[Federal Register Volume 75, Number 184 (Thursday, September 23, 2010)]
[Notices]
[Pages 57947-57952]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2010-23825]
-----------------------------------------------------------------------
FEDERAL COMMUNICATIONS COMMISSION
[AU Docket No. 10-147; DA 10-1351]
Auction of VHF Commercial Television Station Construction Permits
Scheduled for February 15, 2011; Comment Sought on Competitive Bidding
Procedures for Auction 90
AGENCY: Federal Communications Commission.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: This document announces the auction of certain VHF
construction permits scheduled to commence on February 15, 2011
(Auction 90). This document also seeks comment on competitive bidding
procedures for Auction 90.
DATES: Comments are due on or before September 30, 2010, and reply
comments are due on or before October 15, 2010.
ADDRESSES: You may submit comments, identified by AU Docket No. 10-147,
by any of the following methods:
[[Page 57948]]
Federal eRulemaking Portal: http://www.regulations.gov.
Follow the instructions for submitting comments.
Federal Communications Commission's Web Site: http://fjallfoss.fcc.gov/ecfs2/. Follow the instructions for submitting
comments.
Paper Filers: Parties who choose to file by paper must
file an original and four copies of each filing. Filings can be sent by
hand or messenger delivery, by commercial overnight courier, or by
first-class or overnight U.S. Postal Service mail. All filings must be
addressed to the Commission's Secretary, Attn: WTB/ASAD, Office of the
Secretary, Federal Communications Commission.
All hand-delivered or messenger-delivered paper filings
for the Commission's Secretary must be delivered to FCC Headquarters at
445 12th St., SW., Room TW-A325, Washington, DC 20554. All hand
deliveries must be held together with rubber bands or fasteners. Any
envelopes must be disposed of before entering the building.
Commercial overnight mail (other than U.S. Postal Service
Express Mail and Priority Mail) must be sent to 9300 East Hampton
Drive, Capitol Heights, MD 20743.
People with Disabilities: Contact the FCC to request
reasonable accommodations (accessible format documents, sign language
interpreters, CART, etc.) by e-mail: [email protected] or telephone: 202-
418-0530 or TTY: 202-418-0432.
The Wireless Telecommunications Bureau requests that a
copy of all comments and reply comments be submitted electronically to
the following address: [email protected].
People with Disabilities: Contact the FCC to request
reasonable accommodations (accessible format documents, sign language
interpreters, CART, etc.) by e-mail: [email protected] or phone: 202-418-
0530 or TTY: 202-418-0432.
FOR FURTHER INFORMATION CONTACT: Wireless Telecommunications Bureau,
Auctions and Spectrum Access Division: For auction legal questions:
Howard Davenport at (202) 418-0660; for general auction questions: Jeff
Crooks at (202) 418-2074 or Barbara Sibert at (717) 338-2868. Media
Bureau, Video Division: for service rules questions: Shaun Maher or
Adrienne Denysyk at (202) 418-1600.
SUPPLEMENTARY INFORMATION: This is a summary of the Auction 90 Comment
Public Notice released on September 8, 2010. The complete text of the
Auction 90 Comment Public Notice, including an attachment and related
Commission documents, is available for public inspection and copying
from 8 a.m. to 4:30 p.m. ET Monday through Thursday or from 8 a.m. to
11:30 a.m. ET on Fridays in the FCC Reference Information Center, 445
12th Street SW., Room CY-A257, Washington, DC 20554. The Auction 90
Comment Public Notice and related Commission documents also may be
purchased from the Commission's duplicating contractor, Best Copy and
Printing, Inc. (BCPI), 445 12th Street SW., Room CY-B402, Washington,
DC 20554, telephone 202-488-5300, fax 202-488-5563, or you may contact
BCPI at its Web site: http://www.BCPIWEB.com. When ordering documents
from BCPI, please provide the appropriate FCC document number, for
example, DA 10-1351. The Auction 90 Comment Public Notice and related
documents also are available on the Internet at the Commission's Web
site: http://wireless.fcc.gov/auctions/90/, or by using the search
function for AU Docket No.10-147 on the ECFS Web page at http://www.fcc.gov/cgb/ecfs/.
I. Introduction
1. The Wireless Telecommunications and the Media Bureaus (the
Bureaus) announce an auction of two digital very high frequency (VHF)
commercial television station construction permits. This auction, which
is designated Auction 90, is scheduled to commence on February 15,
2011.
II. Construction Permits in Auction 90
2. Auction 90 will offer construction permits for two VHF
commercial television stations as follows:
------------------------------------------------------------------------
------------------------------------------------------------------------
MM-DTV012-4.......................... Atlantic City, NJ....... DTV 4
MM-DTV013-5.......................... Seaford, DE............. DTV 5
------------------------------------------------------------------------
III. Due Diligence
3. Potential bidders are reminded that they are solely responsible
for investigating and evaluating all technical and marketplace factors
that may have a bearing on the value of the construction permits for
broadcast facilities they are seeking in this auction. Bidders are
responsible for assuring themselves that, if they win a construction
permit, they will be able to build and operate facilities in accordance
with the Commission's rules.
4. Applicants should perform their due diligence research and
analysis before proceeding, as they would with any new business
venture. In particular, potential bidders are strongly encouraged to
review all underlying Commission orders. The Bureaus note that both of
the permits being offered in this auction are available pursuant to
allocations made pursuant to Section 331(a) of the Communications Act.
Therefore, each station must remain on a VHF channel as long as the
station is the only commercial VHF station in its State. Additionally,
potential bidders should perform technical analyses and/or refresh any
previous analyses to assure themselves that, should they be a winning
bidder for any Auction 90 construction permit, they will be able to
build and operate facilities that will fully comply with the
Commission's current technical and legal requirements.
5. Applicants are strongly encouraged to conduct their own research
prior to Auction 90 in order to determine the existence of pending
administrative or judicial proceedings, including pending allocations
rulemaking proceedings that might affect their decisions regarding
participation in the auction.
6. Participants in Auction 90 are strongly encouraged to continue
such research throughout the auction. The due diligence considerations
mentioned in the Auction 90 Comment Public Notice does not comprise an
exhaustive list of steps that should be undertaken prior to
participating in this auction. As always, the burden is on the
potential bidder to determine how much research to undertake, depending
upon specific facts and circumstances.
IV. Bureaus Seek Comment on Auction Procedures
A. Auction Structure
i. Simultaneous Multiple-Round Auction Design
7. The Bureaus propose to auction the two construction permits
included in Auction 90 using the Commission's standard simultaneous
multiple-round auction format. This type of auction offers every
construction permit for bid at the same time and consists of successive
bidding rounds in which eligible bidders may place bids on individual
construction permits. Typically, bidding remains open on all
construction permits until bidding stops on every construction permit.
The Bureaus seek comment on this proposal.
ii. Bidding Rounds
8. Auction 90 will consist of sequential bidding rounds, each
followed by the release of round results. The initial bidding schedule
will be announced in a public notice to be released at least one week
before the start of the auction. Details on viewing round results,
including the location and format of downloadable round
[[Page 57949]]
results files, will be included in the same public notice.
9. The Commission will conduct Auction 90 over the Internet, and
telephonic bidding will be available as well. The toll-free telephone
number for the Auction Bidder Line will be provided to qualified
bidders.
10. The Bureaus propose to retain the discretion to change the
bidding schedule in order to foster an auction pace that reasonably
balances speed with the bidders' need to study round results and adjust
their bidding strategies. Under this proposal, the Bureaus may change
the amount of time for the bidding rounds, the amount of time between
rounds, or the number of rounds per day, depending upon bidding
activity and other factors. The Bureaus seek comment on this proposal.
Commenters may wish to address the role of the bidding schedule in
managing the pace of the auction and the tradeoffs in managing auction
pace by bidding schedule changes, by changing the activity requirements
or bid amount parameters, or by using other means.
iii. Stopping Rule
11. For Auction 90, the Bureaus propose to employ a simultaneous
stopping rule approach. A simultaneous stopping rule means that all
construction permits remain available for bidding until bidding closes
simultaneously on all construction permits. More specifically, bidding
will close simultaneously on all construction permits after the first
round in which no bidder submits any new bids, applies a proactive
waiver, or withdraws any provisionally winning bids (if bid withdrawals
are permitted in this auction). Thus, unless the Bureaus announce
alternative procedures, bidding will remain open on all construction
permits until bidding stops on every construction permit. Consequently,
it is not possible to determine in advance how long the auction will
last.
12. Further, the Bureaus propose to retain the discretion to
exercise any of the following options during Auction 90: (1) Use a
modified version of the simultaneous stopping rule. The modified
stopping rule would close the auction for all construction permits
after the first round in which no bidder applies a waiver, withdraws a
provisionally winning bid (if withdrawals are permitted in this
auction), or places any new bids on any construction permit for which
it is not the provisionally winning bidder. Thus, absent any other
bidding activity, a bidder placing a new bid on a construction permit
for which it is the provisionally winning bidder would not keep the
auction open under this modified stopping rule; (2) Declare that the
auction will end after a specified number of additional rounds. If the
Bureaus invoke this special stopping rule, they will accept bids in the
specified final round(s), after which the auction will close; and (3)
Keep the auction open even if no bidder places any new bids, applies a
waiver, or withdraws any provisionally winning bids (if withdrawals are
permitted in this auction). In this event, the effect will be the same
as if a bidder had applied a waiver. The activity rule will apply as
usual, and a bidder with insufficient activity will either lose bidding
eligibility or use a waiver.
13. The Bureaus propose to exercise these options only in certain
circumstances, for example, where the auction is proceeding unusually
slowly or quickly, there is minimal overall bidding activity, or it
appears likely that the auction will not close within a reasonable
period of time or will close prematurely. Before exercising these
options, the Bureaus are likely to attempt to change the pace of the
auction by, for example, changing the number of bidding rounds per day
and/or changing minimum acceptable bids. The Bureaus propose to retain
the discretion to exercise any of these options with or without prior
announcement during the auction. The Bureaus seek comment on these
proposals.
iv. Information Relating to Auction Delay, Suspension, or Cancellation
14. For Auction 90, the Bureaus propose that, by public notice or
by announcement during the auction, the Bureaus may delay, suspend, or
cancel the auction in the event of natural disaster, technical
obstacle, administrative or weather necessity, evidence of an auction
security breach or unlawful bidding activity, or for any other reason
that affects the fair and efficient conduct of competitive bidding. In
such cases, the Bureaus, in their sole discretion, may elect to resume
the auction starting from the beginning of the current round, resume
the auction starting from some previous round, or cancel the auction in
its entirety. Network interruption may cause the Bureaus to delay or
suspend the auction. The Bureaus emphasize that exercise of this
authority is solely within the discretion of the Bureaus, and its use
is not intended to be a substitute for situations in which bidders may
wish to apply their activity rule waivers. The Bureaus seek comment on
this proposal.
B. Auction Procedures
i. Upfront Payments and Bidding Eligibility
15. For Auction 90, the Bureau proposes to make the upfront
payments equal to the minimum opening bids. The specific upfront
payments for each license are listed in Attachment A of the Auction 90
Comment Public Notice. The Bureau seeks comment on this proposal.
16. The Bureaus further propose that the amount of the upfront
payment submitted by a bidder will determine the bidder's initial
bidding eligibility in bidding units. The Bureaus propose that each
construction permit be assigned a specific number of bidding units
equal to the upfront payment listed in Attachment A of the Auction 90
Comment Public Notice, on a bidding unit per dollar basis. The number
of bidding units for a given construction permit is fixed and does not
change during the auction as prices change. A bidder may place bids on
multiple construction permits, provided that the total number of
bidding units associated with those construction permits does not
exceed the bidder's current eligibility.
17. Eligibility cannot be increased during the auction; it can only
remain the same or decrease. Thus, in calculating its upfront payment
amount and hence its initial bidding eligibility, an applicant must
determine the maximum number of bidding units on which it may wish to
bid (or hold provisionally winning bids) in any single round, and
submit an upfront payment amount covering that total number of bidding
units. Provisionally winning bids are bids that would become final
winning bids if the auction were to close in that given round. The
Bureaus request comment on these proposals.
ii. Activity Rule
18. In order to ensure that the auction closes within a reasonable
period of time, an activity rule requires bidders to bid actively
throughout the auction, rather than wait until late in the auction
before participating. A bidder's activity in a round will be the sum of
the bidding units associated with any construction permits upon which
it places bids during the current round and the bidding units
associated with any construction permits for which it holds
provisionally winning bids. Failure to maintain the requisite activity
level will result in the use of an activity rule waiver, if any remain,
or a
[[Page 57950]]
reduction in the bidder's eligibility, possibly curtailing or
eliminating the bidder's ability to place additional bids in the
auction. The Bureaus seek comment on this proposal.
iii. Activity Rule Waivers and Reducing Eligibility
19. Use of an activity rule waiver preserves the bidder's
eligibility despite the bidder's activity in the current round being
below the required minimum level. An activity rule waiver applies to an
entire round of bidding, not to a particular construction permit.
Activity rule waivers can be either proactive or automatic and are
principally a mechanism for auction participants to avoid the loss of
bidding eligibility in the event that exigent circumstances prevent
them from bidding in a particular round.
20. The FCC Auction System assumes that a bidder that does not meet
the activity requirement would prefer to use an activity rule waiver
(if available) rather than lose bidding eligibility. Therefore, the
system will automatically apply a waiver at the end of any bidding
round in which a bidder's activity level is below the minimum required
unless: (1) The bidder has no activity rule waivers remaining; or (2)
the bidder overrides the automatic application of a waiver by reducing
eligibility, thereby meeting the activity requirement. If a bidder has
no waivers remaining and does not satisfy the required activity level,
its current eligibility will be permanently reduced, possibly
curtailing or eliminating the bidder's ability to place additional bids
in the auction.
21. A bidder with insufficient activity may wish to reduce its
bidding eligibility rather than use an activity rule waiver. If so, the
bidder must affirmatively override the automatic waiver mechanism
during the bidding round by using the reduce eligibility function in
the FCC Auction System. In this case, the bidder's eligibility is
permanently reduced to bring the bidder into compliance with the
activity rule. Reducing eligibility is an irreversible action; once
eligibility has been reduced, a bidder will not be permitted to regain
its lost bidding eligibility, even if the round has not yet closed.
22. Under the proposed simultaneous stopping rule, a bidder may
apply an activity rule waiver proactively as a means to keep the
auction open without placing a bid. If a bidder proactively applies an
activity rule waiver (using the apply waiver function in the FCC
Auction System) during a bidding round in which no bids are placed or
withdrawn (if bid withdrawals are permitted in this auction), the
auction will remain open and the bidder's eligibility will be
preserved. An automatic waiver applied by the FCC Auction System in a
round in which there are no new bids, withdrawals (if bid withdrawals
are permitted in this auction), or proactive waivers will not keep the
auction open. A bidder cannot apply a proactive waiver after bidding in
a round, and applying a proactive waiver will preclude a bidder from
placing any bids in that round. Applying a waiver is irreversible; once
a proactive waiver is submitted, that waiver cannot be unsubmitted,
even if the round has not yet closed.
23. The Bureaus propose that each bidder in Auction 90 be provided
with three activity rule waivers that may be used as set forth above at
the bidder's discretion during the course of the auction. The Bureaus
seek comment on this proposal.
iv. Reserve Price or Minimum Opening Bids
24. A reserve price is an absolute minimum price below which an
item will not be sold in a given auction. Reserve prices can be either
published or unpublished. A minimum opening bid, on the other hand, is
the minimum bid price set at the beginning of the auction below which
no bids are accepted. It is generally used to accelerate the
competitive bidding process. It is possible for the minimum opening bid
and the reserve price to be the same amount.
25. The Bureaus propose to establish minimum opening bid amounts
for Auction 90. The Bureaus believe a minimum opening bid amount, which
has been used in other broadcast auctions, is an effective bidding tool
for accelerating the competitive bidding process. The Bureaus do not
propose to establish a separate reserve price for the construction
permits to be offered in Auction 90.
26. For Auction 90, the Bureaus propose minimum opening bid amounts
determined by taking into account the type of service and class of
facility offered, market size, population covered by the proposed
broadcast facility, and recent broadcast transaction data. The proposed
minimum opening bid amounts are $200,000 for each construction permit
available in Auction 90. The Bureaus seek comment on these proposals.
27. If commenters believe that these minimum opening bid amounts
will result in unsold construction permits, are not reasonable amounts,
or should instead operate as reserve prices, they should explain why
this is so and comment on the desirability of an alternative approach.
Commenters are advised to support their claims with valuation analyses
and suggested amounts or formulas for reserve prices or minimum opening
bids. In establishing the minimum opening bid amounts, the Bureaus
particularly seek comment on factors that could reasonably have an
impact on valuation of the broadcast spectrum, including the type of
service and class of facility offered, market size, population covered
by the proposed VHF commercial television station and any other
relevant factors.
v. Bid Amounts
28. The Bureaus propose that, in each round, eligible bidders be
able to place a bid on a given construction permit in any of up to nine
different amounts. Under this proposal, the FCC Auction System
interface will list the acceptable bid amounts for each construction
permit.
29. For Auction 90, the Bureaus propose to use a minimum acceptable
bid percentage of 10 percent. This means that the minimum acceptable
bid amount for a construction permit will be approximately 10 percent
greater than the provisionally winning bid amount for the construction
permit. To calculate the additional acceptable bid amounts, the Bureaus
propose to use a bid increment percentage of 5 percent.
30. The Bureaus retain the discretion to change the minimum
acceptable bid amounts, the minimum acceptable bid percentage, the bid
increment percentage, and the number of acceptable bid amounts if the
Bureaus determine that circumstances so dictate. Further, the Bureaus
retain the discretion to do so on a construction permit-by-construction
permit basis. The Bureaus also retain the discretion to limit (a) the
amount by which a minimum acceptable bid for a construction permit may
increase compared with the corresponding provisionally winning bid, and
(b) the amount by which an additional bid amount may increase compared
with the immediately preceding acceptable bid amount. For example, the
Bureaus could set a $10,000 limit on increases in minimum acceptable
bid amounts over provisionally winning bids. Thus, if calculating a
minimum acceptable bid using the minimum acceptable bid percentage
results in a minimum acceptable bid amount that is $12,000 higher than
the provisionally winning bid on a construction permit, the minimum
acceptable bid amount would instead be capped at $10,000 above the
provisionally winning bid. The Bureaus
[[Page 57951]]
seek comment on the circumstances under which the Bureaus should employ
such a limit, factors the Bureaus should consider when determining the
dollar amount of the limit, and the tradeoffs in setting such a limit
or changing other parameters, such as changing the minimum acceptable
bid percentage, the bid increment percentage, or the number of
acceptable bid amounts. If the Bureaus exercise this discretion, they
will alert bidders by announcement in the FCC Auction System during the
auction. The Bureaus seek comment on these proposals.
vi. Provisionally Winning Bids
31. Provisionally winning bids are bids that would become final
winning bids if the auction were to close in that given round. At the
end of a bidding round, a provisionally winning bid for each
construction permit will be determined based on the highest bid amount
received for the construction permit. In the event of identical high
bid amounts being submitted on a construction permit in a given round
(i.e., tied bids), the Bureaus will use a random number generator to
select a single provisionally winning bid from among the tied bids.
(Each bid is assigned a random number, and the tied bid with the
highest random number wins the tiebreaker.) The remaining bidders, as
well as the provisionally winning bidder, can submit higher bids in
subsequent rounds. However, if the auction were to end with no other
bids being placed, the winning bidder would be the one that placed the
provisionally winning bid. If any bids are received on the construction
permit in a subsequent round, the provisionally winning bid again will
be determined by the highest bid amount received for the construction
permit.
32. A provisionally winning bid will remain the provisionally
winning bid until there is a higher bid on the construction permit at
the close of a subsequent round, unless the provisionally winning bid
is withdrawn. Bidders are reminded that provisionally winning bids
count toward activity for purposes of the activity rule.
vii. Bid Removal and Bid Withdrawal
33. For Auction 90, the Bureaus propose and seek comment on the
following bid removal procedures. Before the close of a bidding round,
a bidder has the option of removing any bid placed in that round. By
removing selected bids in the FCC Auction System, a bidder may
effectively undo any bid placed within that round. In contrast to the
bid withdrawal provisions a bidder removing a bid placed in the same
round is not subject to a withdrawal payment. Once a round closes, a
bidder may no longer remove a bid.
34. The Bureaus also seek comment on whether bid withdrawals should
be permitted in Auction 90. When permitted in an auction, bid
withdrawals provide a bidder with the option of withdrawing bids placed
in prior rounds that have become provisionally winning bids. A bidder
may withdraw its provisionally winning bids using the withdraw bids
function in the FCC Auction System. A bidder that withdraws its
provisionally winning bid(s), if permitted, is subject to the bid
withdrawal payment provisions of the Commission rules.
35. For Auction 90 the Bureaus propose to prohibit bidders from
withdrawing any bids after the round in which bids were placed has
closed. This proposal is made in recognition that bid withdrawals,
particularly those made late in this auction, could result in delays in
licensing of digital broadcast television service to the public in
these two markets. The Bureaus are also mindful that the two
construction permits that are the subject of this auction are being
offered as a means to effectuate section 331(a)'s mandate that the
Commission allot at least one VHF channel to each State, if technically
feasible. The Bureaus seek comment on this approach.
C. Post-Auction Payments
i. Interim Withdrawal Payment Percentage
36. The Bureaus seek comment on the appropriate percentage of a
withdrawn bid that should be assessed as an interim withdrawal payment,
in the event that a final withdrawal payment cannot be determined at
the close of the auction. In general, the Commission's rules provide
that a bidder that withdraws a bid during an auction is subject to a
withdrawal payment equal to the difference between the amount of the
withdrawn bid and the amount of the winning bid in the same or a
subsequent auction(s). If a construction permit for which a bid has
been withdrawn does not receive a subsequent higher bid or winning bid
in the same auction, the final withdrawal payment cannot be calculated
until a corresponding construction permit receives a higher bid or
winning bid in a subsequent auction. When that final payment cannot yet
be calculated, the bidder responsible for the withdrawn bid is assessed
an interim bid withdrawal payment, which will be applied toward any
final bid withdrawal payment that is ultimately assessed.
37. The Commission's rules provide that, in advance of each
auction, a percentage shall be established between three percent and
twenty percent of the withdrawn bid to be assessed as an interim bid
withdrawal payment. The Commission has indicated that the level of the
interim withdrawal payment in a particular auction will be based on the
nature of the service and the inventory of the construction permits
being offered. The Commission noted that it may impose a higher interim
withdrawal payment percentage to deter the anti-competitive use of
withdrawals when, for example, there are few synergies to be captured
by combining construction permits.
38. Applying the reasoning that a higher interim withdrawal payment
percentage is appropriate when aggregation of construction permits is
not expected, as with the construction permits subject to competitive
bidding in Auction 90, if the Bureaus allow bid withdrawals in this
auction, the Bureaus propose the maximum interim withdrawal payment
allowed under the current rules. Specifically, the Bureaus propose to
establish an interim bid withdrawal payment of twenty percent of the
withdrawn bid for this auction. The Bureaus seek comment on this
proposal.
ii. Additional Default Payment Percentage
39. Any winning bidder that defaults or is disqualified after the
close of an auction (i.e., fails to remit the required down payment
within the prescribed period of time, fails to submit a timely long-
form application, fails to make full payment, or is otherwise
disqualified) is liable for a default payment under 47 CFR
1.2104(g)(2). This payment consists of a deficiency payment, equal to
the difference between the amount of the bidder's bid and the amount of
the winning bid the next time a construction permit covering the same
spectrum is won in an auction, plus an additional payment equal to a
percentage of the defaulter's bid or of the subsequent winning bid,
whichever is less.
40. The Commission's rules provide that, in advance of each
auction, a percentage shall be established between three percent and
twenty percent of the applicable bid to be assessed as an additional
default payment. As the Commission has indicated, the level of this
payment in each case will be based on the nature of the service and the
construction permits being offered.
[[Page 57952]]
41. For Auction 90, the Bureaus propose to establish an additional
default payment of twenty percent. As previously noted by the
Commission defaults weaken the integrity of the auction process and may
impede the deployment of service to the public, and an additional
default payment of more than the previous three percent will be more
effective in deterring defaults. In light of these considerations for
Auction 90, the Bureaus propose an additional default payment of twenty
percent of the relevant bid. The Bureaus seek comment on this proposal.
V. Deadlines and Filing Procedures
42. Comments are due on or before September 30, 2010, and reply
comments are due on or before October 15, 2010. All filings related to
procedures for Auction 90 must refer to AU Docket No. 10-147. Comments
may be submitted using the Commission's Electronic Comment Filing
System or by filing paper copies. The Bureaus strongly encourage
interested parties to file comments electronically.
43. This proceeding has been designated as a permit-but-disclose
proceeding in accordance with the Commission's ex parte rules. Persons
making oral ex parte presentations are reminded that memoranda
summarizing the presentations must contain summaries of the substance
of the presentations and not merely a listing of the subjects
discussed. More than a one or two sentence description of the views and
arguments presented is generally required. Other rules pertaining to
oral and written ex parte presentations in permit-but-disclose
proceedings are set forth in 47 CFR 1.1206(b).
Federal Communications Commission.
Gary D. Michaels,
Deputy Chief, Auctions and Spectrum Access Division, WTB.
[FR Doc. 2010-23825 Filed 9-22-10; 8:45 am]
BILLING CODE 6712-01-P