[Federal Register Volume 75, Number 109 (Tuesday, June 8, 2010)]
[Notices]
[Pages 32460-32461]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2010-13554]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP10-431-000]
Natural Gas Pipeline Company of America LLC; Notice of Request
Under Blanket Authorization
May 28, 2010.
Take notice that on May 14, 2010, Natural Gas Pipeline Company of
America LLC (Natural), 3250 Lacey Road, Suite 700, Downers Grove,
Illinois 60515, filed in Docket No. CP10-431-000, an application
pursuant to sections 157.205, 157.208, 157.211 and 157.212 of the
Commission's regulations under the Natural Gas Act (NGA) as amended, to
construct and operate facilities necessary to deliver natural gas to
Bridgeline Holdings L.P. (Bridgeline) in Johnsons Bayou, Cameron
Parish, Louisiana, under Natural's blanket certificate issued in Docket
No. CP82-402-000,\1\ all as more fully set forth in the application
which is on file with the Commission and open to the public for
inspection.
---------------------------------------------------------------------------
\1\ 20 FERC ] 62,415 (1982).
---------------------------------------------------------------------------
Natural proposes to construct and operate a delivery interconnect
off its UTOS Lateral in order to deliver natural gas volumes to
Bridgeline. To accomplish this, Natural would construct and operate a
16-inch tap; approximately 530 feet of 12-inch diameter pipeline; a
metering platform; a dual 8-inch meter on the metering platform; and
such other appurtenant facilities required to effect the interconnects
to deliver up to 200,000 Dth/day of natural gas from its UTOS Lateral
to Bridgeline. Natural further states that it would construct
approximately 180 feet of 16-inch diameter interconnecting pipeline
between the metering facilities located on the platform and the UTOS
Lateral. Through the proposed piping, Natural would deliver natural gas
from the platform and metering equipment to Bridgeline's existing
pipeline system, where Bridgeline has already constructed the tap for
this interconnection. Natural would also construct certain section
2.55(a) non-
[[Page 32461]]
jurisdictional facilities, including a valve actuator, a meter tube
outlet valve, an instrument building, cathodic protection for all
piping and equipment. Natural also states that it would cost an
estimated $6,100,000 to construct the proposed facilities.
Any questions concerning this application may be directed to Bruce
H. Newsome, Vice President, Regulatory Products and Services, Natural
Gas Pipeline Company of America LLC, 3250 Lacey Road, 7th Floor,
Downers Grove, Illinois 60515-7918, or via telephone at (630) 725-3070,
or by e-mail [email protected].
This filing is available for review at the Commission or may be
viewed on the Commission's Web site at http://www.ferc.gov, using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number filed to access the document. For
assistance, please contact FERC Online Support at
[email protected] or call toll-free at (866) 206-3676, or, for
TTY, contact (202) 502-8659. Comments, protests and interventions may
be filed electronically via the Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. The Commission strongly encourages
intervenors to file electronically.
Any person or the Commission's staff may, within 60 days after
issuance of the instant notice by the Commission, file pursuant to rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the regulations under the NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the allowed time for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to section 7 of the NGA.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-13554 Filed 6-7-10; 8:45 am]
BILLING CODE 6717-01-P