[Federal Register Volume 76, Number 146 (Friday, July 29, 2011)]
[Proposed Rules]
[Pages 45471-45475]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2011-19263]
========================================================================
Proposed Rules
Federal Register
________________________________________________________________________
This section of the FEDERAL REGISTER contains notices to the public of
the proposed issuance of rules and regulations. The purpose of these
notices is to give interested persons an opportunity to participate in
the rule making prior to the adoption of the final rules.
========================================================================
Federal Register / Vol. 76, No. 146 / Friday, July 29, 2011 /
Proposed Rules
[[Page 45471]]
DEPARTMENT OF ENERGY
10 CFR Chapter II
[Docket Number EERE-2010-BT-STD-0048]
RIN 1904-AC04
Energy Efficiency Standards for Distribution Transformers; Notice
of Intent To Negotiate Proposed Rule
AGENCY: Office of Energy Efficiency and Renewable Energy, Department of
Energy.
ACTION: Notice of Intent.
-----------------------------------------------------------------------
SUMMARY: The U.S. Department of Energy (DOE or the Department) is
giving notice that it intends to establish a negotiated rulemaking
subcommittee under ERAC in accordance with the Federal Advisory
Committee Act (FACA) and the Negotiated Rulemaking Act (NRA) to
negotiate proposed Federal standards for the energy efficiency of
liquid immersed and medium voltage dry-type distribution transformers.
The purpose of the subcommittee will be to discuss and, if possible,
reach consensus on a proposed rule for the energy efficiency of
distribution transformers, as authorized by the Energy Policy and
Conservation Act (EPCA) of 1975, as amended. The subcommittee will
consist of representatives of parties having a defined stake in the
outcome of the proposed standards, and will consult as appropriate with
a range of experts on technical issues.
DATES: Written comments and requests to be appointed as members of the
subcommittee are welcome and should be submitted by August 15, 2011.
ADDRESSES: Interested persons may submit comments, identified by docket
number EERE-2010-BT-STD-0048, by any of the following methods:
Federal eRulemaking Portal: http://www.regulations.gov.
Follow the instructions for submitting comments.
E-mail: [email protected].
Include EERE-2010-BT-STD-0048 and/or RIN 1904-AC04 in the subject line
of the message.
Mail: Ms. Brenda Edwards, U.S. Department of Energy,
Building Technologies Program, Mailstop EE-2J, EERE-2010-BT-STD-0048
and/or RIN 1904-AC04, 1000 Independence Avenue, SW., Washington, DC
20585-0121. Phone: (202) 586-2945. Please submit one signed paper
original.
Hand Delivery/Courier: Ms. Brenda Edwards, U.S. Department
of Energy, Building Technologies Program, 6th Floor, 950 L'Enfant
Plaza, SW., Washington, DC 20024. Phone: (202) 586-2945. Please submit
one signed paper original.
Instructions: All submissions received must include the agency name
and docket number or RIN for this rulemaking.
Docket: For access to the docket to read background documents, a
copy of the transcript of the public meeting, or comments received, go
to the U.S. Department of Energy, 6th Floor, 950 L'Enfant Plaza, SW.,
Washington, DC 20024, (202) 586-2945, between 9 a.m. and 4 p.m., Monday
through Friday, except Federal holidays. Please call Ms. Brenda Edwards
at (202) 586-2945 for additional information regarding visiting the
Resource Room.
FOR FURTHER INFORMATION CONTACT: John Cymbalsky, U.S. Department of
Energy, Office of Building Technologies (EE-2J), 1000 Independence
Avenue, SW., Washington, DC 20585-0121. Telephone: (202) 287-1692. E-
mail: [email protected].
Ms. Jennifer Tiedeman, U.S. Department of Energy, Office of the
General Counsel (GC-71), 1000 Independence Ave., SW., Washington, DC
20585-0121. Telephone: (202) 287-6111. E-mail:
[email protected].
SUPPLEMENTARY INFORMATION:
Preamble
I. Statutory Authority
II. Background
III. Proposed Negotiating Procedures
IV. Comments Requested
I. Statutory Authority
This notice of intent announcing DOE's intent to negotiate a
proposed regulation setting energy efficiency standards for
distribution transformers was developed under the authority of sections
563 and 564 of the NRA (5 U.S.C. Sec. Sec. 561-570, Pub. L. 104-320).
The regulation setting energy efficiency standards for distribution
transformers that DOE is proposing to develop under a negotiated
rulemaking will be developed under the authority of EPCA, as amended,
42 U.S.C. 6313(a)(6)(C) and 6317(a).
II. Background
As required by the NRA, DOE is giving notice that it is
establishing a subcommittee under ERAC to develop proposed energy
efficiency standards for distribution transformers.
EPCA, as amended, directs DOE to adopt energy conservation
standards for those distribution transformers for which standards would
be technologically feasible and economically justified, and would
result in significant energy savings. (42 U.S.C. 6317(a)(2)). On
October 12, 2007, DOE issued a final rule adopting energy efficiency
standards for electricity distribution transformers (``final rule'').
72 FR 58190-58241 (October 12, 2007). The standards in that final rule
applied to liquid-immersed and medium-voltage dry-type distribution
transformers. In December 2007, a group of States and environmental
groups sued DOE challenging the final rule. In July 2009, the United
States Court of Appeals for the 9th Circuit approved a settlement
agreement amongst the parties to that lawsuit which allowed the
standards in the final rule to become applicable, beginning January 1,
2010, but required DOE to conduct a review of the standards for liquid-
immersed and medium-voltage dry-type distribution transformers and
publish in the Federal Register, no later than October 1, 2011, either
a determination pursuant to EPCA, that standards for these products do
not need to be amended or a notice of proposed rulemaking including any
new proposed standards for these products. DOE further agreed that if,
after conducting its review, DOE determines that amendment of the
standards is warranted, DOE will publish in the Federal Register, no
later than October 1, 2012, a final rule including any amendments to
the standards for liquid-immersed and medium-voltage dry-type
distribution transformers, with any such amended standards shall
require compliance no later than January 1, 2016.
[[Page 45472]]
A. Negotiated Rulemaking
DOE has decided to use the negotiated rulemaking process to develop
proposed energy efficiency standards for distribution transformers.
Under EPCA, Congress mandated that DOE develop regulations establishing
energy efficiency standards for covered residential and commercial
appliances that are designed to achieve the maximum improvement in
energy efficiency that are technologically feasible and economically
justified. (42 U.S.C. 6295(o)(2)(A)) The primary reason for using the
negotiated rulemaking process for developing a proposed Federal
standard is that stakeholders strongly support a consensual rulemaking
effort. DOE believes such a regulatory negotiation process will be less
adversarial and better suited to resolving complex technical issues. An
important virtue of negotiated rulemaking is that it allows expert
dialog that is much better than traditional techniques at getting the
facts and issues right and will result in a proposed rule that will
effectively reflect Congressional intent.
A regulatory negotiation will enable DOE to engage in direct and
sustained dialog with informed, interested, and affected parties when
drafting the regulation, rather than obtaining input during a public
comment period after developing and publishing a proposed rule. Gaining
this early understanding of all parties' perspectives allows DOE to
address key issues at an earlier stage of the process, thereby allowing
more time for an iterative process to resolve issues. A rule drafted by
negotiation with informed and affected parties is expected to be
potentially more pragmatic and more easily implemented than a rule
arising from the traditional process. Such rulemaking improvement is
likely to provide the public with the full benefits of the rule while
minimizing the potential negative impact of a proposed regulation
conceived or drafted without the full prior input of outside
knowledgeable parties. Because a negotiating subcommittee includes
representatives from the major stakeholder groups affected by or
interested in the rule, the number of public comments on the proposed
rule may be decreased. DOE anticipates that there will be a need for
fewer substantive changes to a proposed rule developed under a
regulatory negotiation process prior to the publication of a final
rule.
B. The Concept of Negotiated Rulemaking
Usually, DOE develops a proposed rulemaking using Department staff
and consultant resources. Typically, a preliminary analysis is vetted
for stakeholder comments after a Framework Document is published and
comments taken thereon. After the notice of proposed rulemaking is
published for comment, affected parties may submit arguments and data
defining and supporting their positions with regard to the issues
raised in the proposed rule. Congress noted in the NRA, however, that
regulatory development may ``discourage the affected parties from
meeting and communicating with each other, and may cause parties with
different interests to assume conflicting and antagonistic positions *
* *.'' (5 U.S.C. 561(2)(2)) Congress also stated that ``adversarial
rulemaking deprives the affected parties and the public of the benefits
of face-to-face negotiations and cooperation in developing and reaching
agreement on a rule. It also deprives them of the benefits of shared
information, knowledge, expertise, and technical abilities possessed by
the affected parties.'' (5 U.S.C. 561(2)(3))
Using negotiated rulemaking to develop a proposed rule differs
fundamentally from the Department-centered process. In negotiated
rulemaking, a proposed rule is developed by an advisory committee or
subcommittee, chartered under FACA (5 U.S.C. App. 2), composed of
members chosen to represent the various interests that will be
significantly affected by the rule. The goal of the advisory committee
or subcommittee is to reach consensus on the treatment of the major
issues involved with the rule. The process starts with the Department's
careful identification of all interests potentially affected by the
rulemaking under consideration. To help with this identification, the
Department publishes a notice of intent such as this one in the Federal
Register, identifying a preliminary list of interested parties and
requesting public comment on that list. Following receipt of comments,
the Department establishes an advisory committee or subcommittee
representing the full range of stakeholders to negotiate a consensus on
the terms of a proposed rule. Representation on the advisory committee
or subcommittee may be direct; that is, each member may represent a
specific interest, or may be indirect, such as through trade
associations and/or similarly-situated parties with common interests.
The Department is a member of the advisory committee or subcommittee
and represents the Federal government's interests. The advisory
committee or subcommittee chair is assisted by a neutral mediator who
facilitates the negotiation process. The role of the mediator, also
called a facilitator, is to apply proven consensus-building techniques
to the advisory committee or subcommittee process.
After an advisory committee or subcommittee reaches consensus on
the provisions of a proposed rule, the Department, consistent with its
legal obligations, uses such consensus as the basis of its proposed
rule, which then is published in the Federal Register. This publication
provides the required public notice and provides for a public comment
period. Other participants and other interested parties retain their
rights to comment, participate in an informal hearing (if requested),
and request judicial review. DOE anticipates, however, that the pre-
proposal consensus agreed upon by the advisory committee or
subcommittee will narrow any issues in the subsequent rulemaking.
C. Proposed Rulemaking for Energy Efficiency Standards for Distribution
Transformers
The NRA enables DOE to establish an advisory committee or
subcommittee if it is determined that the use of the negotiated
rulemaking process is in the public interest. DOE intends to develop
Federal regulations that build on the depth of experience accrued in
both the public and private sectors in implementing standards and
programs.
DOE has determined that the regulatory negotiation process will
provide for obtaining a diverse array of in-depth input, as well as an
opportunity for increased collaborative discussion from both private-
sector stakeholders and government officials who are familiar with
energy efficiency of distribution transformers. In July of 2011, DOE
initiated the convening stage of the negotiated rulemaking process to
identify and interview appropriate public- and private-sector
stakeholders. DOE retained an expert convener to contact parties
potentially affected by energy efficiency standards for distribution
transformers to determine whether stakeholders are interested in
participating in a negotiated rulemaking process and whether they
believe stakeholder issues can be addressed and resolved through a
regulatory negotiation. Following an evaluation of initial stakeholder
interest and input, the independent convener determined that there is
sufficient enthusiasm
[[Page 45473]]
among stakeholders to support a negotiated rulemaking process and that
there is a reasonably good chance of successfully reaching a consensus
agreement among stakeholders on the rule.
D. Department Commitment
In initiating this regulatory negotiation process to develop energy
efficiency standards for distribution transformers, DOE is making a
commitment to provide adequate resources to facilitate timely and
successful completion of the process. This commitment includes making
the process a priority activity for all representatives, components,
officials, and personnel of the Department who need to be involved in
the rulemaking, from the time of initiation until such time as a final
rule is issued or the process is expressly terminated. DOE will provide
administrative support for the process and will take steps to ensure
that the advisory committee or subcommittee has the dedicated resources
it requires to complete its work in a timely fashion. Specifically, DOE
will make available the following support services: properly equipped
space adequate for public meetings and caucuses; logistical support;
word processing and distribution of background information; the service
of a facilitator; and such additional research and other technical
assistance as may be necessary.
To the maximum extent possible consistent with the legal
obligations of the Department, DOE will use the consensus of the
advisory committee or subcommittee as the basis for the rule the
Department proposes for public notice and comment.
E. Negotiating Consensus
As discussed above, the negotiated rulemaking process differs
fundamentally from the usual process for developing a proposed rule.
Negotiation enables interested and affected parties to discuss various
approaches to issues rather than asking them only to respond to a
proposal developed by the Department. The negotiation process involves
a mutual education of the various parties on the practical concerns
about the impact of standards. Each advisory committee or subcommittee
member participates in resolving the interests and concerns of other
members, rather than leaving it up to DOE to evaluate and incorporate
different points of view.
A key principle of negotiated rulemaking is that agreement is by
consensus of all the interests. Thus, no one interest or group of
interests is able to control the process. The NRA defines consensus as
the unanimous concurrence among interests represented on a negotiated
rulemaking committee or subcommittee, unless the committee or
subcommittee itself unanimously agrees to use a different definition.
(5 U.S.C. Sec. 562) In addition, experience has demonstrated that
using a trained mediator to facilitate this process will assist all
parties, including DOE, in identifying their real interests in the
rule, and thus will enable parties to focus on and resolve the
important issues.
III. Proposed Negotiating Procedures
A. Key Issues for Negotiation
The convener identified the following issues and concerns that will
underlie the work of the Negotiated Rulemaking Committee on Energy
Efficiency Standards for Distribution Transformers:
DOE's key issues include assuring full compliance with
statutory mandates. Congress has mandated that DOE establish minimum
energy efficiency standards that are technologically feasible and
economically justified.
The committee must find ways to balance the goals and
priorities of State regulatory programs and DOE's program for energy
efficiency standards.
Manufacturers desire that standards not diminish or
constrain innovation for these products.
Environmental advocates seek to ensure that standards
achieve the maximum energy savings that are technologically feasible
and economically justifiable.
To examine the underlying issues outlined above, and others not yet
articulated, all parties in the negotiation will need DOE to provide
data and an analytic framework complete and accurate enough to support
their deliberations. DOE's analyses must be adequate to inform a
prospective negotiation--for example, a preliminary Technical Support
Document or equivalent must be available and timely.
B. Formation of Subcommittee
A subcommittee will be formed and operated in full compliance with
the requirements of FACA and in a manner consistent with the
requirements of the NRA. DOE has determined that the subcommittee not
exceed 25 members. The Department believes that more than 25 members
would make it difficult to conduct effective negotiations. DOE is aware
that there are many more potential participants than there are
membership slots on the subcommittee. The Department does not believe,
nor does the NRA contemplate, that each potentially affected group must
participate directly in the negotiations; nevertheless, each affected
interest can be adequately represented. To have a successful
negotiation, it is important for interested parties to identify and
form coalitions that adequately represent significantly affected
interests. To provide adequate representation, those coalitions must
agree to support, both financially and technically, a member of the
subcommittee whom they choose to represent their interests.
DOE recognizes that when it establishes energy efficiency standards
for residential products and commercial equipment, various segments of
society may be affected in different ways, in some cases producing
unique ``interests'' in a proposed rule based on income, gender, or
other factors. The Department will pay attention to providing that any
unique interests that have been identified, and that may be
significantly affected by the proposed rule, are represented.
FACA also requires that members of the public have the opportunity
to attend meetings of the full committee and speak or otherwise address
the committee during the public comment period. In addition, any member
of the public is permitted to file a written statement with the
advisory committee. DOE plans to follow these same procedures in
conducting meetings of the subcommittee.
C. Interests Involved/Subcommittee Membership
DOE anticipates that the subcommittee will comprise no more than 25
members who represent affected and interested stakeholder groups, at
least one of whom must be a member of the ERAC. As required by FACA,
the Department will conduct the negotiated rulemaking with particular
attention to ensuring full and balanced representation of those
interests that may be significantly affected by the proposed rule
governing standards for the energy efficiency of distribution
transformers. Section 562 of the NRA defines the term interest as
``with respect to an issue or matter, multiple parties which have a
similar point of view or which are likely to be affected in a similar
manner.'' Listed below are parties the Department to date has
identified as being ``significantly affected'' by a proposed rule
regarding the energy efficiency of distribution transformers.
The Department of Energy
Distribution transformers manufacturers and trade
associations representing manufacturers
[[Page 45474]]
Component manufacturers and related suppliers
Utilities
Energy efficiency/environmental advocacy groups
Consumers
One purpose of this notice of intent is to determine whether
Federal standards regarding the energy efficiency of distribution
transformers will significantly affect interests that are not listed
above. DOE invites comment and suggestions on its initial list of
significantly affected interests.
DOE also developed an initial list of stakeholders who could serve
on the subcommittee to represent the above-listed interests. The
following list includes organizations DOE tentatively has identified as
being either potential members of the subcommittee, or potential
members of a coalition that would in turn nominate a candidate to
represent one of the significantly affected interests listed above. DOE
invites comment and suggestions on whether the following list of
stakeholders identifies an accurate and comprehensive pool of
stakeholders, or subcommittee members.
Department of Energy
John Cymbalsky
EarthJustice
Tim Ballo
Cooper Power Systems
Jerry Corkran
Prolec GE
Greg Coulter
National Electrical Manufacturers Association
Jim Creevy
Clark Silcox
Appliance Standards Awareness Program
Andrew DeLaski
Kentucky Association of Electric Cooperatives/United Utility
Supply
Charlie Drexler
Northwest Power and Conservation Council
Tom Eckman
Pacific Gas and Electric
Gary Fernstrom
Federal Pacific
Robert Greeson
Howard Industries, Inc.
Gerald Hodge
American Public Power
Michael Hyland
MGM Transformer Company
Mike Iman
Niagara Transformer Corporation
Sheldon Kennedy
Metglass Inc.
Dave Millure
American Council for an Energy Efficiency Economy
Steve Nadel
ABB Inc.
Wes Patterson
Edison Electric Institute
Steve Rosenstock
Natural Resources Defense Council
Robin Roy
National Rural Electric Cooperative Association
Robert Saint
AK Steel Corporation
Jerry Schoen
Northwest Energy Efficiency Alliance
Charles Stevens
ONYX Power Inc.
Vijay Tendulkar
Moon Lake Electric Association
Ken Winder
California Energy Commission (as resource party)
The list provided above includes stakeholders whom DOE tentatively
has identified as being either a potential member of the subcommittee
or a potential member of a coalition that would in turn nominate a
candidate to represent one of the significantly affected interests,
also listed above. The list is not presented as a complete or exclusive
list from which subcommittee members will be selected. Nor does
inclusion on the list of potential parties mean that a listed party has
agreed to participate as a member of the subcommittee or as a member of
a coalition. The list merely indicates parties that DOE tentatively has
identified as representing significantly affected interests in the
proposed rule establishing energy efficiency standards for distribution
transformers.
DOE requests comments and suggestions regarding its tentative list
of potential members of the subcommittee on energy efficiency standards
for distribution transformers. Members may be individuals or
organizations. If the effort is to be fruitful, participants on the
subcommittee should be able to fully and adequately represent the
viewpoints of their respective interests. This document gives notice of
DOE's process to other potential participants and affords them the
opportunity to request representation in the negotiations. Those who
wish to be appointed as members of the subcommittee, including those
that have been tentatively identified by DOE in this notice of intent,
should submit a request to DOE, in accordance with the public
participation procedures outlined in the DATES and ADDRESSES sections
of this notice of intent. Membership of the subcommittee is likely to
involve:
Attendance at approximately five (5), one (1) to two (2)
day meetings;
Travel costs to those meetings; and
Preparation time for those meetings.
Members serving on the subcommittee will not receive compensation
for their services.
Interested parties who are not selected for membership on the
subcommittee may make valuable contributions to this negotiated
rulemaking effort in any of several ways:
The person may request to be placed on the subcommittee
mailing list and submit written comments as appropriate.
The person may attend subcommittee meetings, which are
open to the public; caucus with his or her interest's member on the
subcommittee; or even address the subcommittee during the public
comment portion of the subcommittee meeting.
The person could assist the efforts of a workgroup that
the subcommittee might establish.
A subcommittee may establish informal workgroups, which usually are
asked to facilitate committee deliberations by assisting with various
technical matters (e.g., researching or preparing summaries of the
technical literature or comments on specific matters such as economic
issues). Workgroups also might assist in estimating costs or drafting
regulatory text on issues associated with the analysis of the costs and
benefits addressed, or formulating drafts of the various provisions and
their justifications as previously developed by the subcommittee. Given
their support function, workgroups usually consist of participants who
have expertise or particular interest in the technical matter(s) being
studied. Because it recognizes the importance of this support work for
the subcommittee, DOE will provide appropriate technical expertise for
such workgroups.
D. Good Faith Negotiation
Every subcommittee member must be willing to negotiate in good
faith and have the authority, granted by his or her constituency, to do
so. The first step is to ensure that each member has good
communications with his or her constituencies. An intra-interest
network of communication should be established to bring information
from the support organization to the member at the table, and to take
information from the table back to the support organization. Second,
each organization or coalition therefore should designate as its
representative a person having the credibility and authority to ensure
that needed information is provided and decisions are made in a timely
fashion. Negotiated rulemaking can require the appointed members to
give a significant
[[Page 45475]]
amount of time, which must be sustained for as long as the duration of
the negotiated rulemaking. Although the ERAC advisory committee charter
will be in effect for 2 years from the date it is filed with Congress,
DOE expects the subcommittee's deliberations to conclude or be
terminated earlier than that. Other qualities of members that can be
helpful are negotiating experience and skills, and sufficient technical
knowledge to participate in substantive negotiations.
Certain concepts are central to negotiating in good faith. One is
the willingness to bring all issues to the bargaining table in an
attempt to reach a consensus, as opposed to keeping key issues in
reserve. The second is a willingness to keep the issues at the table
and not take them to other forums. Finally, good faith includes a
willingness to move away from some of the positions often taken in a
more traditional rulemaking process, and instead explore openly with
other parties all ideas that may emerge from the subcommittee's
discussions.
E. Facilitator
The facilitator will act as a neutral in the substantive
development of the proposed standard. Rather, the facilitator's role
generally includes:
Impartially assisting the members of the subcommittee in
conducting discussions and negotiations; and
Impartially assisting in performing the duties of the
Designated Federal Official under FACA.
F. Department Representative
The DOE representative will be a full and active participant in the
consensus-building negotiations. The Department's representative will
meet regularly with senior Department officials, briefing them on the
negotiations and receiving their suggestions and advice so that he or
she can effectively represent the Department's views regarding the
issues before the subcommittee. DOE's representative also will ensure
that the entire spectrum of governmental interests affected by the
standards rulemaking, including the Office of Management and Budget,
the Attorney General, and other Departmental offices, are kept informed
of the negotiations and encouraged to make their concerns known in a
timely fashion.
G. Subcommittee and Schedule
After evaluating the comments submitted in response to this notice
of intent and the requests for nominations, DOE will either inform the
members of the subcommittee that they have been selected or determine
that conducting a negotiated rulemaking is inappropriate. Due to the
court-ordered deadline, DOE plans for the subcommittee to conduct
deliberations in the summer and fall of 2011 and hopes that the
subcommittee will come to an agreement on a Notice of Proposed
Rulemaking in time to publish that proposal by the October 1, 2011 date
contained in the settlement agreement described above.
DOE will advise subcommittee members of administrative matters
related to the functions of the subcommittee before beginning. DOE will
establish a meeting schedule based on the settlement agreement and
produce the necessary documents so as to adhere to that schedule. While
the negotiated rulemaking process is underway, DOE is committed to
performing much of the same analysis as it would during a normal
standards rulemaking process and to providing information and technical
support to the subcommittee.
IV. Comments Requested
DOE requests comments on whether it should use negotiated
rulemaking for its rulemaking pertaining to the energy efficiency of
distribution transformers and the extent to which the issues, parties,
and procedures described above are adequate and appropriate. DOE also
requests comments on which parties should be included in a negotiated
rulemaking to develop draft language pertaining to the energy
efficiency of distribution transformers and suggestions of additional
interests and/or stakeholders that should be represented on the
subcommittee. All who wish to participate as members of the
subcommittee should submit a request for nomination to DOE.
V. Approval of the Office of the Secretary
The Secretary of Energy has approved publication of today's notice
intent to negotiate a proposed rulemaking.
Issued in Washington, DC, on July 26, 2011.
Kathleen Hogan,
Deputy Assistant Secretary, Energy Efficiency and Renewable Energy.
[FR Doc. 2011-19263 Filed 7-28-11; 8:45 am]