Drawbridge Operation Regulation; Anacostia River, Washington, DC
AGENCY: Coast Guard, DHS.
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard is changing the regulation that governs the
operation of the CSX Railroad Vertical Lift Bridge across the Anacostia
River, mile 3.4, at Washington, DC. The change will alter the eight
hour advance notice requirement for a bridge opening to a 48 hour
advance notice requirement for a bridge opening. The operating
regulation change gives more notice for trains and vessels to adjust
their schedules accordingly to ensure safe and efficient transits
across and under the bridge.
DATES: This rule is effective April 13, 2012.
ADDRESSES: Comments and related materials received from the public, as
well as documents mentioned in this preamble as being available in the
docket, are part of docket USCG-2011-0591 and are available online by
going to http://www.regulations.gov, inserting USCG-2011-0591 in the
``Keyword'' box, and then clicking ``Search.'' This material is also
available for inspection or copying at the Docket Management Facility
(M-30), U.S. Department of Transportation, West Building Ground Floor,
Room W12-140, 1200 New Jersey Avenue SE., Washington, DC 20590, between
9 a.m. and 5 p.m., Monday through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this proposed
rule, call or email Lindsey Middleton, Coast Guard; telephone 757-398-
6629, email [email protected]. If you have questions on
viewing or submitting material to the docket, call Renee V. Wright,
Program Manager, Docket Operations, telephone 202-366-9826.
SUPPLEMENTARY INFORMATION:
Regulatory Information
On August 23, 2011, we published a notice of proposed rulemaking
(NPRM) entitled Drawbridge Operation Regulation; Anacostia River,
Washington, DC in the Federal Register (76 FR 163). We did not receive
public comments on the proposed rule. No public meeting was requested,
and none was held.
Basis and Purpose
The CSX Railroad Company has requested a change in the operation
regulation for the CSX Railroad Vertical Lift Bridge, across the
Anacostia River, mile 3.4, at Washington, DC. The new 48 hour advance
notice requirement replaces the current eight hour advance notice
requirement for a bridge opening. This rail-line is used for regular
passenger service and train transits across this bridge on an average
of 21 times a day. As a result, it is necessary that ample time be
given to maintain an accurate schedule for trains and vessels for safe
and efficient travel across and under the bridge.
The current operating schedule for the bridge is set out in 33 CFR
117.253(b)(iv). The regulation was established in August 2004 and
allows the bridge to be operated from a remote location, the Benning
Yard office. The draw of the bridge shall open on signal under the
following circumstances; at all times for public vessels of the United
States, state and local government vessels, commercial vessels, and any
vessel in an emergency involving danger to life or property; from May
15 through September 30, between 9 a.m. and 12 p.m., and between 1 p.m.
and 6 p.m.; and from May 15 through September 30, between 6 p.m. and 7
p.m. if notice is given before 6 p.m. on the day for which the opening
is requested. At all other times, the bridge will open on signal if at
least eight hours of notice is given.
The vertical clearance of the bridge is 5 feet at Mean High Water
(MHW) in the closed position and 29 feet MHW in the open position.
There are on average, 21 train transits across this bridge everyday and
there have been two bridge openings in the past two years for vessels
taller than five feet.
Concurrent with the publication of the NPRM, a test deviation
[USCG-2011-0591] was issued to allow the CSX Railroad Bridge to test
the proposed schedule and to obtain data and public comments. The test
deviation allowed the bridge to open if at least 48 hours of notice is
given, replacing the eight hour notice requirement. The test deviation
continues to run until February 21, 2012.
The Coast Guard has reviewed bridge tender logs from before the
test deviation and during the first 120 days of the entire 180 day test
deviation. Before the deviation, the bridge had two bridge openings in
the last two years for vessels over five feet tall. During the first
120 days of the 180 day test deviation there were no requests for a
bridge opening.
The Coast Guard also reviewed the train logs before and during the
first 120 day period of the entire 180 day test deviation. In both
cases there was on average 21 train transits across this bridge daily.
Discussion of Comments and Changes
No comments were received on the proposed rule or the test
deviation and no changes were made to the proposed rule.
Regulatory Analyses
We developed this rule after considering numerous statutes and
executive orders related to rulemaking. Below we summarize our analyses
based on 13 of these statutes or executive orders.
Regulatory Planning and Review
This rule is not a significant regulatory action under section 3(f)
of Executive Order 12866, Regulatory
[[Page 14969]]
Planning and Review, and does not require an assessment of potential
costs and benefits under section 6(a)(3) of that Order. The Office of
Management and Budget has not reviewed it under that Order.
The rule change is expected to have only a minimal impact on
maritime traffic transiting under the bridge. The bridge will maintain
its current operating regulation except that where there is currently
an eight hour advance notice requirement for a bridge opening there
will be a 48 hour advance notice requirement. Mariners can plan their
trips in accordance with the scheduled bridge opening advance notice
requirement to minimize delay.
Small Entities
Under the Regulatory Flexibility Act (5 U.S.C. 601-612), we have
considered whether this rule would have a significant economic impact
on a substantial number of small entities. The term ``small entities''
comprises small businesses, not-for-profit organizations that are
independently owned and operated and are not dominant in their fields,
and governmental jurisdictions with populations of less than 50,000.
The Coast Guard certifies under 5 U.S.C. 605(b) that this rule will
not have a significant economic impact on a substantial number of small
entities.
This rule would affect the following entities, some of which might
be small entities: The owners or operators of vessels needing to
transit under the bridge between October 1 and May 14 at all times and
those needing to transit between the hours of 7 p.m. and 9 a.m. and
from 12 p.m. to 1 p.m. between May 15 and September 30.
This action will not have a significant impact on a substantial
number of small entities for the following reasons: The rule adds
minimal restrictions to the movement of waterway navigation by
requiring vessels that are not essential public vessels, vessels with
dangerous emergencies, or vessels transiting under the bridge at
specified excluded times to give 48 hours of notice when requesting a
bridge opening. Vessels that can safely transit under the bridge in the
closed position may do so at any time.
Assistance for Small Entities
Under section 213(a) of the Small Business Regulatory Enforcement
Fairness Act of 1996 (Pub. L. 104-121), in the NPRM (SNPRM) we offered
to assist small entities in understanding the rule so that they could
better evaluate its effects on them and participate in the rulemaking
process.
Collection of Information
This rule calls for no new collection of information under the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501-3520).
Federalism
A rule has implications for federalism under Executive Order 13132,
Federalism, if it has a substantial direct effect on State or local
governments and would either preempt State law or impose a substantial
direct cost of compliance on them. We have analyzed this rule under
that Order and have determined that it does not have implications for
federalism.
Unfunded Mandates Reform Act
The Unfunded Mandates Reform Act of 1995 (2 U.S.C. 1531-1538)
requires Federal agencies to assess the effects of their discretionary
regulatory actions. In particular, the Act addresses actions that may
result in the expenditure by a State, local, or tribal government, in
the aggregate, or by the private sector of $100,000,000 (adjusted for
inflation) or more in any one year. Though this rule will not result in
such an expenditure, we do discuss the effects of this rule elsewhere
in this preamble.
Taking of Private Property
This rule will not cause a taking of private property or otherwise
have taking implications under Executive Order 12630, Governmental
Actions and Interference with Constitutionally Protected Property
Rights.
Civil Justice Reform
This rule meets applicable standards in sections 3(a) and 3(b)(2)
of Executive Order 12988, Civil Justice Reform, to minimize litigation,
eliminate ambiguity, and reduce burden.
Protection of Children
We have analyzed this rule under Executive Order 13045, Protection
of Children from Environmental Health Risks and Safety Risks. This rule
is not an economically significant rule and would not create an
environmental risk to health or risk to safety that might
disproportionately affect children.
Indian Tribal Governments
This rule does not have tribal implications under Executive Order
13175, Consultation and Coordination with Indian Tribal Governments,
because it does not have a substantial direct effect on one or more
Indian tribes, on the relationship between the Federal Government and
Indian tribes, or on the distribution of power and responsibilities
between the Federal Government and Indian tribes.
Energy Effects
We have analyzed this rule under Executive Order 13211, Actions
Concerning Regulations That Significantly Affect Energy Supply,
Distribution, or Use. We have determined that it is not a ``significant
energy action'' under that order because it is not a ``significant
regulatory action'' under Executive Order 12866 and is not likely to
have a significant adverse effect on the supply, distribution, or use
of energy. The Administrator of the Office of Information and
Regulatory Affairs has not designated it as a significant energy
action. Therefore, it does not require a Statement of Energy Effects
under Executive Order 13211.
Technical Standards
The National Technology Transfer and Advancement Act (NTTAA) (15
U.S.C. 272 note) directs agencies to use voluntary consensus standards
in their regulatory activities unless the agency provides Congress,
through the Office of Management and Budget, with an explanation of why
using these standards would be inconsistent with applicable law or
otherwise impractical. Voluntary consensus standards are technical
standards (e.g., specifications of materials, performance, design, or
operation; test methods; sampling procedures; and related management
systems practices) that are developed or adopted by voluntary consensus
standards bodies.
This rule does not use technical standards. Therefore, we did not
consider the use of voluntary consensus standards.
Environment
We have analyzed this rule under Department of Homeland Security
Management Directive 023-01 and Commandant Instruction M16475.lD, which
guides the Coast Guard in complying with the National Environmental
Policy Act of 1969 (NEPA) (42 U.S.C. 4321-4370f), and have concluded
that this action is one of a category of actions which do not
individually or cumulatively have a significant effect on the human
environment. This rule is categorically excluded, under figure 2-1,
paragraph (32)(e), of the Instruction.
Under figure 2-1, paragraph (32)(e), of the Instruction, an
environmental analysis checklist and a categorical exclusion
determination are not required for this rule.
[[Page 14970]]
List of Subjects in 33 CFR Part 117
Bridges.
For the reasons discussed in the preamble, the Coast Guard amends
33 CFR part 117 as follows:
PART 117--DRAWBRIDGE OPERATION REGULATIONS
0
1. The authority citation for part 117 continues to read as follows:
Authority: 33 U.S.C. 499; 33 CFR 1.05-1; Department of Homeland
Security Delegation No. 0170.1.
0
2. In Sec. 117.253, revise paragraph (b)(1)(iv) to read as follows:
Sec. 117.253 Anacostia River.
* * * * *
(b) * * *
(1) * * *
(iv) At all other times, if at least 48 hours of notice is given to
the controller at the Benning Yard Office.
* * * * *