[Federal Register Volume 78, Number 29 (Tuesday, February 12, 2013)]
[Notices]
[Pages 9945-9951]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2013-03201]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2013-0023]


Applications and Amendments to Facility Operating Licenses and 
Combined Licenses Involving Proposed No Significant Hazards 
Considerations and Containing Sensitive Unclassified Non-Safeguards 
Information and Order Imposing Procedures for Access to Sensitive 
Unclassified Non-Safeguards Information

AGENCY: Nuclear Regulatory Commission.

ACTION: License amendment request; opportunity to comment, request a 
hearing, and petition for leave to intervene, order.

-----------------------------------------------------------------------

DATES: Submit comments by March 14, 2013. Requests for a hearing or 
leave to intervene must be filed by April 15,

[[Page 9946]]

2013. Any potential party as defined in Sec.  2.4 of Title 10 of the 
Code of Federal Regulations (10 CFR), who believes access to Sensitive 
Unclassified Non-Safeguards Information (SUNSI) is necessary to respond 
to this notice must request document access by February 22, 2013.

ADDRESSES: You may access information and comment submissions related 
to this document, which the NRC possesses and are publically available, 
by searching on http://www.regulations.gov under Docket ID NRC-2013-
0023. You may submit comments by any of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2013-0023. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-492-
3668; email: [email protected].
     Mail comments to: Cindy Bladey, Chief, Rules, 
Announcements, and Directives Branch (RADB), Office of Administration, 
Mail Stop: TWB-05-B01M, U.S. Nuclear Regulatory Commission, Washington, 
DC 20555-0001.
     Fax comments to: RADB at 301-492-3446.
    For additional direction on accessing information and submitting 
comments, see ``Accessing Information and Submitting Comments'' in the 
SUPPLEMENTARY INFORMATION section of this document.

SUPPLEMENTARY INFORMATION: 

I. Accessing Information and Submitting Comments

A. Accessing Information

    Please refer to Docket ID NRC-2013-0023 when contacting the NRC 
about the availability of information regarding this document. You may 
access information related to this document by any of the following 
methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2013-0023.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may access publicly-available documents online in the NRC 
Library at http://www.nrc.gov/reading-rm/adams.html. To begin the 
search, select ``ADAMS Public Documents'' and then select ``Begin Web-
based ADAMS Search.'' For problems with ADAMS, please contact the NRC's 
Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-
4737, or by email to [email protected]. The ADAMS accession number 
for each document referenced in this notice (if that document is 
available in ADAMS) is provided the first time that a document is 
referenced.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

B. Submitting Comments

    Please include Docket ID NRC-2013-0023 in the subject line of your 
comment submission, in order to ensure that the NRC is able to make 
your comment submission available to the public in this docket.
    The NRC cautions you not to include identifying or contact 
information that that you do not want to be publicly disclosed in your 
comment submission. The NRC will post all comment submissions at http://www.regulations.gov as well as enter the comment submissions into 
ADAMS. The NRC does not routinely edit comment submissions to remove 
identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, then you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
state that the NRC does not routinely edit comment submissions to 
remove such information before making the comment submissions available 
to the public or entering the comment submissions into ADAMS.

II. Background

    Pursuant to Section 189a.(2) of the Atomic Energy Act of 1954, as 
amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is 
publishing this notice. The Act requires the Commission to publish 
notice of any amendments issued, or proposed to be issued and grants 
the Commission the authority to issue and make immediately effective 
any amendment to an operating license or combined license, as 
applicable, upon a determination by the Commission that such amendment 
involves no significant hazards consideration, notwithstanding the 
pendency before the Commission of a request for a hearing from any 
person.
    This notice includes notices of amendments containing SUNSI.

Notice of Consideration of Issuance of Amendments to Facility Operating 
Licenses and Combined Licenses, Proposed No Significant Hazards 
Consideration Determination, and Opportunity for a Hearing

    The Commission has made a proposed determination that the following 
amendment requests involve no significant hazards consideration. Under 
the Commission's regulations in 10 CFR 50.92, this means that operation 
of the facility in accordance with the proposed amendment would not (1) 
involve a significant increase in the probability or consequences of an 
accident previously evaluated; or (2) create the possibility of a new 
or different kind of accident from any accident previously evaluated; 
or (3) involve a significant reduction in a margin of safety. The basis 
for this proposed determination for each amendment request is shown 
below.
    The Commission is seeking public comments on this proposed 
determination. Any comments received within 30 days after the date of 
publication of this notice will be considered in making any final 
determination.
    Normally, the Commission will not issue the amendment until the 
expiration of 60 days after the date of publication of this notice. The 
Commission may issue the license amendment before expiration of the 60-
day period provided that its final determination is that the amendment 
involves no significant hazards consideration. In addition, the 
Commission may issue the amendment prior to the expiration of the 30-
day comment period should circumstances change during the 30-day 
comment period such that failure to act in a timely way would result, 
for example, in derating or shutdown of the facility. Should the 
Commission take action prior to the expiration of either the comment 
period or the notice period, it will publish in the Federal Register a 
notice of issuance. Should the Commission make a final No Significant 
Hazards Consideration Determination, any hearing will take place after 
issuance. The Commission expects that the need to take this action will 
occur very infrequently.
    Within 60 days after the date of publication of this notice, any 
person(s) whose interest may be affected by this action may file a 
request for a hearing and a petition to intervene with respect to 
issuance of the amendment to the subject facility operating license or 
combined license. Requests for a hearing and a petition for leave to

[[Page 9947]]

intervene shall be filed in accordance with the Commission's ``Agency 
Rules of Practice and Procedure'' in 10 CFR Part 2. Interested 
person(s) should consult a current copy of 10 CFR 2.309, which is 
available at the NRC's PDR, located at One White Flint North, Room O1-
F21, 11555 Rockville Pike (first floor), Rockville, Maryland 20852. The 
NRC regulations are accessible electronically from the NRC Library on 
the NRC's Web site at http://www.nrc.gov/reading-rm/doc-collections/cfr/. If a request for a hearing or petition for leave to intervene is 
filed within 60 days, the Commission or a presiding officer designated 
by the Commission or by the Chief Administrative Judge of the Atomic 
Safety and Licensing Board Panel, will rule on the request and/or 
petition; and the Secretary or the Chief Administrative Judge of the 
Atomic Safety and Licensing Board will issue a notice of a hearing or 
an appropriate order.
    As required by 10 CFR 2.309, a petition for leave to intervene 
shall set forth with particularity the interest of the petitioner in 
the proceeding, and how that interest may be affected by the results of 
the proceeding. The petition should specifically explain the reasons 
why intervention should be permitted with particular reference to the 
following general requirements: (1) The name, address, and telephone 
number of the requestor or petitioner; (2) the nature of the 
requestor's/petitioner's right under the Act to be made a party to the 
proceeding; (3) the nature and extent of the requestor's/petitioner's 
property, financial, or other interest in the proceeding; and (4) the 
possible effect of any decision or order which may be issued in the 
proceeding on the requestor's/petitioner's interest. The petition must 
also set forth the specific contentions which the requestor/petitioner 
seeks to have litigated at the proceeding.
    Each contention must consist of a specific statement of the issue 
of law or fact to be raised or controverted. In addition, the 
requestor/petitioner shall provide a brief explanation of the bases for 
the contention and a concise statement of the alleged facts or expert 
opinion which support the contention and on which the requestor/
petitioner intends to rely in proving the contention at the hearing. 
The requestor/petitioner must also provide references to those specific 
sources and documents of which the petitioner is aware and on which the 
requestor/petitioner intends to rely to establish those facts or expert 
opinion. The petition must include sufficient information to show that 
a genuine dispute exists with the applicant on a material issue of law 
or fact. Contentions shall be limited to matters within the scope of 
the amendment under consideration. The contention must be one which, if 
proven, would entitle the requestor/petitioner to relief. A requestor/
petitioner who fails to satisfy these requirements with respect to at 
least one contention will not be permitted to participate as a party.
    Those permitted to intervene become parties to the proceeding, 
subject to any limitations in the order granting leave to intervene, 
and have the opportunity to participate fully in the conduct of the 
hearing.
    If a hearing is requested, and the Commission has not made a final 
determination on the issue of no significant hazards consideration, the 
Commission will make a final determination on the issue of no 
significant hazards consideration. The final determination will serve 
to decide when the hearing is held. If the final determination is that 
the amendment request involves no significant hazards consideration, 
the Commission may issue the amendment and make it immediately 
effective, notwithstanding the request for a hearing. Any hearing held 
would take place after issuance of the amendment. If the final 
determination is that the amendment request involves a significant 
hazards consideration, then any hearing held would take place before 
the issuance of any amendment.
    All documents filed in the NRC adjudicatory proceedings, including 
a request for hearing, a petition for leave to intervene, any motion or 
other document filed in the proceeding prior to the submission of a 
request for hearing or petition to intervene, and documents filed by 
interested governmental entities participating under 10 CFR 2.315(c), 
must be filed in accordance with the NRC's E-Filing rule (72 FR 49139; 
August 28, 2007). The E-Filing process requires participants to submit 
and serve all adjudicatory documents over the internet, or in some 
cases to mail copies on electronic storage media. Participants may not 
submit paper copies of their filings unless they seek an exemption in 
accordance with the procedures described below.
    To comply with the procedural requirements of E-Filing, at least 10 
days prior to the filing deadline, the participant should contact the 
Office of the Secretary by email at [email protected], or by 
telephone at 301-415-1677, to request (1) a digital identification (ID) 
certificate, which allows the participant (or its counsel or 
representative) to digitally sign documents and access the E-Submittal 
server for any proceeding in which it is participating; and (2) advise 
the Secretary that the participant will be submitting a request or 
petition for hearing (even in instances in which the participant, or 
its counsel or representative, already holds an NRC-issued digital ID 
certificate). Based upon this information, the Secretary will establish 
an electronic docket for the hearing in this proceeding if the 
Secretary has not already established an electronic docket.
    Information about applying for a digital ID certificate is 
available on the NRC's public Web site at http://www.nrc.gov/site-help/e-submittals/apply-certificates.html. System requirements for accessing 
the E-Submittal server are detailed in the NRC's ``Guidance for 
Electronic Submission,'' which is available on the NRC's public Web 
site at http://www.nrc.gov/site-help/e-submittals.html. Participants 
may attempt to use other software not listed on the Web site, but 
should note that the NRC's E-Filing system does not support unlisted 
software, and the NRC Meta System Help Desk will not be able to offer 
assistance in using unlisted software.
    If a participant is electronically submitting a document to the NRC 
in accordance with the E-Filing rule, the participant must file the 
document using the NRC's online, Web-based submission form. In order to 
serve documents through the Electronic Information Exchange System, 
users will be required to install a Web browser plug-in from the NRC's 
Web site.
    Further information on the Web-based submission form, including the 
installation of the Web browser plug-in, is available on the NRC's 
public Web site at http://www.nrc.gov/site-help/e-submittals.html.
    Once a participant has obtained a digital ID certificate and a 
docket has been created, the participant can then submit a request for 
hearing or petition for leave to intervene. Submissions should be in 
Portable Document Format (PDF) in accordance with the NRC guidance 
available on the NRC's public Web site at http://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the time the 
documents are submitted through the NRC's E-Filing system. To be 
timely, an electronic filing must be submitted to the E-Filing system 
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of 
a transmission, the E-

[[Page 9948]]

Filing system time-stamps the document and sends the submitter an email 
notice confirming receipt of the document. The E-Filing system also 
distributes an email notice that provides access to the document to the 
NRC's Office of the General Counsel and any others who have advised the 
Office of the Secretary that they wish to participate in the 
proceeding, so that the filer need not serve the documents on those 
participants separately. Therefore, applicants and other participants 
(or their counsel or representative) must apply for and receive a 
digital ID certificate before a hearing request/petition to intervene 
is filed so that they can obtain access to the document via the E-
Filing system.
    A person filing electronically using the agency's adjudicatory E-
Filing system may seek assistance by contacting the NRC Meta System 
Help Desk through the ``Contact Us'' link located on the NRC's Web site 
at http://www.nrc.gov/site-help/e-submittals.html, by email at 
[email protected], or by a toll-free call at 1-866-672-7640. The 
NRC Meta System Help Desk is available between 8 a.m. and 8 p.m., 
Eastern Time, Monday through Friday, excluding government holidays.
    Participants who believe that they have a good cause for not 
submitting documents electronically must file an exemption request, in 
accordance with 10 CFR 2.302(g), with their initial paper filing 
requesting authorization to continue to submit documents in paper 
format. Such filings must be submitted by: (1) First class mail 
addressed to the Office of the Secretary of the Commission, U.S. 
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: 
Rulemaking and Adjudications Staff; or (2) courier, express mail, or 
expedited delivery service to the Office of the Secretary, Sixteenth 
Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 
20852, Attention: Rulemaking and Adjudications Staff. Participants 
filing a document in this manner are responsible for serving the 
document on all other participants. Filing is considered complete by 
first-class mail as of the time of deposit in the mail, or by courier, 
express mail, or expedited delivery service upon depositing the 
document with the provider of the service. A presiding officer, having 
granted an exemption request from using E-Filing, may require a 
participant or party to use E-Filing if the presiding officer 
subsequently determines that the reason for granting the exemption from 
use of E-Filing no longer exists.
    Documents submitted in adjudicatory proceedings will appear in the 
NRC's electronic hearing docket which is available to the public at 
http://ehd1.nrc.gov/ehd/, unless excluded pursuant to an order of the 
Commission, or the presiding officer. Participants are requested not to 
include personal privacy information, such as social security numbers, 
home addresses, or home phone numbers in their filings, unless an NRC 
regulation or other law requires submission of such information. With 
respect to copyrighted works, except for limited excerpts that serve 
the purpose of the adjudicatory filings and would constitute a Fair Use 
application, participants are requested not to include copyrighted 
materials in their submission.
    Petitions for leave to intervene must be filed no later than 60 
days from the date of publication of this notice. Requests for hearing, 
petitions for leave to intervene, and motions for leave to file new or 
amended contentions that are filed after the 60-day deadline will not 
be entertained absent a determination by the presiding officer that the 
filing demonstrates good cause by satisfying the following three 
factors in 10 CFR 2.309(c)(1): (i) The information upon which the 
filing is based was not previously available; (ii) the information upon 
which the filing is based is materially different from information 
previously available; and (iii) the filing has been submitted in a 
timely fashion based on the availability of the subsequent information.

Entergy Operations, Inc., System Energy Resources, Inc., South 
Mississippi Electric Power Association and Entergy Mississippi, Inc., 
Docket No. 50-416, Grand Gulf Nuclear Station, Unit 1 (GGNS), Claiborne 
County, Mississippi

    Date of amendment request: October 26, 2012. A publicly available 
version is in ADAMS under Accession No. ML12306A519.
    Description of amendment request: This amendment request contains 
sensitive unclassified non-safeguards information (SUNSI). The proposed 
amendment would delete paragraph 2.C.(32), Partial Feedwater Heating, 
of the GGNS facility operating license to allow GGNS to operate with 
the Final Feedwater Temperature Reduction (FFWTR) at the end of a fuel 
cycle for the purpose of extending the cycle. The FFWTR flexibility 
option would allow operating with a reduction of 100 degrees Fahrenheit 
([deg]F) in the feedwater temperature at rated thermal power 
conditions.
    Basis for proposed no significant hazards consideration 
determination: As required by 10 CFR 50.91(a), the licensee has 
provided its analysis of the issue of no significant hazards 
consideration, which is presented below:

    1. Does the proposed change involve a significant increase in 
the probability or consequences of an accident previously evaluated?
    Response: No.
    The effect of operating with Final Feedwater Temperature 
Reduction (FFWTR) on the probability and consequences of accidents, 
Anticipated Operational Occurrences (AOO), and events documented in 
the Updated Final Safety Analysis (UFSAR) was reviewed.
    The impact of FFWTR on the Design Basis Accident (DBA) Loss-of-
Coolant Accident (LOCA) was considered. Evaluations and analyses 
determined that the current licensing basis peak cladding 
temperature (PCT) of the fuel remains applicable for operating the 
Grand Gulf Nuclear Station (GGNS) with FFWTR. The analysis results 
indicate the following:
     The calculated maximum fuel element cladding 
temperature does not exceed 2,200 [deg]F.
     The calculated total local oxidation does not exceed 
17% times the total cladding thickness.
     The calculated total amount of hydrogen generated from 
a chemical reaction of the cladding with water or steam is less than 
1% times the hypothetical amount if all the metal in the cladding 
cylinder were to react.
     The core remains amenable to long term cooling, and 
there is sufficient long term core cooling available.
    Analysis also demonstrated that FFWTR operation at GGNS 
continues to meet design limits for the DBA-LOCA peak drywell 
pressure and temperature. Therefore, there is no increase in the 
consequence of an accident previously evaluated in the UFSAR.
    The only AOO that requires consideration in assessing the effect 
of FFWTR on event consequences is the feedwater controller failure--
increasing flow (FWCF). This is based upon the finding that the 
other AOOs are less sensitive to a reduction in feedwater 
temperature. The rated power and off-rated Power Distribution 
Limits, Critical Power Ratio (CPR), and Linear Heat Generation Rate 
(LHGR), for the FWCF event are validated on a cycle-specific basis 
to ensure compliance with: (1) the Safety Limit Minimum Critical 
Power Ratio (SLMCPR) and (2) the fuel rod thermal mechanical 
acceptance criteria of avoiding fuel centerline melt and 1% cladding 
plastic strain. Consequently, there is no increase in the 
consequences of an AOO previously evaluated.
    The impact of FFWTR on the consequences of the following events 
was also considered: Anticipated Transient without Scram (ATWS), 
vessel overpressure, thermal-hydraulic stability, and High Energy 
Line Break (HELB). The evaluation of ATWS and vessel overpressure 
concluded the consequences of the events at normal feedwater 
temperature remain bounding for

[[Page 9949]]

FFWTR. The evaluation of HELB determined the impact was bounded by 
the current design basis. The cycle-specific determinations and 
validations performed in accordance with NRC-approved methods ensure 
that the SLMCPR will be protected if a thermal-hydraulic instability 
event were to occur. Therefore, there is no increase in the 
consequence of these events previously evaluated in the UFSAR.
    In addition, the following areas were also evaluated. The 
reactor power level and operating pressure are not changed. FFWTR 
has no effect on the decay heat. Current design limits associated 
with long-term containment analyses, including a recirculation 
suction line break (RSLB), loss of offsite power (LOOP), 
intermediate break accident (IBA), small break accident (SBA), and 
NUREG-0783 safety/relief valve (SRV) steam discharge events continue 
to be supported without change. Therefore, there is no increase in 
the consequence of these events previously evaluated in the UFSAR.
    The probability of an accident is not affected by the proposed 
changes since no structures, systems or components (SSC) that could 
initiate an accident are affected. Therefore, the proposed changes 
do not significantly increase the probability of any previously 
evaluated accident.
    Based on the above discussion, the proposed change does not 
involve a significant increase in the probability or consequences of 
an accident previously evaluated.
    2. Does the proposed change create the possibility of a new or 
different kind of accident from any accident previously evaluated?
    Response: No.
    The proposed change does not alter the design function of any 
SSC. The implementation of FFWTR operation does not create the 
possibility of a new or different kind of accident. Power 
Distribution Limits for CPR, LHGR and Average Planar Linear Heat 
Generation Rate (APLHGR), and OPRM setpoints, which are determined 
in accordance with NRC-approved methods and are included in the Core 
Operating Limits Report (COLR) as part of the normal reload 
licensing process, continue to assure that core operation is in 
accordance with the conditions currently assumed for event 
initiation.
    FFWTR was reviewed against the accidents, AOOs, and events 
documented in the UFSAR. This review determined there is no adverse 
impact; the existing design basis remains bounding. In addition, the 
proposed change does not involve new system interactions or 
equipment modifications to the plant. FFWTR does not involve any new 
type of testing or maintenance. Therefore, there are no new design 
basis failure mechanisms, malfunctions, or accident initiators 
created by the proposed change.
    The existing low power scram bypass setpoint based on turbine 
first stage pressure and the calculated change in steam flow was 
evaluated. The current setpoint is based on operating with a 100 
[deg]F reduction in feedwater temperature; therefore, the setpoint 
is unaffected by FFWTR.
    Therefore, the proposed change does not create the possibility 
of a new or different kind of accident from any previously 
evaluated.
    3. Does the proposed change involve a significant reduction in a 
margin of safety?
    Response: No.
    The AOOs and accidents described in the UFSAR were evaluated for 
effects caused by the reduced feedwater temperature. For cycle-
independent considerations, the evaluations determined that the 
consequences of the events are either: (1) bounded by the current 
design and licensing basis results; (2) are within design acceptance 
criteria; or (3) do not change in a manner that would reduce the 
margin of safety. For cycle-specific considerations, cycle-specific 
analyses utilizing NRC-approved methods that produce the values of 
the limits documented in the COLR continue to assure that core 
operation is maintained within the existing design basis and safety 
limits. No design basis or safety limit is altered by the proposed 
change.
    The existing low power scram bypass setpoint based on turbine 
first stage pressure and the calculated change in steam flow was 
evaluated. The current setpoint is based on operating with a 
100[emsp14][deg]F reduction in feedwater temperature; therefore, the 
setpoint is unaffected by FFWTR.
    Therefore, the proposed change does not involve a significant 
reduction in a margin of safety.

    The NRC staff has reviewed the licensee's analysis and, based on 
this review, it appears that the three standards of 10 CFR 50.92(c) are 
satisfied. Therefore, the NRC staff proposes to determine that the 
amendment request involves no significant hazards consideration.
    Attorney for licensee: Joseph A. Aluise, Associate General 
Counsel--Nuclear, Entergy Services, Inc., 639 Loyola Avenue, New 
Orleans, Louisiana 70113.
    NRC Branch Chief: Michael T. Markley.

Order Imposing Procedures for Access to Sensitive Unclassified Non-
Safeguards Information for Contention Preparation.

Entergy Operations, Inc., System Energy Resources, Inc., South 
Mississippi Electric Power Association and Entergy Mississippi, Inc., 
Docket No. 50-416, Grand Gulf Nuclear Station, Unit 1 (GGNS), Claiborne 
County, Mississippi
    A. This Order contains instructions regarding how potential parties 
to this proceeding may request access to documents containing Sensitive 
Unclassified Non-Safeguards Information (SUNSI).
    B. Within 10 days after publication of this notice of hearing and 
opportunity to petition for leave to intervene, any potential party who 
believes access to SUNSI is necessary to respond to this notice may 
request such access. A ``potential party'' is any person who intends to 
participate as a party by demonstrating standing and filing an 
admissible contention under 10 CFR 2.309. Requests for access to SUNSI 
submitted later than 10 days after publication will not be considered 
absent a showing of good cause for the late filing, addressing why the 
request could not have been filed earlier.
    C. The requestor shall submit a letter requesting permission to 
access SUNSI to the Office of the Secretary, U.S. Nuclear Regulatory 
Commission, Washington, DC 20555-0001, Attention: Rulemakings and 
Adjudications Staff, and provide a copy to the Associate General 
Counsel for Hearings, Enforcement and Administration, Office of the 
General Counsel, Washington, DC 20555-0001. The expedited delivery or 
courier mail address for both offices is: U.S. Nuclear Regulatory 
Commission, 11555 Rockville Pike, Rockville, Maryland 20852. The email 
address for the Office of the Secretary and the Office of the General 
Counsel are [email protected] and [email protected], 
respectively.\1\ The request must include the following information:
---------------------------------------------------------------------------

    \1\ While a request for hearing or petition to intervene in this 
proceeding must comply with the filing requirements of the NRC's 
``E-Filing Rule,'' the initial request to access SUNSI under these 
procedures should be submitted as described in this paragraph.
---------------------------------------------------------------------------

    (1) A description of the licensing action with a citation to this 
Federal Register notice;
    (2) The name and address of the potential party and a description 
of the potential party's particularized interest that could be harmed 
by the action identified in C.(1); and
    (3) The identity of the individual or entity requesting access to 
SUNSI and the requestor's basis for the need for the information in 
order to meaningfully participate in this adjudicatory proceeding. In 
particular, the request must explain why publicly available versions of 
the information requested would not be sufficient to provide the basis 
and specificity for a proffered contention.
    D. Based on an evaluation of the information submitted under 
paragraph C.(3) the NRC staff will determine within 10 days of receipt 
of the request whether:
    (1) There is a reasonable basis to believe the petitioner is likely 
to establish standing to participate in this NRC proceeding; and
    (2) The requestor has established a legitimate need for access to 
SUNSI.
    E. If the NRC staff determines that the requestor satisfies both 
D.(1) and D.(2)

[[Page 9950]]

above, the NRC staff will notify the requestor in writing that access 
to SUNSI has been granted. The written notification will contain 
instructions on how the requestor may obtain copies of the requested 
documents, and any other conditions that may apply to access to those 
documents. These conditions may include, but are not limited to, the 
signing of a Non-Disclosure Agreement or Affidavit, or Protective 
Order\2\ setting forth terms and conditions to prevent the unauthorized 
or inadvertent disclosure of SUNSI by each individual who will be 
granted access to SUNSI.
---------------------------------------------------------------------------

    \2\ Any motion for Protective Order or draft Non-Disclosure 
Affidavit or Agreement for SUNSI must be filed with the presiding 
officer or the Chief Administrative Judge if the presiding officer 
has not yet been designated, within 30 days of the deadline for the 
receipt of the written access request.
---------------------------------------------------------------------------

    F. Filing of Contentions. Any contentions in these proceedings that 
are based upon the information received as a result of the request made 
for SUNSI must be filed by the requestor no later than 25 days after 
the requestor is granted access to that information. However, if more 
than 25 days remain between the date the petitioner is granted access 
to the information and the deadline for filing all other contentions 
(as established in the notice of hearing or opportunity for hearing), 
the petitioner may file its SUNSI contentions by that later deadline.
    G. Review of Denials of Access.
    (1) If the request for access to SUNSI is denied by the NRC staff 
after a determination on standing and need for access, the NRC staff 
shall immediately notify the requestor in writing, briefly stating the 
reason or reasons for the denial.
    (2) The requestor may challenge the NRC staff's adverse 
determination by filing a challenge within 5 days of receipt of that 
determination with: (a) The presiding officer designated in this 
proceeding; (b) if no presiding officer has been appointed, the Chief 
Administrative Judge, or if he or she is unavailable, another 
administrative judge, or an administrative law judge with jurisdiction 
pursuant to 10 CFR 2.318(a); or (c) if another officer has been 
designated to rule on information access issues, with that officer.
    H. Review of Grants of Access. A party other than the requestor may 
challenge an NRC staff determination granting access to SUNSI whose 
release would harm that party's interest independent of the proceeding. 
Such a challenge must be filed with the Chief Administrative Judge 
within 5 days of the notification by the NRC staff of its grant of 
access.
    If challenges to the NRC staff determinations are filed, these 
procedures give way to the normal process for litigating disputes 
concerning access to information. The availability of interlocutory 
review by the Commission of orders ruling on such NRC staff 
determinations (whether granting or denying access) is governed by 10 
CFR 2.311.\3\
---------------------------------------------------------------------------

    \3\ Requestors should note that the filing requirements of the 
NRC's E-Filing Rule (72 FR 49139; August 28, 2007) apply to appeals 
of NRC staff determinations (because they must be served on a 
presiding officer or the Commission, as applicable), but not to the 
initial SUNSI request submitted to the NRC staff under these 
procedures.
---------------------------------------------------------------------------

    I. The Commission expects that the NRC staff and presiding officers 
(and any other reviewing officers) will consider and resolve requests 
for access to SUNSI, and motions for protective orders, in a timely 
fashion in order to minimize any unnecessary delays in identifying 
those petitioners who have standing and who have propounded contentions 
meeting the specificity and basis requirements in 10 CFR Part 2. 
Attachment 1 to this Order summarizes the general target schedule for 
processing and resolving requests under these procedures.
    It is so ordered.

    Dated at Rockville, Maryland, this 6th day of February 2013.

    For the Nuclear Regulatory Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.

ATTACHMENT 1--General Target Schedule for Processing and Resolving 
Requests for Access to Sensitive Unclassified Non-Safeguards 
Information in this Proceeding

------------------------------------------------------------------------
                Day                            Event/Activity
------------------------------------------------------------------------
0.................................  Publication of Federal Register
                                     notice of hearing and opportunity
                                     to petition for leave to intervene,
                                     including order with instructions
                                     for access requests.
10................................  Deadline for submitting requests for
                                     access to Sensitive Unclassified
                                     Non-Safeguards Information (SUNSI)
                                     with information: supporting the
                                     standing of a potential party
                                     identified by name and address;
                                     describing the need for the
                                     information in order for the
                                     potential party to participate
                                     meaningfully in an adjudicatory
                                     proceeding.
60................................  Deadline for submitting petition for
                                     intervention containing: (i)
                                     Demonstration of standing; (ii) all
                                     contentions whose formulation does
                                     not require access to SUNSI (+25
                                     Answers to petition for
                                     intervention; +7 requestor/
                                     petitioner reply).
20................................  Nuclear Regulatory Commission (NRC)
                                     staff informs the requestor of the
                                     staff's determination whether the
                                     request for access provides a
                                     reasonable basis to believe
                                     standing can be established and
                                     shows need for SUNSI. (NRC staff
                                     also informs any party to the
                                     proceeding whose interest
                                     independent of the proceeding would
                                     be harmed by the release of the
                                     information.) If NRC staff makes
                                     the finding of need for SUNSI and
                                     likelihood of standing, NRC staff
                                     begins document processing
                                     (preparation of redactions or
                                     review of redacted documents).
25................................  If NRC staff finds no ``need'' or no
                                     likelihood of standing, the
                                     deadline for requestor/petitioner
                                     to file a motion seeking a ruling
                                     to reverse the NRC staff's denial
                                     of access; NRC staff files copy of
                                     access determination with the
                                     presiding officer (or Chief
                                     Administrative Judge or other
                                     designated officer, as
                                     appropriate). If NRC staff finds
                                     ``need'' for SUNSI, the deadline
                                     for any party to the proceeding
                                     whose interest independent of the
                                     proceeding would be harmed by the
                                     release of the information to file
                                     a motion seeking a ruling to
                                     reverse the NRC staff's grant of
                                     access.
30................................  Deadline for NRC staff reply to
                                     motions to reverse NRC staff
                                     determination(s).
40................................  (Receipt +30) If NRC staff finds
                                     standing and need for SUNSI,
                                     deadline for NRC staff to complete
                                     information processing and file
                                     motion for Protective Order and
                                     draft Non-Disclosure Affidavit.
                                     Deadline for applicant/licensee to
                                     file Non-Disclosure Agreement for
                                     SUNSI.
A.................................  If access granted: Issuance of
                                     presiding officer or other
                                     designated officer decision on
                                     motion for protective order for
                                     access to sensitive information
                                     (including schedule for providing
                                     access and submission of
                                     contentions) or decision reversing
                                     a final adverse determination by
                                     the NRC staff.
A + 3.............................  Deadline for filing executed Non-
                                     Disclosure Affidavits. Access
                                     provided to SUNSI consistent with
                                     decision issuing the protective
                                     order.
A + 28............................  Deadline for submission of
                                     contentions whose development
                                     depends upon access to SUNSI.
                                     However, if more than 25 days
                                     remain between the petitioner's
                                     receipt of (or access to) the
                                     information and the deadline for
                                     filing all other contentions (as
                                     established in the notice of
                                     hearing or opportunity for
                                     hearing), the petitioner may file
                                     its SUNSI contentions by that later
                                     deadline.

[[Page 9951]]

 
A + 53............................  (Contention receipt +25) Answers to
                                     contentions whose development
                                     depends upon access to SUNSI.
A + 60............................  (Answer receipt +7) Petitioner/
                                     Intervenor reply to answers.
>A + 60...........................  Decision on contention admission.
------------------------------------------------------------------

[FR Doc. 2013-03201 Filed 2-11-13; 8:45 am]
BILLING CODE 7590-01-P