[Federal Register Volume 76, Number 177 (Tuesday, September 13, 2011)]
[Notices]
[Pages 56483-56488]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2011-23313]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[NRC-2011-0206]
Applications and Amendments to Facility Operating Licenses
Involving Proposed No Significant Hazards Considerations and Containing
Sensitive Unclassified Non-Safeguards Information and Order Imposing
Procedures for Access to Sensitive Unclassified Non-Safeguards
Information
AGENCY: Nuclear Regulatory Commission.
ACTION: Notice of license amendment request, opportunity to comment,
opportunity to request a hearing.
-----------------------------------------------------------------------
DATES: Comments must be filed by October 13, 2011. A request for a
hearing must be filed by November 14, 2011. Any potential party as
defined in Title 10 of the Code of Federal Regulations (10 CFR) 2.4 who
believes access to Sensitive Unclassified Non-Safeguards Information is
necessary to respond to this notice must request document access by
September 23, 2011.
ADDRESSES: Please include Docket ID NRC-2011-0206 in the subject line
of your comments. For additional instructions on submitting comments
and instructions on accessing documents related to this action, see
``Submitting Comments and Accessing Information'' in the SUPPLEMENTARY
INFORMATION section of this document. You may submit comments by any
one of the following methods:
Federal Rulemaking Web Site: Go to http://www.regulations.gov and search for documents filed under Docket ID NRC-
2011-0206. Address questions about NRC dockets to Carol Gallagher,
telephone: 301-492-3668; e-mail: [email protected].
Mail comments to: Cindy Bladey, Chief, Rules,
Announcements, and
[[Page 56484]]
Directives Branch (RADB), Office of Administration, Mail Stop: TWB-05-
B01M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
Fax comments to: RADB at 301-492-3446.
SUPPLEMENTARY INFORMATION:
Submitting Comments and Accessing Information
Comments submitted in writing or in electronic form will be posted
on the NRC Web site and on the Federal rulemaking Web site, http://www.regulations.gov. Because your comments will not be edited to remove
any identifying or contact information, the NRC cautions you against
including any information in your submission that you do not want to be
publicly disclosed.
The NRC requests that any party soliciting or aggregating comments
received from other persons for submission to the NRC inform those
persons that the NRC will not edit their comments to remove any
identifying or contact information, and therefore, they should not
include any information in their comments that they do not want
publicly disclosed.
You can access publicly available documents related to this
document using the following methods:
NRC's Public Document Room (PDR): The public may examine
and have copied, for a fee, publicly available documents at the NRC's
PDR, Room O1-F21, One White Flint North, 11555 Rockville Pike,
Rockville, Maryland 20852.
NRC's Agencywide Documents Access and Management System
(ADAMS): Publicly available documents created or received at the NRC
are available online in the NRC Library at http://www.nrc.gov/reading-rm/adams.html. From this page, the public can gain entry into ADAMS,
which provides text and image files of the NRC's public documents. If
you do not have access to ADAMS or if there are problems in accessing
the documents located in ADAMS, contact the NRC's PDR reference staff
at 1-800-397-4209, 301-415-4737, or by e-mail to [email protected].
Federal Rulemaking Web Site: Public comments and
supporting materials related to this notice can be found at http://www.regulations.gov by searching on Docket ID NRC-2011-0206.
Background
Pursuant to Section 189a.(2) of the Atomic Energy Act of 1954, as
amended (the Act), the U.S. Nuclear Regulatory Commission (the
Commission or NRC staff) is publishing this notice. The Act requires
the Commission publish notice of any amendments issued, or proposed to
be issued and grants the Commission the authority to issue and make
immediately effective any amendment to an operating license upon a
determination by the Commission that such amendment involves no
significant hazards consideration, notwithstanding the pendency before
the Commission of a request for a hearing from any person.
This notice includes notices of amendments containing sensitive
unclassified non-safeguards information (SUNSI).
Notice of Consideration of Issuance of Amendments to Facility Operating
Licenses, Proposed No Significant Hazards Consideration Determination,
and Opportunity for a Hearing
The Commission has made a proposed determination that the following
amendment requests involve no significant hazards consideration. Under
the Commission's regulations in Title 10 of the Code of Federal
Regulations (10 CFR) 50.92, this means that operation of the facility
in accordance with the proposed amendment would not (1) Involve a
significant increase in the probability or consequences of an accident
previously evaluated; (2) create the possibility of a new or different
kind of accident from any accident previously evaluated; or (3) involve
a significant reduction in a margin of safety. The basis for this
proposed determination for each amendment request is shown below.
The Commission is seeking public comments on this proposed
determination. Any comments received within 30 days after the date of
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendment until the
expiration of 60 days after the date of publication of this notice. The
Commission may issue the license amendment before expiration of the 60-
day period provided that its final determination is that the amendment
involves no significant hazards consideration. In addition, the
Commission may issue the amendment prior to the expiration of the 30-
day comment period should circumstances change during the 30-day
comment period such that failure to act in a timely way would result,
for example in derating or shutdown of the facility. Should the
Commission take action prior to the expiration of either the comment
period or the notice period, it will publish in the Federal Register a
notice of issuance. Should the Commission make a final No Significant
Hazards Consideration Determination, any hearing will take place after
issuance. The Commission expects that the need to take this action will
occur very infrequently.
Within 60 days after the date of publication of this notice, any
person(s) whose interest may be affected by this action may file a
request for a hearing and a petition to intervene with respect to
issuance of the amendment to the subject facility operating license.
Requests for a hearing and a petition for leave to intervene shall be
filed in accordance with the Commission's ''Rules of Practice for
Domestic Licensing Proceedings'' in 10 CFR part 2. Interested person(s)
should consult a current copy of 10 CFR 2.309, which is available at
the Commission's PDR, located at One White Flint North, Room O1-F21,
11555 Rockville Pike (first floor), Rockville, Maryland 20852. NRC
regulations are accessible electronically from the NRC Library on the
NRC Web site at http://www.nrc.gov/reading-rm/doc-collections/cfr/. If
a request for a hearing or petition for leave to intervene is filed
within 60 days, the Commission or a presiding officer designated by the
Commission or by the Chief Administrative Judge of the Atomic Safety
and Licensing Board Panel, will rule on the request and/or petition;
and the Secretary or the Chief Administrative Judge of the Atomic
Safety and Licensing Board will issue a notice of a hearing or an
appropriate order.
As required by 10 CFR 2.309, a petition for leave to intervene
shall set forth with particularity the interest of the petitioner in
the proceeding, and how that interest may be affected by the results of
the proceeding. The petition should specifically explain the reasons
why intervention should be permitted with particular reference to the
following general requirements: (1) The name, address, and telephone
number of the requestor or petitioner; (2) the nature of the
requestor's/petitioner's right under the Act to be made a party to the
proceeding; (3) the nature and extent of the requestor's/petitioner's
property, financial, or other interest in the proceeding; and (4) the
possible effect of any decision or order which may be entered in the
proceeding on the requestor's/petitioner's interest. The petition must
also set forth the specific contentions which the requestor/petitioner
seeks to have litigated at the proceeding.
Each contention must consist of a specific statement of the issue
of law or
[[Page 56485]]
fact to be raised or controverted. In addition, the requestor/
petitioner shall provide a brief explanation of the bases for the
contention and a concise statement of the alleged facts or expert
opinion which support the contention and on which the requestor/
petitioner intends to rely in proving the contention at the hearing.
The requestor/petitioner must also provide references to those specific
sources and documents of which the petitioner is aware and on which the
requestor/petitioner intends to rely to establish those facts or expert
opinion. The petition must include sufficient information to show that
a genuine dispute exists with the applicant on a material issue of law
or fact. Contentions shall be limited to matters within the scope of
the amendment under consideration. The contention must be one which, if
proven, would entitle the requestor/petitioner to relief. A requestor/
petitioner who fails to satisfy these requirements with respect to at
least one contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene,
and have the opportunity to participate fully in the conduct of the
hearing.
If a hearing is requested, and the Commission has not made a final
determination on the issue of no significant hazards consideration, the
Commission will make a final determination on the issue of no
significant hazards consideration. The final determination will serve
to decide when the hearing is held. If the final determination is that
the amendment request involves no significant hazards consideration,
the Commission may issue the amendment and make it immediately
effective, notwithstanding the request for a hearing. Any hearing held
would take place after issuance of the amendment. If the final
determination is that the amendment request involves a significant
hazards consideration, any hearing held would take place before the
issuance of any amendment.
All documents filed in NRC adjudicatory proceedings, including a
request for hearing, a petition for leave to intervene, any motion or
other document filed in the proceeding prior to the submission of a
request for hearing or petition to intervene, and documents filed by
interested governmental entities participating under 10 CFR 2.315(c),
must be filed in accordance with the NRC E-Filing rule (72 FR 49139,
August 28, 2007). The E-Filing process requires participants to submit
and serve all adjudicatory documents over the internet, or in some
cases to mail copies on electronic storage media. Participants may not
submit paper copies of their filings unless they seek an exemption in
accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least 10
days prior to the filing deadline, the participant should contact the
Office of the Secretary by e-mail at [email protected], or by
telephone at 1-301-415-1677, to request (1) a digital identification
(ID) certificate, which allows the participant (or its counsel or
representative) to digitally sign documents and access the E-Submittal
server for any proceeding in which it is participating; and (2) advise
the Secretary that the participant will be submitting a request or
petition for hearing (even in instances in which the participant, or
its counsel or representative, already holds an NRC-issued digital ID
certificate). Based upon this information, the Secretary will establish
an electronic docket for the hearing in this proceeding if the
Secretary has not already established an electronic docket.
Information about applying for a digital ID certificate is
available on NRC's public Web site at http://www.nrc.gov/site-help/e-submittals/apply-certificates.html. System requirements for accessing
the E-Submittal server are detailed in NRC's ``Guidance for Electronic
Submission,'' which is available on the agency's public Web site at
http://www.nrc.gov/site-help/e-submittals.html. Participants may
attempt to use other software not listed on the Web site, but should
note that the NRC's E-Filing system does not support unlisted software,
and the NRC Meta System Help Desk will not be able to offer assistance
in using unlisted software.
If a participant is electronically submitting a document to the NRC
in accordance with the E-Filing rule, the participant must file the
document using the NRC's online, Web-based submission form. In order to
serve documents through the Electronic Information Exchange System,
users will be required to install a Web browser plug-in from the NRC
Web site. Further information on the Web-based submission form,
including the installation of the Web browser plug-in, is available on
the NRC's public Web site at http://www.nrc.gov/site-help/e-submittals.html.
Once a participant has obtained a digital ID certificate and a
docket has been created, the participant can then submit a request for
hearing or petition for leave to intervene. Submissions should be in
Portable Document Format (PDF) in accordance with NRC guidance
available on the NRC public Web site at http://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the time the
documents are submitted through the NRC's E-Filing system. To be
timely, an electronic filing must be submitted to the E-Filing system
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of
a transmission, the E-Filing system time-stamps the document and sends
the submitter an e-mail notice confirming receipt of the document. The
E-Filing system also distributes an e-mail notice that provides access
to the document to the NRC Office of the General Counsel and any others
who have advised the Office of the Secretary that they wish to
participate in the proceeding, so that the filer need not serve the
documents on those participants separately. Therefore, applicants and
other participants (or their counsel or representative) must apply for
and receive a digital ID certificate before a hearing request/petition
to intervene is filed so that they can obtain access to the document
via the E-Filing system.
A person filing electronically using the agency's adjudicatory E-
Filing system may seek assistance by contacting the NRC Meta System
Help Desk through the ``Contact Us'' link located on the NRC Web site
at http://www.nrc.gov/site-help/e-submittals.html, by e-mail at
[email protected], or by a toll-free call at 1-866-672-7640. The
NRC Meta System Help Desk is available between 8 a.m. and 8 p.m.,
Eastern Time, Monday through Friday, excluding government holidays.
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, Sixteenth
Floor, One White Flint North, 11555 Rockville Pike, Rockville,
Maryland, 20852, Attention: Rulemaking and Adjudications Staff.
Participants filing a document in this manner are responsible for
serving the
[[Page 56486]]
document on all other participants. Filing is considered complete by
first-class mail as of the time of deposit in the mail, or by courier,
express mail, or expedited delivery service upon depositing the
document with the provider of the service. A presiding officer, having
granted an exemption request from using E-Filing, may require a
participant or party to use E-Filing if the presiding officer
subsequently determines that the reason for granting the exemption from
use of E-Filing no longer exists.
Documents submitted in adjudicatory proceedings will appear in
NRC's electronic hearing docket which is available to the public at
http://ehd1.nrc.gov/EHD/, unless excluded pursuant to an order of the
Commission, or the presiding officer. Participants are requested not to
include personal privacy information, such as social security numbers,
home addresses, or home phone numbers in their filings, unless an NRC
regulation or other law requires submission of such information. With
respect to copyrighted works, except for limited excerpts that serve
the purpose of the adjudicatory filings and would constitute a Fair Use
application, participants are requested not to include copyrighted
materials in their submission.
Petitions for leave to intervene must be filed no later than 60
days from the date of publication of this notice. Non-timely filings
will not be entertained absent a determination by the presiding officer
that the petition or request should be granted or the contentions
should be admitted, based on a balancing of the factors specified in 10
CFR 2.309(c)(1)(i)-(viii).
For further details with respect to this amendment action, see the
application for amendment which is available for public inspection at
the Commission's PDR, located at One White Flint North, Room O1-F21,
11555 Rockville Pike (first floor), Rockville, Maryland 20852. Publicly
available documents created or received at the NRC are accessible
electronically through ADAMS in the NRC Library at http://www.nrc.gov/reading-rm/adams.html. If you do not have access to ADAMS or if there
are problems in accessing the documents located in ADAMS, contact the
PDR Reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to
[email protected].
Carolina Power & Light Company, et al., Docket No. 50-400, Shearon
Harris Nuclear Power Plant, Unit 1, Wake and Chatham Counties, North
Carolina
Date of amendment request: April 28, 2011, as supplemented June 23,
2011.
Description of amendment request: This amendment request contains
sensitive unclassified non-safeguards information. The proposed
amendment will increase the rated thermal power (RTP) level from 2900
megawatts thermal (MWt) to 2948 MWt, and make technical specification
changes as necessary to support operation at the uprated power level.
The proposed change is an increase in RTF of approximately 1.66
percent. The proposed uprate is characterized as a measurement
uncertainty recapture using the Cameron Leading Edge Flow Meter
CheckPlus System to improve plant calorimetric heat balance measurement
accuracy.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed change involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed change will increase the Shearon Harris Nuclear
Power Plant, Unit No. 1 (HNP) rated thermal power (RTP) from 2900
megawatts thermal (MWt) to 2948 MWt. Nuclear steam supply system and
balance-of-plant systems, components and analyses that could be
affected by the proposed change in RTP were evaluated using revised
design parameters. The evaluations determined that these structures,
systems and components are capable of performing their design
function at the proposed uprated RTP of 2948 MWt. An evaluation of
the accident analyses demonstrated that the applicable analysis
acceptance criteria are still met with the proposed changes. Power
level is an input assumption to equipment design and accident
analyses, but it is not a transient or accident initiator. Accident
initiators are not affected by the power uprate, and plant safety
barrier challenges are not created by the proposed changes.
The radiological consequences of operation at the uprated power
conditions have been assessed. The proposed change in RTP does not
affect release paths, frequency of release, or the analyzed source
term for any accidents previously evaluated in the HNP Final Safety
Analysis Report. Structures, systems and components required to
mitigate transients are capable of performing their design functions
with the proposed changes, and are thus acceptable. Analyses
performed to assess the effects of mass and energy releases remain
valid. The source term used to assess radiological consequences was
reviewed and determined to bound operation at the proposed power
level.
Therefore, the proposed change does not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed change create the possibility of a new or
different kind of accident from any accident previously evaluated?
Response: No.
No new accident scenarios, failure mechanisms, or single
failures are introduced as a result of any proposed changes. The
ultrasonic flow meter has been analyzed, and system failures will
not adversely affect any safety-related system or any structures,
systems or components required for transient mitigation. Structures,
systems and components previously required for transient mitigation
are still capable of fulfilling their intended design functions. The
proposed changes have no significant adverse affect [effect] on any
safety-related structures, systems or components and do not
significantly change the performance or integrity of any safety-
related system.
The proposed changes do not adversely affect any current system
interfaces or create any new interfaces that could result in an
accident or malfunction of a different kind than previously
evaluated. Plant operation at a RTP of 2948 MWt does not create any
new accident initiators or precursors. Credible malfunctions are
bounded by the current accident analyses of record or recent
evaluations demonstrating that applicable criteria are still met
with the proposed changes.
Therefore, this change does not create the possibility of a new
or different kind of accident from any accident previously
evaluated.
3. Does the proposed change involve a significant reduction in a
margin of safety?
Response: No.
The margins of safety associated with the power uprate are those
pertaining to core thermal power. These include fuel cladding,
reactor coolant pressure boundary, and containment barriers. Core
analyses demonstrate that power uprate implementation will continue
to meet the current nuclear design basis. Impacts to components
associated with the reactor coolant system pressure boundary
structural integrity, and factors such as pressure-temperature
limits, vessel fluence, and pressurized thermal shock were evaluated
and determined to be acceptable at the uprate power level.
Systems will continue to operate within their design parameters
and remain capable of performing their intended safety functions
following power uprate implementation. The current HNP safety
analyses, including the design basis radiological accident dose
calculations, bound the power uprate.
Therefore, this change does not involve a significant reduction
in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
[[Page 56487]]
proposes to determine that the amendment request involves no
significant hazards consideration.
Attorney for licensee: David T. Conley, Associate General Counsel
II--Legal Department, Progress Energy Service Company, LLC, Post Office
Box 1551, Raleigh, North Carolina 27602.
NRC Branch Chief: Douglas A. Broaddus.
Order Imposing Procedures for Access to Sensitive Unclassified Non-
Safeguards Information for Contention Preparation; Carolina Power &
Light Company, et al., Docket No. 50-400, Shearon Harris Nuclear Power
Plant, Unit 1, Wake and Chatham Counties, North Carolina
A. This Order contains instructions regarding how potential parties
to this proceeding may request access to documents containing Sensitive
Unclassified Non-Safeguards Information (SUNSI).
B. Within 10 days after publication of this notice of hearing and
opportunity to petition for leave to intervene, any potential party who
believes access to SUNSI is necessary to respond to this notice may
request such access. A ``potential party'' is any person who intends to
participate as a party by demonstrating standing and filing an
admissible contention under 10 CFR 2.309. Requests for access to SUNSI
submitted later than 10 days after publication will not be considered
absent a showing of good cause for the late filing, addressing why the
request could not have been filed earlier.
C. The requestor shall submit a letter requesting permission to
access SUNSI to the Office of the Secretary, U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, Attention: Rulemakings and
Adjudications Staff, and provide a copy to the Associate General
Counsel for Hearings, Enforcement and Administration, Office of the
General Counsel, Washington, DC 20555-0001. The expedited delivery or
courier mail address for both offices is: U.S. Nuclear Regulatory
Commission, 11555 Rockville Pike, Rockville, Maryland 20852. The e-mail
address for the Office of the Secretary and the Office of the General
Counsel are [email protected] and [email protected],
respectively.\1\ The request must include the following information:
---------------------------------------------------------------------------
\1\ While a request for hearing or petition to intervene in this
proceeding must comply with the filing requirements of the NRC's
``E-Filing Rule,'' the initial request to access SUNSI under these
procedures should be submitted as described in this paragraph.
---------------------------------------------------------------------------
(1) A description of the licensing action with a citation to this
Federal Register notice;
(2) The name and address of the potential party and a description
of the potential party's particularized interest that could be harmed
by the action identified in C.(1); and
(3) The identity of the individual or entity requesting access to
SUNSI and the requestor's basis for the need for the information in
order to meaningfully participate in this adjudicatory proceeding. In
particular, the request must explain why publicly-available versions of
the information requested would not be sufficient to provide the basis
and specificity for a proffered contention.
D. Based on an evaluation of the information submitted under
paragraph C.(3) the NRC staff will determine within 10 days of receipt
of the request whether:
(1) There is a reasonable basis to believe the petitioner is likely
to establish standing to participate in this NRC proceeding; and
(2) The requestor has established a legitimate need for access to
SUNSI.
E. If the NRC staff determines that the requestor satisfies both
D.(1) and D.(2) above, the NRC staff will notify the requestor in
writing that access to SUNSI has been granted. The written notification
will contain instructions on how the requestor may obtain copies of the
requested documents, and any other conditions that may apply to access
to those documents. These conditions may include, but are not limited
to, the signing of a Non-Disclosure Agreement or Affidavit, or
Protective Order \2\ setting forth terms and conditions to prevent the
unauthorized or inadvertent disclosure of SUNSI by each individual who
will be granted access to SUNSI.
---------------------------------------------------------------------------
\2\ Any motion for Protective Order or draft Non-Disclosure
Affidavit or Agreement for SUNSI must be filed with the presiding
officer or the Chief Administrative Judge if the presiding officer
has not yet been designated, within 30 days of the deadline for the
receipt of the written access request.
---------------------------------------------------------------------------
F. Filing of Contentions. Any contentions in these proceedings that
are based upon the information received as a result of the request made
for SUNSI must be filed by the requestor no later than 25 days after
the requestor is granted access to that information. However, if more
than 25 days remain between the date the petitioner is granted access
to the information and the deadline for filing all other contentions
(as established in the notice of hearing or opportunity for hearing),
the petitioner may file its SUNSI contentions by that later deadline.
G. Review of Denials of Access.
(1) If the request for access to SUNSI is denied by the NRC staff
either after a determination on standing and need for access, or after
a determination on trustworthiness and reliability, the NRC staff shall
immediately notify the requestor in writing, briefly stating the reason
or reasons for the denial.
(2) The requestor may challenge the NRC staff's adverse
determination by filing a challenge within 5 days of receipt of that
determination with: (a) the presiding officer designated in this
proceeding; (b) if no presiding officer has been appointed, the Chief
Administrative Judge, or if he or she is unavailable, another
administrative judge, or an administrative law judge with jurisdiction
pursuant to 10 CFR 2.318(a); or (c) if another officer has been
designated to rule on information access issues, with that officer.
H. Review of Grants of Access. A party other than the requestor may
challenge an NRC staff determination granting access to SUNSI whose
release would harm that party's interest independent of the proceeding.
Such a challenge must be filed with the Chief Administrative Judge
within 5 days of the notification by the NRC staff of its grant of
access.
If challenges to the NRC staff determinations are filed, these
procedures give way to the normal process for litigating disputes
concerning access to information. The availability of interlocutory
review by the Commission of orders ruling on such NRC staff
determinations (whether granting or denying access) is governed by 10
CFR 2.311.\3\
---------------------------------------------------------------------------
\3\ Requestors should note that the filing requirements of the
NRC's E-Filing Rule (72 FR 49139; August 28, 2007) apply to appeals
of NRC staff determinations (because they must be served on a
presiding officer or the Commission, as applicable), but not to the
initial SUNSI request submitted to the NRC staff under these
procedures.
---------------------------------------------------------------------------
I. The Commission expects that the NRC staff and presiding officers
(and any other reviewing officers) will consider and resolve requests
for access to SUNSI, and motions for protective orders, in a timely
fashion in order to minimize any unnecessary delays in identifying
those petitioners who have standing and who have propounded contentions
meeting the specificity and basis requirements in 10 CFR Part 2.
Attachment 1 to this Order summarizes the general target schedule for
processing and resolving requests under these procedures.
It is so ordered.
[[Page 56488]]
Dated at Rockville, Maryland, this 7th day of September 2011.
For the Nuclear Regulatory Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.
ATTACHMENT 1--General Target Schedule for Processing and Resolving
Requests for Access to Sensitive Unclassified Non-Safeguards
Information in this Proceeding
------------------------------------------------------------------------
Day Event/activity
------------------------------------------------------------------------
0................................. Publication of Federal Register
notice of hearing and opportunity
to petition for leave to intervene,
including order with instructions
for access requests.
10................................ Deadline for submitting requests for
access to Sensitive Unclassified
Non-Safeguards Information (SUNSI)
with information: supporting the
standing of a potential party
identified by name and address;
describing the need for the
information in order for the
potential party to participate
meaningfully in an adjudicatory
proceeding.
60................................ Deadline for submitting petition for
intervention containing: (i)
Demonstration of standing; (ii) all
contentions whose formulation does
not require access to SUNSI (+25
Answers to petition for
intervention; +7 requestor/
petitioner reply).
20................................ Nuclear Regulatory Commission (NRC)
staff informs the requestor of the
staff's determination whether the
request for access provides a
reasonable basis to believe
standing can be established and
shows need for SUNSI. (NRC staff
also informs any party to the
proceeding whose interest
independent of the proceeding would
be harmed by the release of the
information.) If NRC staff makes
the finding of need for SUNSI and
likelihood of standing, NRC staff
begins document processing
(preparation of redactions or
review of redacted documents).
25................................ If NRC staff finds no ``need'' or no
likelihood of standing, the
deadline for requestor/petitioner
to file a motion seeking a ruling
to reverse the NRC staff's denial
of access; NRC staff files copy of
access determination with the
presiding officer (or Chief
Administrative Judge or other
designated officer, as
appropriate). If NRC staff finds
``need'' for SUNSI, the deadline
for any party to the proceeding
whose interest independent of the
proceeding would be harmed by the
release of the information to file
a motion seeking a ruling to
reverse the NRC staff's grant of
access.
30................................ Deadline for NRC staff reply to
motions to reverse NRC staff
determination(s).
40................................ (Receipt +30) If NRC staff finds
standing and need for SUNSI,
deadline for NRC staff to complete
information processing and file
motion for Protective Order and
draft Non-Disclosure Affidavit.
Deadline for applicant/licensee to
file Non-Disclosure Agreement for
SUNSI.
A................................. If access granted: Issuance of
presiding officer or other
designated officer decision on
motion for protective order for
access to sensitive information
(including schedule for providing
access and submission of
contentions) or decision reversing
a final adverse determination by
the NRC staff.
A + 3............................. Deadline for filing executed Non-
Disclosure Affidavits. Access
provided to SUNSI consistent with
decision issuing the protective
order.
A + 28............................ Deadline for submission of
contentions whose development
depends upon access to SUNSI.
However, if more than 25 days
remain between the petitioner's
receipt of (or access to) the
information and the deadline for
filing all other contentions (as
established in the notice of
hearing or opportunity for
hearing), the petitioner may file
its SUNSI contentions by that later
deadline.
A + 53............................ (Contention receipt +25) Answers to
contentions whose development
depends upon access to SUNSI.
A + 60............................ (Answer receipt +7) Petitioner/
Intervenor reply to answers.
>A + 60........................... Decision on contention admission.
------------------------------------------------------------------------
[FR Doc. 2011-23313 Filed 9-12-11; 8:45 am]
BILLING CODE 7590-01-P