[Federal Register Volume 77, Number 210 (Tuesday, October 30, 2012)]
[Notices]
[Pages 65728-65729]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2012-26644]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[NRC-2011-0135]
Final Interim Staff Guidance Augmenting NUREG-1537, ``Guidelines
for Preparing and Reviewing Applications for the Licensing of Non-Power
Reactors,'' Parts 1 and 2, for Licensing Radioisotope Production
Facilities and Aqueous Homogeneous Reactors
AGENCY: Nuclear Regulatory Commission.
ACTION: Notice of availability.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or the Commission)
is issuing Final Interim Staff Guidance (ISG), that augments NUREG-
1537, Part 1, ``Guidelines for Preparing and Reviewing Applications for
the Licensing of Non-Power Reactors: Format and Content,'' and NUREG-
1537, Part 2, ``Guidelines for Preparing and Reviewing Applications for
the Licensing of Non-Power Reactors: Standard Review Plan and
Acceptance Criteria.'' Parts 1 and 2 of the ISG correspond to the parts
of NUREG-1537, and can be found in the NRC's Agencywide Documents
Access and Management System (ADAMS) at Accession Numbers ML12156A069
and ML12156A075, respectively. The ISG provides guidance for applicants
and the NRC staff related to licensing a heterogeneous or aqueous
homogeneous non-power reactor as a utilization facility pursuant to
Title 10 of the Code of Federal Regulations (10 CFR) Part 50,
``Domestic Licensing of Production and Utilization Facilities.'' The
ISG also provides guidance related to licensing a production facility
for the separation of byproduct material from special nuclear material
pursuant to 10 CFR Part 50. An applicant should use the guidance in
Part 1 of the ISG when preparing a construction permit or operating
license application. The NRC staff will use Part 2 of the ISG to review
such an application.
Disposition: On June 20, 2011 (76 FR 35922), the NRC published for
public comment the draft ISG, ``Staff Guidance Regarding the
Environmental Report for Applications to Construct and/or Operate
Medical Isotope Production Facilities'' (ADAMS Accession No.
ML11116A166). The NRC received 41 comments on the draft ISG, ADAMS
Accession Nos. ML11216A140, ML11220A263, and ML11217A018. On October
13, 2011 (76 FR 63668), the NRC published for public comment Chapters
1-6 of the draft ISG, that augments NUREG-1537, Part 1,
[[Page 65729]]
``Guidelines for Preparing and Reviewing Applications for the Licensing
of Non-Power Reactors: Format and Content'' (ADAMS Accession No.
ML111160058), and NUREG-1537, Part 2, ``Guidelines for Preparing and
Reviewing Applications for the Licensing of Non-Power Reactors:
Standard Review Plan and Acceptance Criteria'' (ADAMS Accession No.
ML111810010). On April 10, 2012 (77 FR 21592), the NRC published for
public comment Chapters 7-18 of Part 1 of the draft ISG, ADAMS
Accession No. ML111570224, and Chapters 7-18 of Part 2 of the draft
ISG, ADAMS Accession No. ML111160065. The NRC received 75 comments on
the draft ISG, ADAMS Accession Nos. ML11325A120, ML11325A121,
ML11325A122, ML12136A120, and ML12135A181. The details of the NRC's
disposition of the comments are available at ADAMS Accession No.
ML12156A061. The NRC staff incorporated the comments in the final ISG,
as appropriate.
Congressional Review Act: In accordance with the Congressional
Review Act, the NRC has determined that this action is not a major rule
and has verified this determination with the Office of Information and
Regulatory Affairs of the Office of Management and Budget.
ADDRESSES: The NRC maintains ADAMS, which provides text and image files
of the NRC's public documents. Publicly available documents created or
received at the NRC are available online in the NRC Library at http://www.nrc.gov/reading-rm/adams.html. Persons who do not have access to
ADAMS or who encounter problems in accessing the documents located in
ADAMS should contact the NRC's Public Document Room reference staff at
1-800-397-4209, 301-415-4737, or by email at [email protected].
FOR FURTHER INFORMATION CONTACT: Mr. Marcus Voth, Project Manager,
Research and Test Reactor Licensing Branch, Division of Policy and
Rulemaking, Office of Nuclear Reactor Regulation, U.S. Nuclear
Regulatory Commission, Washington, DC, 20555-0001; telephone at 301-
415-1210 or email at [email protected].
SUPPLEMENTARY INFORMATION: The NRC posts its issued staff guidance on
the NRC external Web page (http://www.nrc.gov/reading-rm/doc-collections/isg/).
Dated at Rockville, Maryland, this 17 day of October 2012.
For the Nuclear Regulatory Commission,
Linh N. Tran,
Acting Chief, Research and Test Reactor Licensing Branch, Division of
Policy and Rulemaking, Office of Nuclear Reactor Regulation.
[FR Doc. 2012-26644 Filed 10-29-12; 8:45 am]
BILLING CODE 7590-01-P