NUCLEAR REGULATORY COMMISSION
[Docket No. 50-261, 72-3 and 72-60; NRC-2011-0201]
Carolina Power & Light; H.B. Robinson Steam Electric Plant, Unit
No. 2; HBRSEP Independent Spent Fuel Storage Installations; Notice of
Consideration of Approval of Application for Indirect License Transfer
Resulting From the Proposed Merger Between Progress Energy, Inc. and
Duke Energy Corporation, and Opportunity for Hearing
AGENCY: Nuclear Regulatory Commission.
ACTION: Notice of request for indirect license transfer, opportunity to
comment, opportunity to request a hearing.
-----------------------------------------------------------------------
DATES: Comments must be filed by September 30, 2011. A request for a
hearing must be filed by September 20, 2011.
ADDRESSES: Please include Docket ID NRC-2011-0201 in the subject line
of your comments. For additional instructions on submitting comments
and instructions on accessing documents related to this action, see
``Submitting Comments and Accessing Information'' in the SUPPLEMENTARY
INFORMATION section of this document. You may submit comments by any
one of the following methods:
Federal Rulemaking Web Site: Go to http://www.regulations.gov and search for documents filed under Docket ID NRC-
2011-0201. Address questions about NRC dockets to Carol Gallagher,
telephone: 301-492-3668; e-mail: [email protected].
Mail comments to: Cindy Bladey, Chief, Rules,
Announcements, and Directives Branch (RADB), Office of Administration,
Mail Stop: TWB-05-B01M, U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001.
Fax comments to: RADB at 301-492-3446.
SUPPLEMENTARY INFORMATION:
Submitting Comments and Accessing Information
Comments submitted in writing or in electronic form will be posted
on the NRC Web site and on the Federal rulemaking Web site, http://www.regulations.gov. Because your comments will not be edited to remove
any identifying or contact information, the NRC cautions you against
including any information in your submission that you do not want to be
publicly disclosed.
The NRC requests that any party soliciting or aggregating comments
received from other persons for submission to the NRC inform those
persons that the NRC will not edit their comments to remove any
identifying or contact information, and therefore, they should not
include any information in their comments that they do not want
publicly disclosed.
You can access publicly available documents related to this
document using the following methods:
NRC's Public Document Room (PDR): The public may examine
and have copied, for a fee, publicly available documents at the NRC's
PDR, O1-F21, One White Flint North, 11555 Rockville Pike, Rockville,
Maryland 20852.
[[Page 54262]]
NRC's Agencywide Documents Access and Management System
(ADAMS): Publicly available documents created or received at the NRC
are available online in the NRC Library at http://www.nrc.gov/reading-rm/adams.html. From this page, the public can gain entry into ADAMS,
which provides text and image files of the NRC's public documents. If
you do not have access to ADAMS or if there are problems in accessing
the documents located in ADAMS, contact the NRC's PDR reference staff
at 1-800-397-4209, 301-415-4737, or by e-mail to [email protected].
The application dated March 30, 2011, is available electronically under
ADAMS Accession No. ML11110A031.
Federal Rulemaking Web Site: Public comments and
supporting materials related to this notice can be found at http://www.regulations.gov by searching on Docket ID NRC-2011-0201.
FOR FURTHER INFORMATION CONTACT: Farideh E. Saba, Senior Project
Manager, Plant Licensing Branch 2-2, Division of Operating Reactor
Licensing, Office of Nuclear Reactor Regulation, U.S. Nuclear
Regulatory Commission, Washington, DC 20555. Telephone: 301-415-1447;
fax number: 301-415-2102; e-mail: [email protected].
The Commission is considering the issuance of an order under Title
10 of August 31, 2011 (10 CFR) 50.80 and 72.50 approving the indirect
transfer of the Renewed Facility Operating License No. DPR-23 for H.B.
Robinson Steam Electric Plant (Robinson) Unit No. 2, including the
Robinson Independent Spent Fuel Storage Installation (ISFSI), and the
Robinson ISFSI with Renewed Material License No. SNM-2502, currently
held by Carolina Power & Light Company, as owner and licensed operator.
According to the application for approval dated March 30, 2011,
filed by Carolina Power & Light Company (CP&L, the licensee), Progress
Energy, Inc. (Progress Energy, the licensee's current ultimate parent
corporation) seeks approval pursuant to 10 CFR 50.80 for indirect
transfer of control of Robinson 2, including the Robinson ISFSI, and
pursuant to 10 CFR 72.50 for Robinson ISFSI, along with Brunswick Steam
and Electric Plant (BSEP), Units 1 and 2, BSEP Independent Spent Fuel
Storage Installation, Shearon Harris Nuclear Power Plant, Unit 1, and
Crystal River Unit 3 Nuclear Generating Plant. Progress Energy would
merge with Duke Energy Corporation (Duke Energy). The merged company
would become the ultimate parent of the current licensee. CP&L will
continue to own and operate the licensed facility in accordance with
the Licenses.
According to the application, under the terms of the Merger
Agreement, Diamond Acquisition Corporation (Merger Sub), a wholly owned
direct subsidiary of Duke Energy, will merge with and into Progress
Energy. Progress Energy will become a wholly owned direct subsidiary of
Duke Energy and the former shareholders of Progress Energy will become
shareholders of Duke Energy. The current licensee will remain a wholly
owned subsidiary of Progress Energy and will continue to operate the
Robinson facility.
According to the application, it is anticipated that Duke Energy
shareholders will own approximately 63 percent of the combined company
and Progress Energy shareholders will own approximately 37 percent of
the combined company on a fully diluted basis.
According to the application, when the transaction is completed,
Duke Energy will have an eighteen-member board of directors. All eleven
current directors of Duke Energy will continue as directors when the
transaction is complete, subject to their ability and willingness to
serve. Progress Energy, after consultation with Duke Energy, designated
seven of the current directors of Progress Energy to be added to the
board of directors of Duke Energy when the transaction is complete,
similarly subject to their ability and willingness to serve.
According to the application, the technical qualifications of the
licensee are not affected by the proposed indirect transfers of control
of the Robinson licenses. The current licensee will at all times remain
the licensed operator of Robinson. No conforming amendments will be
required to the facility operating license or the site-specific ISFSI
license as a result of the proposed transaction. The nuclear operating
organization for the licensed facility is expected to remain
essentially unchanged as a result of the acquisition. Specifically, the
proposed indirect transfers of control will not result in any change in
the role of the CP&L as the licensed operator of the licensed facility
and will not result in any changes to its financial qualifications,
decommissioning funding assurance, or technical qualifications. CP&L
will retain the requisite qualifications to own and operate the
licensed facility.
No physical changes to the above listed facilities or operational
changes are being proposed in the application.
Pursuant to 10 CFR 50.80, no license, or any right thereunder,
shall be transferred, directly or indirectly, through transfer of
control of the license, unless the Commission shall give its consent in
writing. The Commission will approve an application for the indirect
transfer of a license, if the Commission determines that the proposed
merger will not affect the qualifications of the licensee to hold the
license, and that the transfer is otherwise consistent with applicable
provisions of law, regulations, and orders issued by the Commission
pursuant thereto.
The filing of requests for hearing and petitions for leave to
intervene, and written comments with regard to the license transfer
application, are discussed below.
Within 20 days from the date of publication of this notice, any
person(s) whose interest may be affected by the Commission's action on
the application may request a hearing and intervention via electronic
submission through the NRC E-Filing system. Requests for a hearing and
petitions for leave to intervene should be filed in accordance with the
Commission's rules of practice set forth in Subpart C ``Rules of
General Applicability: Hearing Requests, Petitions to Intervene,
Availability of Documents, Selection of Specific Hearing Procedures,
Presiding Officer Powers, and General Hearing Management for NRC
Adjudicatory Hearings,'' of 10 CFR Part 2. In particular, such requests
and petitions must comply with the requirements set forth in 10 CFR
2.309. Untimely requests and petitions may be denied, as provided in 10
CFR 2.309(c)(1), unless good cause for failure to file on time is
established. In addition, an untimely request or petition should
address the factors that the Commission will also consider, in
reviewing untimely requests or petitions, set forth in 10 CFR
2.309(c)(1)(i)-(viii). NRC regulations are accessible electronically
from the NRC Library on the NRC Web site at http://www.nrc.gov/reading-rm/doc-collections/cfr/.
All documents filed in NRC adjudicatory proceedings, including a
request for hearing, a petition for leave to intervene, any motion or
other document filed in the proceeding prior to the submission of a
request for hearing or petition to intervene, and documents filed by
interested governmental entities participating under 10 CFR 2.315(c),
must be filed in accordance with the NRC E-Filing rule (72 FR 49139,
August 28, 2007). The E-Filing process requires participants to submit
and serve all adjudicatory documents over the Internet, or in some
cases to mail copies on electronic
[[Page 54263]]
storage media. Participants may not submit paper copies of their
filings unless they seek an exemption in accordance with the procedures
described below.
To comply with the procedural requirements of E-Filing, at least 10
days prior to the filing deadline, the participant should contact the
Office of the Secretary by e-mail at [email protected], or by
telephone at 301-415-1677, to request (1) a digital ID certificate,
which allows the participant (or its counsel or representative) to
digitally sign documents and access the E-Submittal server for any
proceeding in which it is participating; and (2) advise the Secretary
that the participant will be submitting a request or petition for
hearing (even in instances in which the participant, or its counsel or
representative, already holds an NRC-issued digital ID certificate).
Based upon this information, the Secretary will establish an electronic
docket for the hearing in this proceeding if the Secretary has not
already established an electronic docket.
Information about applying for a digital ID certificate is
available on NRC's public Web site at http://www.nrc.gov/site-help/e-submittals/apply-certificates.html. System requirements for accessing
the E-Submittal server are detailed in NRC's ``Guidance for Electronic
Submission,'' which is available on the agency's public Web site at
http://www.nrc.gov/site-help/e-submittals.html. Participants may
attempt to use other software not listed on the Web site, but should
note that the NRC's E-Filing system does not support unlisted software,
and the NRC Meta System Help Desk will not be able to offer assistance
in using unlisted software.
If a participant is electronically submitting a document to the NRC
in accordance with the E-Filing rule, the participant must file the
document using the NRC's online, Web-based submission form. In order to
serve documents through Electronic Information Exchange, users will be
required to install a Web browser plug-in from the NRC Web site.
Further information on the Web-based submission form, including the
installation of the Web browser plug-in, is available on the NRC's
public Web site at http://www.nrc.gov/site-help/e-submittals.html.
Once a participant has obtained a digital ID certificate and a
docket has been created, the participant can then submit a request for
hearing or petition for leave to intervene. Submissions should be in
Portable Document Format (PDF) in accordance with NRC guidance
available on the NRC public Web site at http://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the time the
documents are submitted through the NRC's E-Filing system. To be
timely, an electronic filing must be submitted to the E-Filing system
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of
a transmission, the E-Filing system time-stamps the document and sends
the submitter an e-mail notice confirming receipt of the document. The
E-Filing system also distributes an e-mail notice that provides access
to the document to the NRC Office of the General Counsel and any others
who have advised the Office of the Secretary that they wish to
participate in the proceeding, so that the filer need not serve the
documents on those participants separately. Therefore, applicants and
other participants (or their counsel or representative) must apply for
and receive a digital ID certificate before a hearing request/petition
to intervene is filed so that they can obtain access to the document
via the E-Filing system.
A person filing electronically using the agency's adjudicatory E-
Filing system may seek assistance by contacting the NRC Meta System
Help Desk through the ``Contact Us'' link located on the NRC Web site
at http://www.nrc.gov/site-help/e-submittals.html, by e-mail at
[email protected], or by a toll-free call at 866-672-7640. The NRC
Meta System Help Desk is available between 8 a.m. and 8 p.m., Eastern
Time, Monday through Friday, excluding government holidays.
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, Sixteenth
Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland
20852, Attention: Rulemaking and Adjudications Staff. Participants
filing a document in this manner are responsible for serving the
document on all other participants. Filing is considered complete by
first-class mail as of the time of deposit in the mail, or by courier,
express mail, or expedited delivery service upon depositing the
document with the provider of the service. A presiding officer, having
granted an exemption request from using E-Filing, may require a
participant or party to use E-Filing if the presiding officer
subsequently determines that the reason for granting the exemption from
use of E-Filing no longer exists.
Documents submitted in adjudicatory proceedings will appear in
NRC's electronic hearing docket which is available to the public at
http://ehd1.nrc.gov/EHD/, unless excluded pursuant to an order of the
Commission, or the presiding officer. Participants are requested not to
include personal privacy information, such as social security numbers,
home addresses, or home phone numbers in their filings, unless an NRC
regulation or other law requires submission of such information. With
respect to copyrighted works, except for limited excerpts that serve
the purpose of the adjudicatory filings and would constitute a Fair Use
application, participants are requested not to include copyrighted
materials in their submission.
Petitions for leave to intervene must be filed no later than 20
days from the date of publication of this notice. Non-timely filings
will not be entertained absent a determination by the presiding officer
that the petition or request should be granted or the contentions
should be admitted, based on a balancing of the factors specified in 10
CFR 2.309(c)(1)(i)-(viii).
The Commission will issue a notice or order granting or denying a
hearing request or intervention petition, designating the issues for
any hearing that will be held and designating the Presiding Officer. A
notice granting a hearing will be published in the Federal Register and
served on the parties to the hearing.
Within 30 days from the date of publication of this notice, persons
may submit written comments regarding the license transfer application,
as provided for in 10 CFR 2.1305. The Commission will consider and, if
appropriate, respond to these comments, but such comments will not
otherwise constitute part of the decisional record. Comments should be
submitted to the Secretary, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, Attention: Rulemakings and Adjudications
Staff, and should cite the publication date and page number of this
Federal Register notice.
For further details with respect to this license transfer
application, see the application dated March 30, 2011,
[[Page 54264]]
available for public inspection at the Commission's Public Document
Room (PDR), located at One White Flint North, Public File Area O1 F21,
11555 Rockville Pike (first floor), Rockville, Maryland. Publicly
available documents created or received at the NRC are accessible
electronically through ADAMS in the NRC Library at http://www.nrc.gov/reading-rm/adams.html. Persons who do not have access to ADAMS or who
encounter problems in accessing the documents located in ADAMS should
contact the NRC PDR Reference staff by telephone at 1-800-397-4209, or
301-415-4737 or by e-mail to [email protected].
Dated at Rockville, Maryland this 22nd day of August 2011.
For the Nuclear Regulatory Commission.
Farideh E. Saba,
Senior Project Manager, Plant Licensing Branch 2-2, Division of
Operating Reactor Licensing, Office of Nuclear Reactor Regulation.
[FR Doc. 2011-22279 Filed 8-30-11; 8:45 am]