[Federal Register Volume 77, Number 24 (Monday, February 6, 2012)]
[Notices]
[Pages 5787-5788]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2012-2574]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2680-105]
Consumers Energy Company, Detroit Edison Company; Notice of
Application Accepted for Filing, Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Types of Application: Amendment of License.
b. Project No.: 2680-105.
c. Date Filed: December 16, 2011.
d. Applicants: Consumers Energy Company & Detroit Edison Company.
e. Name of Projects: Ludington Pumped Storage.
f. Location: On the shore of Lake Michigan in Mason County,
Michigan.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Mr. Robert M. Neustifter, Principal Attorney,
Consumers Energy Company, One Energy Plaza, Jackson, MI 49201. Tel:
(517) 788-2974.
i. FERC Contact: Mr. Vedula Sarma, (202) 502-6190,
[email protected].
j. Deadline for filing comments, motions to intervene, and
protests, is 30 days from the issuance date of this notice. All
documents may be filed electronically via the Internet. See, 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
at http://www.ferc.gov/docs-filing/efiling.asp. If unable to be filed
electronically, documents may be paper-filed. To paper-file, an
original and seven copies should be mailed to: Secretary, Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426. Commenters can submit brief comments up to 6,000 characters,
without prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and
contact information at the end of your comments.
Please include the project numbers (P-2680-105) on any comments,
motions, or recommendations filed.
k. Description of Request: The licensee proposes to upgrade and
overhaul all six pump-turbine/motor generating units of the Ludington
pumped storage project, one unit at a time over the period 2013 through
2019. The overhaul would increase the authorized installed and
hydraulic capacities of the project from 1,657.5 MW to 1,785 MW and
from 66,600 cfs to 76,290 cfs, respectively.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits
in the docket number field to access the document. You may also
register online at http://www.ferc.gov/docs-filing/esubscription.asp to
be notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-(866) 208-3676 or email
[email protected], for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must (1)
Bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis and otherwise comply with the requirements of 18 CFR
4.34(b). All comments, motions to intervene, or protests should relate
to project works which are the subject of the license surrender.
Agencies may obtain copies of the application directly from the
applicant. A copy of any protest or motion to intervene must be served
upon each representative of the applicant specified in the particular
application. If an intervener files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency. A copy of all other
filings in reference to this application must be accompanied by proof
of service on all persons listed in the service list prepared by the
Commission in this proceeding, in
[[Page 5788]]
accordance with 18 CFR 4.34(b) and 385.2010.
Dated: January 31, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-2574 Filed 2-3-12; 8:45 am]
BILLING CODE 6717-01-P