DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12756-003]
Application Ready for Environmental Analysis and Soliciting
Comments, Recommendations, Terms and Conditions, and Prescriptions;
BOST3 Hydroelectric, LLC
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Original Major License.
b. Project No.: P-12756-003.
c. Date filed: July 26, 2010.
[[Page 29627]]
d. Applicant: BOST3 Hydroelectric, LLC (BOST3).
e. Name of Project: Red River Lock & Dam No. 3 Hydroelectric
Project.
f. Location: The proposed project would be located at the existing
U.S. Army Corps of Engineer's (Corps) Red River Lock & Dam No. 3 on the
Red River, in Natchitoches Parish near the City of Colfax, Louisiana.
The proposed project would occupy 60.2 acres of land administered by
the Corps.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. Douglas A. Spalding, BOST3 Hydroelectric,
LLC, 8441 Wayzata Blvd., Suite 101, Golden Valley, MN 55426; (952) 544-
8133.
i. FERC Contact: Jeanne Edwards (202) 502-6181, or by email at
[email protected].
j. Deadline for filing comments, recommendations, terms and
conditions, and prescriptions: 60 days from the issuance date of this
notice; reply comments are due 105 days from the issuance date of this
notice.
All documents may be filed electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at [email protected], or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted and is now ready for
environmental analysis.
l. Project Description: The proposed project would utilize the
existing Corps Red River Lock and Dam No. 3, and operate consistent
with the Corps' current operating policy. The proposed project consists
of: (1) An excavated 635-foot-long headrace channel to convey water
from the upstream Pool No. 3 of the Red River to a 301-foot-long by 90-
foot-wide concrete powerhouse located southwest of the end of the
existing spillway, on the right (west) abutment of the Corps' Lock and
Dam No. 3; (2) an excavated 820-foot-long tailrace channel to discharge
water from the powerhouse to the downstream Pool No. 2 of the Red
River; (3) a 36.2-megawatt horizontal Kaplan bulb turbine/generator
unit; (4) a 8,400-foot-long, 13.2-kilovolt transmission line which
would connect to an existing Central Louisiana Electric Company
substation; and (5) appurtenant facilities. The proposed project would
generate about 172,779 megawatt-hours annually which would be sold to a
local utility.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at http://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
All filings must: (1) Bear in all capital letters the title
``COMMENTS'', ``REPLY COMMENTS'', ``RECOMMENDATIONS,'' ``TERMS AND
CONDITIONS,'' or ``PRESCRIPTIONS''; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person submitting the filing; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, recommendations, terms and conditions or prescriptions must
set forth their evidentiary basis and otherwise comply with the
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the
application directly from the applicant. Each filing must be
accompanied by proof of service on all persons listed on the service
list prepared by the Commission in this proceeding, in accordance with
18 CFR 4.34(b) and 385.2010.
You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Public notice of the filing of the initial development
application, which has already been given, established the due date for
filing competing applications or notices of intent. Under the
Commission's regulations, any competing development application must be
filed in response to and in compliance with public notice of the
initial development application. No competing applications or notices
of intent may be filed in response to this notice.
o. A license applicant must file no later than 60 days following
the date of issuance of this notice: (1) A copy of the water quality
certification; (2) a copy of the request for certification, including
proof of the date on which the certifying agency received the request;
or (3) evidence of waiver of water quality certification.
Dated: May 11, 2012.
Kimberly D. Bose,
Secretary.