[Federal Register Volume 75, Number 117 (Friday, June 18, 2010)]
[Notices]
[Pages 34708-34709]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2010-14776]
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
Department of the Army; Corps of Engineers
Notice of Availability of a Final General Conformity
Determination and Record of Decision for the Pacific L.A. Marine
Terminal LLC Crude Oil Terminal Project, Port of Los Angeles, Los
Angeles County, CA
AGENCY: Department of the Army--U.S. Army Corps of Engineers, DoD.
ACTION: Notice of availability.
-----------------------------------------------------------------------
SUMMARY: In November 2008, the Los Angeles Harbor Department (LAHD) and
the U.S. Army Corps of Engineers, Los Angeles District, Regulatory
Division (Corps) published a joint Final Supplemental Environmental
Impact Statement and Subsequent Environmental Impact Report (SEIS/SEIR)
for the development of a marine oil terminal at Berth 408 on Pier 400
in the Port of Los Angeles, Los Angeles County, California (Project).
On February 19, 2010, the Corps published a draft general conformity
determination for the Federal action associated with the Project.
Comments were received on the draft general conformity determination
until March 22, 2010. A general conformity determination was required
because Project construction would require Federal action (i.e.,
issuance of a Corps permit for work and structures in and over
navigable waters of the U.S. pursuant to Section 10 of the River and
Harbor Act) and not all the Federal action's direct and indirect air
emissions would be below specified de minimis thresholds (40 CFR
51.853(b)). On June 1, 2010 and June 3, 2010, the Corps made a final
general conformity determination and completed its environmental review
and executed the Record of Decision (ROD), respectively, for the
Federal action associated with the Project. The Corps considered and
responded to all comments received in making the final general
conformity determination and executing the ROD.
The public can request copies of the final general conformity
determination document or the ROD from the Corps at the address listed
below, or can view or download the final general conformity
determination document from the Corps' Website (http://www.spl.usace.army.mil/regulatory/POLA.htm, scroll down to the link
under Pier 400 Crude Oil Marine Terminal Project) or the Port's Web
site (http://www.portoflosangeles.org/environment/public_notices.asp,
scroll down to link under Pacific L.A. Marine Terminal LLC Crude Oil
Terminal). In addition, copies of the final general conformity document
are available for review during the next 30 days at the following
libraries: L.A. Public Library, Central Branch, 630 West 5th Street,
Los Angeles, California; L.A. Public Library, San Pedro Branch, 921
South Gaffey Street, San Pedro, California; and L.A. Public Library,
Wilmington Branch, 1300 North Avalon, Wilmington, California.
FOR FURTHER INFORMATION CONTACT: Questions or comments concerning the
final general conformity determination or the ROD should be directed to
Dr. Spencer D. MacNeil, Senior Project Manager, North Coast Branch,
Regulatory Division, U.S. Army Corps of Engineers, 2151 Alessandro
Drive, Suite 110, Ventura, California 93001, (805) 585-2152.
SUPPLEMENTARY INFORMATION: None.
[[Page 34709]]
Dated: June 10, 2010.
David J. Castanon,
Chief, Regulatory Division, Los Angeles District.
[FR Doc. 2010-14776 Filed 6-17-10; 8:45 am]
BILLING CODE 3720-58-P