[Federal Register Volume 77, Number 213 (Friday, November 2, 2012)]
[Notices]
[Page 66183]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2012-26876]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-9005-8]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7146 or http://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 10/22/2012 Through 10/26/2012
Pursuant to 40 CFR 1506.9.
Notice: Section 309(a) of the Clean Air Act requires that EPA make
public its comments on EISs issued by other Federal agencies. EPA's
comment letters on EISs are available at: http://www.epa.gov/compliance/nepa/eisdata.html.
SUPPLEMENTARY INFORMATION: As of October 1, 2012, EPA will not accept
paper copies or CDs of EISs for filing purposes; all submissions on or
after October 1, 2012 must be made through e-NEPA.
While this system eliminates the need to submit paper or CD copies
to EPA to meet filing requirements, electronic submission does not
change requirements for distribution of EISs for public review and
comment. To begin using e-NEPA, you must first register with EPA's
electronic reporting site--https://cdx.epa.gov/epa_home.asp.
EIS No. 20120344, Final EIS, BLM, AZ, Restoration Design Energy
Project, Proposed Resource Management Plan Amendments, Identifying
Lands Across Arizona Suitable for Renewable Energy Development, AZ,
Review Period Ends: 12/03/2012, Contact: Kathryn Pedrick 602-417-9235.
EIS No. 20120345, Revised Draft EIS, USFS, ID, Lower Orogrande Project,
Analysis of Three Alternatives, North Fork Ranger District, Clearwater
National Forest, Clearwater County, ID, Comment Period Ends: 12/17/
2012, Contact: Kathy Rodriguez 208-476-4541.
EIS No. 20120346, Final EIS, USFS, CA, Two Bit Vegetation Management
Project, Happy Camp Ranger District, Klamath National Forest, Siskiyou
County, CA, Review Period Ends: 12/17/2012, Contact: Wendy Coats 530-
841-4470
EIS No. 20120347, Draft EIS, USFS, OR, Summit Logan Valley Grazing
Authorization Project, Prairie City Ranger District, Malheur National
Forest, Grant County, OR, Comment Period Ends: 12/17/2012, Contact:
Randy Gould 541-820-3800.
EIS No. 20120348, Draft EIS, USFS, AZ, Show Low South Land Exchange,
Apache-Sitgreaves National Forests, Coconino National Forest, and
Prescott National Forest, Yavapai, Navajo, Greenlee, and Apache
Counties, AZ, Comment Period Ends: 12/17/2012, Contact: Stephen James
928-333-6266.
EIS No. 20120349, Draft EIS, FHWA, VA, Interstate 64 Peninsula, from
Interstate 95 in the City of Richmond to Interstate 664 in the City of
Hampton, VA, Comment Period Ends: 01/07/2013, Contact: John Simkins
804-371-6831.
EIS No. 20120350, Final EIS, BLM, CA, Desert Harvest Solar Project,
Construction, Operation, Maintenance, and Decommissioning of an 150-
megawatt Photovoltaic Solar Energy Facility and Generation-Intertie
Transmission Line, Consideration of Issuance of a Right-of-Way Grant,
Riverside County, CA, Review Period Ends: 12/03/2012, Contact: Frank
McMenimen 760-833-7150.
EIS No. 20120351, Final EIS, VCT, NM, Valles Caldera National Preserve
Public Access and Use Plan, Sandoval and Rio Arriba Counties, NM,
Review Period Ends: 12/05/2012, Contact: Marie Rodriguez 505-428-7728.
Dated: October 29, 2012.
Dawn R. Roberts,
Management Analyst, NEPA Compliance Division, Office of Federal
Activities.
[FR Doc. 2012-26876 Filed 11-1-12; 8:45 am]
BILLING CODE 6560-50-P