to search for minerals, and
require that these activities shall be conducted so as to minimize
adverse environmental impacts on National Forest System surface
resources (36 CFR 228.8). The responsibility for managing mineral
resources is in the Secretary of the Interior.
Within the United States, productive deposits of white, high purity
limestone are found in only a few areas. The Omya deposits are one of
these sources of high calcium limestone that can be used as whiting.
Whiting is used in the form of nontoxic fillers and extenders in a
large number of products ranging from paper products to environmental
cleanup, carpet backing, plastics, PVC, paint, paper and other building
products. Limestone mining provides numerous environmental benefits
including fewer trees harvested for paper making, less petroleum
products utilized and less greenhouse gases produced. Limestone can
also be used as a substitute for other components in industrial
processes and the manufacture of consumer products.
Proposed Action
The proposed expansion includes 48.7 acres of disturbance at the
Sentinel Quarry and 28.8 acres of disturbance at the Butterfield Quarry
for a total of 77.3 acres. Disturbance proposed for this project
includes expansion of existing Sentinel and Butterfield Quarries,
expansion of associated overburden placement sites, haul road and
ancillary facility areas, and minor adjustments to existing disturbance
boundaries. Reclamation for the inactive Cloudy and Claudia quarries,
overburden stockpiles, and haul roads on Forest Service lands,
including reclamation of the Crystal Creek Haul Road, are covered in
the 1994 approved Reclamation Plan and incorporated into the proposed
Amended Plan. There are no changes to these sites with the exception of
extending the years of use of the Crystal Creek Haul Road by 10 years
from 2046 to 2055 followed by 10 years of reclamation. There are no new
quarries, haul roads or overburden sites in this plan, only the phased
expanded development and reclamation of existing Sentinel Quarry and
Butterfield Quarry.
[[Page 13623]]
Both the Sentinel and Butterfield Quarries are multi-bench open pit
mines where five grades of ore are selectively mined. The ore is
drilled and blasted, loaded into haul trucks, and hauled to a crusher
located near the Sentinel Quarry (Sentinel crusher). The Sentinel
resources are mined in 30-foot cuts with a 30-35 foot safety bench
approximately every 60 feet of depth and will have up to 11 benches.
The Butterfield deposit is mined in 25 foot cuts with a safety bench
approximately every 50 feet and will have up to 8 benches. Bench height
has been determined as a result of detailed studies of the geologic
structure. Face angles for both quarries average 70 degrees. The
highest level of the pit at the Sentinel Quarry is at an elevation of
7,600 feet above mean sea level (amsl) and mining will ultimately reach
7,000 feet amsl. The highest level of the pit at the Butterfield Quarry
is 7,900 feet and mining will ultimately reach 7,650 feet amsl.
Project Phasing. Although mining is more or less continuous, the
development of the quarries will be phased. The proposed expansion for
both quarries includes four (4) 10-year mining phases or pushbacks
starting in the year 2016 for the Sentinel Quarry and 2015 for the
Butterfield Quarry. The Sentinel quarry will be progressively developed
to the south, west, and east property line, and eventually deepened to
the footwall to reach the final depth of 7,000 feet amsl. Backfilling
will start on the northern wall and gradually filling the quarry to
approximate original contours. The Butterfield quarry will be mined
during the first four phases from east to west on several levels within
the quarry and will eventually deepen to reach a final depth of 7,700
(western portion) to 7,650 (eastern portion) feet amsl. During mining
of the western half of the Butterfield Quarry, concurrent backfilling
of the eastern quarry area will occur. Ultimately the eastern portion
will be completely backfilled to approximate original contours. The
overburden will be progressively placed in the eastern portion of the
Butterfield Quarry, but only after those portions of the quarry have
reached their final outer limit and the ore has been mined out. Phase 5
involves reclamation.
Reclamation. To minimize impacts to the surrounding environment,
Omya proposes to reclaim the quarry sites in a manner that meets both
Forest Service Minerals Regulations (36 CFR part 228, Subpart A), under
the jurisdiction of the Forest Service, and the California Surface
Mining and Reclamation Act of 1975, as amended (SMARA), which is
implemented by the County.
The Forest Service approved the previous Omya Umbrella Plan of
Operations and Reclamation Plan in 1988. The SMARA Reclamation Plan
(94M-02) was approved by the Forest Service and the County in 1994. The
Forest Service approved the existing Plan of Operations and Reclamation
Plan for Butterfield and Sentinel Quarries in 2002, following
completion of an environmental assessment and evaluation of the Plan of
Operations. The SMARA Reclamation Plan was amended and approved by the
County in 2003.
No changes in the approved revegetation plans are proposed other
than increased acres and timing changes. Timing schedules are revised
for the development and reclamation of the Sentinel and Butterfield
quarries as detailed in the Amended Plan of Operations and Reclamation
Plan. Reclamation costs for the quarry sites have been revised.
Reclamation will be monitored as required in the approved monitoring
plan for 10 years, and the bond reviewed yearly and adjusted to reflect
completed reclamation, new disturbance, and variations in the economy
(inflation).
Final reclamation will take place within 10 years of terminating
mining activities. All remaining equipment will be removed, stockpiles
will either be removed or used during reclamation, and internal roads
not needed for site access, reclamation, and revegetation and general
site monitoring will be reclaimed. Final sloping of quarry walls,
backfilled areas, and overburden stockpiles; erosion control; and
revegetation of any unreclaimed areas and waste rock stockpiles will be
conducted. Some haul roads may be left onsite for use in the
revegetation and monitoring activities and for overall site public
safety. Ongoing maintenance of fencing, signs, and erosion control will
be conducted. Roads not needed for site and quarry access will be
ripped, covered with available growth media, and revegetated. Other
onsite roads needed for quarry and pad access will be reclaimed after
reclamation of quarries and pads are certified complete, as determined
by the Forest Service, in order to allow access to all reclamation
areas.
Avoidance/Minimization and Environmental Protection Measures. The
Amended Plan of Operations includes avoidance/minimization and
environmental protection measures, including:
1. Quit claim to the SBNF 300 acres of unpatented mining claims
held within the SBNF which are known to have occupied endangered
species habitat agreed upon by the Forest Service and consistent with
the 2003 Carbonate Habitat Management Strategy (CHMS).
2. Design the mine plan to deposit future overburden into existing
overburden areas and completed quarries as much as feasible to avoid
possible impacts to existing cushenbury oxytheca populations.
3. Submit additional reclamation bond to cover the new disturbance
in the expansion areas prior to starting the development work.
4. Implement a Dust Management Plan (DMP) for the quarry expansion
areas.
5. Implement an Employee Awareness Plan that will provide
information, training, and protection measures on the following:
A. Mining within Critical Habitat for listed plant species in
cooperation with United States Fish and Wildlife Service (USFWS) and
Forest Service.
B. Mining in proximity to an area of Forest Service land segregated
from mineral entry and location in cooperation with BLM and Forest
Service (CHMS designated refugia).
C. Awareness and protection measures about bighorn sheep in
cooperation with USFWS, California Department of Fish and Game (CDFG),
and Forest Service.
D. Benefits of preserving heritage resources in cooperation with
the Forest Service.
6. Continue maintaining the water guzzler for bighorn sheep near
the north end of the Sentinel Quarry.
7. Continue support of CDFG bighorn sheep studies during the mining
project.
8. Dispose of sediment from runoff control basins to pre-approved
sites rather than side cast down slopes.
9. As areas become available after the completion of mining,
implement concurrent reclamation/revegetation of completed quarries and
overburden stockpiles to reduce visual impacts through backfilling,
recontouring and slope reduction, growth media and habitat log
placement, revegetation with native plant species, and colorization as
applicable.
10. Any unexpected or unforeseen events will result in immediate
notification to the Forest Service. If conditions are encountered that
vary significantly from the assumptions used in the mine design and
environmental assessments, Omya will coordinate with the Forest Service
to determine required actions.
11. Monitoring as described below is incorporated to be part of the
approved Plan of Operations: Forest Mine Administrator, Certified
Mineral
[[Page 13624]]
Examiner or other qualified specialists will document and assure the
avoidance/minimization and environmental protection measures
incorporated into the Plan of Operations and the Decision are being
followed and that they are effective in protecting the environment.
Inspections will occur during the life of the project at least once a
year to document the site conditions and to assure the Plan of
Operations is being followed. If it is determined that a particular
environmental protection measure is not adequately protecting surface
resources, the Plan of Operations will be modified to correct the
situation. Significant changes may require additional analysis and
documentation in compliance with the National Environmental Policy Act.
Lead and Cooperating Agencies
The Forest Service, as lead agency under NEPA, and County of San
Bernardino, as the lead state agency under CEQA, will be preparing a
joint EIR/EIS. This EIR/EIS will analyze and disclose the potential
effects of the proposed limestone quarry expansion. The Mojave Desert
Air Quality Management District has agreed to participate as a
cooperating agency and to provide expertise regarding the proposed
actions' relationship to the relevant objectives of regional, State and
local land use plans, policies and controls.
Responsible Official
The Responsible Official under NEPA for the Omya Sentinel and
Butterfield Quarry Expansion project is the San Bernardino National
Forest Supervisor, Jody Noiron.
Nature of Decision To Be Made
The Responsible Official will decide whether to approve the Amended
Plan of Operations and Reclamation Plan following the environmental
analysis. The Forest Service does not have the authority to remove the
proponent's ability to mine their claim on National Forest System
lands. The Responsible Official will also decide if an amendment to the
San Bernardino National Forest Land Management Plan is required.
The County will decide whether to approve the Mining and Land
Reclamation Plan Conditional Use Permit following the environmental
analysis.
Scoping Process
This notice of intent initiates the scoping process, which guides
the development of the EIR/EIS. The complete amended Plan of Operation
and Reclamation Plan is available on the San Bernardino National Forest
Web site at: http://www.fs.fed.us/nepa/fs-usda-pop.php/?project=32613.
Public Scoping meetings will be held on March 11, 2013 at the Big
Bear Discovery Center, 40971 North Shore Drive (Highway 38), Fawnskin,
California 92333 beginning at 5 p.m. PST, and March 12, 2013 at the
Lucerne Valley Community Center, 33187 Highway 247 East, Lucerne
Valley, California 92356 beginning at 5 p.m. PST.
It is important that reviewers provide their comments at such times
and in such manner that they are useful to the agency's preparation of
the EIR/EIS. Therefore, comments should be provided prior to the close
of the comment period and should clearly articulate the reviewer's
concerns and contentions.
Dated: February 21, 2013.
Jody Noiron,
Forest Supervisor.
[FR Doc. 2013-04648 Filed 2-27-13; 8:45 am]