[Federal Register Volume 75, Number 139 (Wednesday, July 21, 2010)]
[Notices]
[Pages 42462-42464]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2010-17655]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[NRC-2010-0206; Docket No. 50-443]
Notice of Acceptance for Docketing of the Application and Notice
of Opportunity for Hearing Regarding Renewal of Facility Operating
License No. NPF-86 for an Additional 20-Year Period; Nextera Energy
Seabrook, LLC; Seabrook Station, Unit 1
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is
considering an application for the renewal of operating license NPF-86,
which authorizes NextEra Energy Seabrook, LLC (NES) to operate the
Seabrook Station, Unit 1 (Seabrook Station) at 3648 megawatts thermal.
The renewed license would authorize the applicant to operate Seabrook
Station for an additional 20 years beyond the period specified in the
current license. Seabrook Station is located 13 miles south of
Portsmouth, NH. The current operating license expires on March 15,
2030.
NES submitted the application dated May 25, 2010, pursuant to Title
10 of the Code of Federal Regulations, Part 54 (10 CFR Part 54) to
renew operating license NPF-86. A notice of receipt and availability of
the license renewal application (LRA) was published in the Federal
Register on June 16, 2010 (75 FR 34180).
The Commission's staff has determined that NES has submitted
sufficient information in accordance with 10 CFR Sections 2.101, 51.45,
51.53(c), 54.19, 54.21, 54.22, and 54.23 to enable the staff to
undertake a review of the application, and the application is therefore
acceptable for docketing. The Commission will retain the current Docket
No. 50-443 for operating license No. NPF-86. The determination to
accept the LRA for docketing does not constitute a determination that
the renewed license should be issued and does not preclude the staff
from requesting additional information as the review proceeds.
[[Page 42463]]
Before issuance of the requested renewed license, the NRC will have
made the findings required by the Atomic Energy Act of 1954, as amended
(the Act), and the Commission's rules and regulations. In accordance
with 10 CFR 54.29, the NRC may issue a renewed license on the basis of
its review if it finds that actions have been identified and have been
or will be taken with respect to: (1) Managing the effects of aging
during the period of extended operation on the functionality of
structures and components that have been identified as requiring aging
management review, and (2) time-limited aging analyses that have been
identified as requiring review, such that there is reasonable assurance
that the activities authorized by the renewed license will continue to
be conducted in accordance with the current licensing basis (CLB) and
that any changes made to the plant's CLB will comply with the Act and
the Commission's regulations.
Additionally, in accordance with 10 CFR 51.95(c), the NRC will
prepare an environmental impact statement that is a supplement to the
Commission's NUREG-1437, ``Generic Environmental Impact Statement for
License Renewal of Nuclear Plants,'' dated May 1996. In considering the
LRA, the Commission must find that the applicable requirements of
Subpart A of 10 CFR Part 51 have been satisfied and that matters
successfully raised under 10 CFR 2.335 have been addressed. Pursuant to
10 CFR 51.26 and as part of the environmental scoping process, the
staff intends to hold public scoping meetings. Detailed information
regarding the environmental scoping meetings will be the subject of a
separate Federal Register notice.
Within 60 days after the date of publication of this Federal
Register notice, any person whose interest may be affected by this
proceeding and who wishes to participate as a party in the proceeding
must file a written request for a hearing or a petition for leave to
intervene with respect to the renewal of the license. Requests for a
hearing or petitions for leave to intervene must be filed in accordance
with the Commission's ``Rules of Practice for Domestic Licensing
Proceedings and Issuance of Orders'' in 10 CFR Part 2. Interested
persons should consult a current copy of 10 CFR 2.309, which is
available at the Commission's Public Document Room (PDR), located at
One White Flint North, 11555 Rockville Pike (first floor), Rockville,
Maryland 20852 and is accessible from the NRC's Agencywide Documents
Access and Management System (ADAMS) Public Electronic Reading Room on
the Internet at http://www.nrc.gov/reading-rm/adams.html.http://
www.nrc.gov/readingrm/adams.html Persons who do not have access to the
Internet or who encounter problems in accessing the documents located
in ADAMS should contact the NRC's PDR reference staff by telephone at
(800) 397-4209 (or (301) 415-4737) or by e-mail at
[email protected]. If a request for a hearing and/or petition for
leave to intervene is filed within the 60-day period, the Commission or
a presiding officer designated by the Commission or by the Chief
Administrative Judge of the Atomic Safety and Licensing Board Panel
will rule on the request and/or petition; the Secretary or the Chief
Administrative Judge of the Atomic Safety and Licensing Board Panel
will issue a notice of a hearing or an appropriate order. In the event
that no request for a hearing or petition for leave to intervene is
filed within the 60-day period, the NRC may, upon completion of its
evaluations and upon making the findings required under 10 CFR Parts 51
and 54, renew the license without further notice.
As required by 10 CFR 2.309, a petition for leave to intervene
shall set forth with particularity the interest of the petitioner in
the proceeding and how that interest may be affected by the results of
the proceeding, taking into consideration the limited scope of matters
that may be considered pursuant to 10 CFR Parts 51 and 54. The petition
must specifically explain the reasons why intervention should be
permitted with particular reference to the following factors: (1) The
nature of the requestor's/petitioner's right under the Act to be made a
party to the proceeding; (2) the nature and extent of the requestor's/
petitioner's property, financial, or other interest in the proceeding;
and (3) the possible effect of any decision or order which may be
entered in the proceeding on the requestor's/petitioner's interest. The
petition must also set forth the specific contentions which the
requestor/petitioner seeks to have litigated at the proceeding.
Each contention must consist of a specific statement of the issue
of law or fact to be raised or controverted. In addition, the
requestor/petitioner shall provide a brief explanation of the bases of
each contention and a concise statement of the alleged facts or the
expert opinion that supports the contention on which the requestor/
petitioner intends to rely in proving the contention at the hearing.
The requestor/petitioner must also provide references to those specific
sources and documents of which the requestor/petitioner is aware and on
which the requestor/petitioner intends to rely to establish those facts
or expert opinion. The requestor/petitioner must provide sufficient
information to show that a genuine dispute exists with the applicant on
a material issue of law or fact. Contentions shall be limited to
matters within the scope of the action under consideration. The
contention must be one that, if proven, would entitle the requestor/
petitioner to relief. A requestor/petitioner who fails to satisfy these
requirements with respect to at least one contention will not be
permitted to participate as a party.
The Commission requests that each contention be given a separate
numeric or alpha designation within one of the following groups: (1)
Technical (primarily related to safety concerns), (2) environmental, or
(3) miscellaneous.
As specified in 10 CFR 2.309, if two or more requestors/petitioners
seek to co-sponsor a contention or propose substantially the same
contention, the requestors/petitioners must jointly designate a
representative who shall have the authority to act for the requestors/
petitioners with respect to that contention.
All documents filed in NRC adjudicatory proceedings, including a
request for hearing, a petition for leave to intervene, any motion or
other document filed in the proceeding prior to the submission of a
request for hearing or petition to intervene, and documents filed by
interested governmental entities participating under 10 CFR 2.315(c),
must be filed in accordance with the NRC E-Filing rule (72 FR 49139,
August 28, 2007). The E-Filing process requires participants to submit
and serve all adjudicatory documents over the Internet, or in some
cases, to mail copies on electronic storage media. Participants may not
submit paper copies of their filings unless they seek an exemption in
accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least
ten (10) days prior to the filing deadline, the participant should
contact the Office of the Secretary by e-mail at
[email protected], or by telephone at (301) 415-1677, to request
(1) a digital ID certificate, which allows the participant (or its
counsel or representative) to digitally sign documents and access the
E-Submittal server for any proceeding in which it is participating; and
(2) advise the Secretary that the participant will be submitting a
request or petition for hearing (even in instances in which the
participant, or its counsel or
[[Page 42464]]
representative, already holds an NRC-issued digital ID certificate).
Based upon this information, the Secretary will establish an electronic
docket for the hearing in this proceeding if the Secretary has not
already established an electronic docket.
Information about applying for a digital ID certificate is
available on NRC's public Web site at http://www.nrc.gov/site-help/e-submittals/apply-certificates.html. System requirements for accessing
the E-Submittal server are detailed in NRC's ``Guidance for Electronic
Submission,'' which is available on the agency's public Web site at
http://www.nrc.gov/site-help/e-submittals.html. Participants may
attempt to use other software not listed on the Web site but should
note that the NRC's E-Filing system does not support unlisted software,
and the NRC Meta System Help Desk will not be able to offer assistance
in using unlisted software.
If a participant is electronically submitting a document to the NRC
in accordance with the E-Filing rule, the participant must file the
document using the NRC's online, Web-based submission form. In order to
serve documents through electronic information exchange, users will be
required to install a Web browser plug-in from the NRC Web site.
Further information on the Web-based submission form, including the
installation of the Web browser plug-in, is available on the NRC's
public Web site at http://www.nrc.gov/site-help/e-submittals.html.
Once a participant has obtained a digital ID certificate and a
docket has been created, the participant can then submit a request for
hearing or petition for leave to intervene. Submissions should be in
Portable Document Format (PDF) in accordance with NRC guidance
available on the NRC public Web site at http://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the time the
documents are submitted through the NRC's E-Filing system. To be
timely, an electronic filing must be submitted to the E-Filing system
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of
a transmission, the E-Filing system time-stamps the document and sends
the submitter an e-mail notice confirming receipt of the document. The
E-Filing system also distributes an e-mail notice that provides access
to the document to the NRC Office of the General Counsel and any others
who have advised the Office of the Secretary that they wish to
participate in the proceeding so that the filer need not serve the
documents on those participants separately. Therefore, applicants and
other participants (or their counsel or representative) must apply for
and receive a digital ID certificate before a hearing request/petition
to intervene is filed so that they can obtain access to the document
via the E-Filing system.
A person filing electronically using the agency's adjudicatory E-
Filing system may seek assistance by contacting the NRC Meta System
Help Desk through the ``Contact Us'' link located on the NRC Web site
at http://www.nrc.gov/site-help/e-submittals.html, by e-mail at
[email protected], or by a toll-free call at (866) 672-7640. The
NRC Meta System Help Desk is available between 8 a.m. and 8 p.m.,
Eastern Time, Monday through Friday, excluding government holidays.
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, Sixteenth
Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland
20852, Attention: Rulemaking and Adjudications Staff. Participants
filing a document in this manner are responsible for serving the
document on all other participants. Filing is considered complete by
first-class mail as of the time of deposit in the mail, or by courier,
express mail, or expedited delivery service upon depositing the
document with the provider of the service. A presiding officer, having
granted an exemption request from using E-Filing, may require a
participant or party to use E-Filing if the presiding officer
subsequently determines that the reason for granting the exemption from
use of E-Filing no longer exists.
Documents submitted in adjudicatory proceedings will appear in
NRC's electronic hearing docket which is available to the public at
http://ehd.nrc.gov/EHD_Proceeding/home.asp, unless excluded pursuant
to an order of the Commission or the presiding officer. Participants
are requested not to include personal privacy information, such as
social security numbers, home addresses, or home phone numbers in their
filings, unless an NRC regulation or other law requires submission of
such information. With respect to copyrighted works, except for limited
excerpts that serve the purpose of the adjudicatory filings and would
constitute a Fair Use application, participants are requested not to
include copyrighted materials in their submission.
Requests for a hearing and/or petitions for leave to intervene must
be filed no later than 60 days from July 21, 2010. Non-timely filings
will not be entertained absent a determination by the presiding officer
that the petition or request should be granted or the contentions
should be admitted, based on a balancing of the factors specified in 10
CFR 2.309(c)(1)(i)-(viii).
Detailed information about the license renewal process can be found
at http:[sol][sol]www.nrc.gov/reactors/operating/licensing/renewal.html
on the NRC's Web site. Copies of the application to renew the operating
license for Seabrook Station are available for public inspection at the
Commission's PDR, located at One White Flint North, 11555 Rockville
Pike (first floor), Rockville, Maryland 20852, and at http://www.nrc.gov/reactors/operating/licensing/renewal/applications/seabrook.html, the NRC's Web site while the application is under
review. The application may be accessed in ADAMS through the NRC's
Public Electronic Reading Room on the Internet at http://www.nrc.gov/reading-rm/adams.html under ADAMS Accession Number ML101590094. As
stated above, persons who do not have access to ADAMS or who encounter
problems in accessing the documents located in ADAMS may contact the
NRC PDR reference staff by telephone at (800) 397-4209 (or (301) 415-
4737) or by e-mail to [email protected].
The staff has verified that a copy of the LRA is also available to
local residents near the site at the Seabrook Library, 25 Liberty
Street, Seabrook, NH 03874 and at the Amesbury Public Library, 149 Main
Street, Amesbury, MA 01913.
Dated at Rockville, Maryland this 13th day of July, 2010.
For the Nuclear Regulatory Commission.
Brian E. Holian,
Director, Division of License Renewal, Office of Nuclear Reactor
Regulation.
[FR Doc. 2010-17655 Filed 7-20-10; 8:45 am]
BILLING CODE 7590-01-P