[Federal Register Volume 77, Number 86 (Thursday, May 3, 2012)]
[Notices]
[Pages 26358-26359]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2012-10706]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Railroad Administration
[Docket Number FRA-2010-0028]
Petition for Waiver of Compliance
In accordance with Part 211 of Title 49 Code of Federal Regulations
(CFR), this document provides the public notice that by a document
dated February 16, 2012, CSX Transportation, Inc. (CSX) has petitioned
the Federal Railroad Administration (FRA) for a waiver of compliance
from certain provisions of the Federal railroad safety regulations
contained at 49 CFR part 236. FRA assigned the petition to Docket
Number FRA-2010-0028.
Pursuant to the requirements of 49 CFR Section 236.1035, Field
testing requirements, CSX has submitted the Interoperable Electronic
Train Management System[supreg] (I-ETMS) Positive Train Control (PTC)
Test Waiver Request, Version 1.0, dated February 16, 2012, along with
associated required documents for request of relief from select parts
of Subparts A-G. In conjunction with those requests, CSX test waiver
includes requests for relief from regulations other than that contained
in Subparts A-G.
I-ETMS is a vital overlay system as defined in 49 CFR part 236,
subpart I, Section 236.1015(e)(2) and fully described in the CSX I-ETMS
PTC Development Plan found in Appendix A, and for which FRA Type
Approval, FRA-TA-2011-02, was issued on August 26, 2011.
The I-ETMS system is designed to support different railroads and
their individual methods of operation, and is intended to be
implementable across a broad spectrum of railroads without significant
modification. This design approach supports interoperability across
railroads, as I-ETMS equipped locomotives apply consistent warning and
enforcement functionality regardless of trackage ownership.
CSX seeks a waiver of compliance from certain parts of 49 CFR
(Parts 216, Special Notice and Emergency Order Procedures: Railroad
Track, Locomotive and Equipment; Part 217, Railroad Operating Rules;
Part 218, Railroad Operating Practices; Part 229, Railroad Locomotive
Safety Standards; Part 233, Signal Systems Reporting Requirements; Part
235, Instructions Governing Applications for Approval of a
Discontinuance or Material Modification of a Signal System or Relief
from the Requirements of Part 236; and Part 240, Qualification and
Certification of Locomotive Engineers), under Section 211.51 (Tests),
to allow them to test I-ETMS on nonrevenue trains on the Aberdeen
Subdivision (between Raleigh and Hamlet, NC) from Southern Junction
(Milepost (MP) South 156.8) to Marston (MP South 241.6), and on the
Wilmington Subdivision (between Hamlet and Wilmington, NC) from NE East
Junction (MP Southeast 254.1) to end of main track (MP Southeast
354.0).
The following sections include the waiver request and
justification:
Section 216.13, Special notice for repairs--locomotive. A
waiver is requested for I-ETMS-equipped locomotives to the extent that
non-operation of I-ETMS equipment installed on board, whether through
malfunction or deactivation, shall not be construed as an unsafe
condition requiring special notice for repairs. A waiver is also sought
for non-I-ETMS-equipped locomotives operating in I-ETMS territory to
the extent that the absence of I-ETMS equipment on board shall not be
construed as an unsafe condition requiring special notice for repairs.
Justification: With or without I-ETMS equipment operating on board
the controlling locomotive, a train remains subject to existing
operating rules. I-ETMS tests require flexibility in installing,
removing, turning on, and turning off the equipment.
Section 217.9, Program of operational tests and
inspections--recordkeeping. A waiver is requested exempting operation
of I-ETMS equipment and procedures from the requirements for
operational tests and inspections, and associated recordkeeping.
Justification: During the I-ETMS test phase, procedures for using
I-ETMS equipment and functions will be refined and modified. Until such
procedures are defined in the PTC Safety Plan (PTCSP) and associated
documentation, they cannot be addressed in CSX Operating Rules. I-ETMS
is expected to have minimal impact on existing operating rules due to
its nature of overlay to existing methods of operation.
Section 217.11, Program of instruction on operating rules;
recordkeeping; electronic recordkeeping. A waiver is requested
exempting I-ETMS testing and its equipment and procedures from the
requirements for instruction and recordkeeping.
Justification: During the I-ETMS test phase, procedures for using
I-ETMS equipment and functions will be refined and modified. Until such
procedures are defined in the PTCSP and associated documentation, they
cannot be addressed in CSX Operating Rules. I-ETMS is expected to have
minimal impact on existing operating rules due to its nature of overlay
to existing methods of operation.
Part 218, Subpart D--Prohibition Against Tampering With
Safety Devices. A waiver is requested exempting onboard I-ETMS
equipment from the requirements of Sections 218.51, 218.53, 218.55,
218.57, 218.59, and 218.61 to the extent that I-ETMS equipment on board
a locomotive shall not be considered a ``safety device'' subject to the
provisions of this subpart at any time during the test and
demonstration phase.
Justification: I-ETMS tests and demonstrations require flexibility
in
[[Page 26359]]
installing, removing, turning on, and turning off the onboard
equipment.
Section 229.7, Prohibited acts. A waiver is requested for
both I-ETMS-equipped and non-I-ETMS-equipped locomotives operating in
the I-ETMS test territory during the test period.
Justification: Non-operation of I-ETMS equipment installed on board
a locomotive, whether through malfunction or deactivation, shall not be
construed as an unsafe condition subject to this section. Additionally,
in the absence of I-ETMS equipment on board, non-I-ETMS-equipped
locomotives operating in I-ETMS territory shall not be construed as an
unsafe condition subject to this regulation. The I-ETMS test program
requires flexibility in installing, removing, turning on, and turning
off the onboard equipment. Whether I-ETMS equipment on board a
locomotive is functioning, the train remains subject to the safety
provisions of the existing method of operation.
Section 229.135, Event recorders. A waiver is requested to
the extent that I-ETMS equipment on board a locomotive shall not be
considered an ``event recorder,'' subject to the provisions of this
section, during the test phase.
Justification: I-ETMS equipment by design will operate
intermittently during the test phase. The data accumulated by the
onboard I-ETMS equipment will be used to develop and refine I-ETMS
functions. Such data can be expected to contain anomalies that do not
reflect true operating conditions but, by analysis, will contribute to
achieving necessary objectives in the I-ETMS design.
Section 233.9, Annual reports. A waiver is requested
exempting I-ETMS operations in the test phase from the reporting
requirements of this section.
Justification: CSX recognizes that a revenue service I-ETMS system
is subject to the provisions of this section; however, imposition of
these requirements during the test and demonstration phase would be an
unnecessary paperwork burden. PTC testing should not affect the final
inventory of the CSX signal system, which will be included in the
Signal System Five-Year Report.
Section 235.5, Changes requiring filing of application. A
waiver is requested exempting I-ETMS from the requirements of this
section during the test phase.
Justification: I-ETMS tests require flexibility in installing,
removing, modifying, turning on, and turning off the I-ETMS equipment.
Section 240.127, Criteria for examining skill performance.
A waiver is requested exempting I-ETMS from the testing requirements
for qualification and certification of locomotive engineers during the
test phase.
Justification: Criteria and procedures for engineer performance
evaluation as related to I-ETMS do not yet exist; they will be
identified and defined during the I-ETMS test phase and included in the
PTCSP.
Section 240.129, Criteria for monitoring operational
performance of certified engineers. A waiver is requested exempting I-
ETMS from the performance monitoring procedures during the I-ETMS test
phase.
Justification: Criteria and procedures for I-ETMS monitoring the
performance of engineers using I-ETMS do not yet exist; they will be
identified and defined during the I-ETMS test phase and included in the
PTCSP.
In addition, CSX is requesting a waiver of compliance from certain
sections of 49 CFR Part 236 (Rules, Standards, and Instructions
Governing the Installation, Inspection, Maintenance, and Repair of
Signal and Train Control Systems, Devices, and Appliances) for
information only, and on which FRA is not receiving comments. Those
sections are: 236.11, Adjustment, repair, or replacement of component;
236.15, Timetable instructions; 236.23, Aspects and indications;
236.76, Tagging of wires and interference of wires or tags with signal
apparatus; 236.101, Purpose of inspection and tests; removal from
service of relay or device failing to meet test requirements; 236.109,
Time releases, timing relays and timing devices; 236.110, Results of
tests; 236.501, Forestalling device and speed control; 236.552,
Insulation resistance; requirement; 236.566, Locomotive of each train
operating in train stop, train control or cab signal territory;
equipped; 236.567, Restrictions imposed when device fails and/or is cut
out en route; 236.586, Daily or after trip test; 236.587, Departure
test; and 236.588, Periodic test.
A copy of the petition, as well as any written communications
concerning the petition, is available for review online at
www.regulations.gov and in person at the U.S. Department of
Transportation's (DOT) Docket Operations Facility, 1200 New Jersey
Avenue SE., W12-140, Washington, DC 20590. The Docket Operations
Facility is open from 9 a.m. to 5 p.m., Monday through Friday, except
Federal Holidays.
Interested parties are invited to participate in these proceedings
by submitting written views, data, or comments. FRA does not anticipate
scheduling a public hearing in connection with these proceedings since
the facts do not appear to warrant a hearing. If any interested party
desires an opportunity for oral comment, they should notify FRA, in
writing, before the end of the comment period and specify the basis for
their request.
All communications concerning these proceedings should identify the
appropriate docket number and may be submitted by any of the following
methods:
Web site: http://www.regulations.gov. Follow the online
instructions for submitting comments.
Fax: 202-493-2251.
Mail: Docket Operations Facility, U.S. Department of
Transportation, 1200 New Jersey Avenue SE., W12-140, Washington, DC
20590.
Hand Delivery: 1200 New Jersey Avenue SE., Room W12-140,
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday,
except Federal Holidays.
Communications received by June 18, 2012 will be considered by FRA
before final action is taken. Comments received after that date will be
considered as far as practicable.
Anyone is able to search the electronic form of any written
communications and comments received into any of our dockets by the
name of the individual submitting the comment (or signing the comment,
if submitted on behalf of an association, business, labor union, etc.).
You may review DOT's complete Privacy Act Statement in the Federal
Register published on April 11, 2000 (Volume 65, Number 70; Pages
19477-78), or online at http://www.dot.gov/privacy.html.
Issued in Washington, DC, on April 26, 2012.
Ron Hynes,
Acting Deputy Associate Administrator for Regulatory and Legislative
Operations.
[FR Doc. 2012-10706 Filed 5-2-12; 8:45 am]
BILLING CODE 4910-06-P