NUCLEAR REGULATORY COMMISSION

[NRC-2010-0147; Dockets 72-1030, 50-335 and 50-389]


Florida Power and Light, St. Lucie Units 1 and 2; Independent 
Spent Fuel Storage Installation; Environmental Assessment and Finding 
of No Significant Impact

AGENCY: Nuclear Regulatory Commission.

ACTION: Issuance of an Environmental Assessment and Finding of No 
Significant Impact.

-----------------------------------------------------------------------

FOR FURTHER INFORMATION CONTACT: B. Jennifer Davis, Senior Project 
Manager, Division of Spent Fuel Storage and Transportation, Office of 
Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory 
Commission, Washington, DC 20555. Telephone: (301) 492-3371; Fax 
number: (301) 492-3342; e-mail: [email protected].

SUPPLEMENTARY INFORMATION: The U.S. Nuclear Regulatory Commission (NRC 
or Commission) is considering issuance of an exemption to Florida Power 
and Light (FPL or licensee) pursuant to 10 CFR 72.7 from specific 
provisions of 10 CFR 72.48(c)(1)(ii)(B), 72.212(a)(2), 
72.212(b)(2)(i)(A), 72.212(b)(7), and 72.214. FPL submitted its 
exemption request by letter dated January 12, 2010. FPL wants to load 
spent nuclear fuel into Transnuclear, Inc. (TN) NUHOMS[supreg] HD 
Storage System (HD-32PTH) dry storage casks, under the proposed 
Certificate of Compliance No. 1030 (CoC or Certificate) Amendment No. 
1. The spent fuel, once loaded into the casks, would be stored under 
FPL's general license in an Independent Spent Fuel Storage Installation 
(ISFSI) associated with the operation of FPL's nuclear power reactors, 
St. Lucie Units 1 and 2, located in St. Lucie County, Florida. FPL is 
requesting an exemption to use Amendment 1 to the NUHOMS[supreg] HD 
Storage System before Amendment 1 is final.

Environmental Assessment (EA)

    Identification of Proposed Action: The CoC is the NRC approved 
design for each dry storage cask system. The proposed action would 
exempt FPL from the requirements of 10 CFR 72.48(c)(1)(ii)(B), 
72.212(a)(2), 72.212(b)(2)(i)(A), 72.212(b)(7), and, 72.214, and enable 
FPL to use the TN NUHOMS[supreg] HD CoC 1030 Amendment 1 at St. Lucie 
Unit 1 and Unit 2. These regulations specifically require storage of 
spent nuclear fuel under a general license in dry storage casks 
approved under the provisions of 10 CFR part 72, and compliance with 
the terms and conditions set forth in the CoC for each dry spent fuel 
storage cask used by an ISFSI general licensee.
    The TN NUHOMS[supreg] HD CoC provides requirements, conditions and 
operating limits in Attachment A, Technical Specifications. Amendment 1 
proposes a change to the NUHOMS[supreg] HD system to include the 
addition of Combustion Engineering (CE) 16 x 16 fuel assemblies as 
approved contents, the addition of non-fuel assembly hardware as 
approved contents, and the addition of requirements to qualify metal 
matrix composite (MMC) neutron absorbers with integral aluminum 
cladding, along with some other minor changes. Technical staff in the 
Division of Spent Fuel Storage and Transportation (SFST) have completed 
their review of Amendment 1, and the preliminary Safety Evaluation 
Report (SER), draft CoC and associated draft Technical Specifications 
(TS) have been submitted to the NRC's rulemaking group. The preliminary 
SER, draft CoC and draft TS are expected to be published in the Federal 
Register as a direct final rule in May 2010, and the rule would be 
effective (and the Amendment would be approved), in August 2010, if the 
NRC does not receive any significant adverse comments during the public 
comment period.
    The proposed action would exempt FPL from the requirements of 10 
CFR 72.48(c)(1)(ii)(B), 72.212(a)(2), 72.212(b)(2)(i)(A), 72.212(b)(7), 
and 72.214, and would allow them to load spent fuel into the TN 
NUHOMS[supreg] HD 32PTH dry shielded canister under the terms of the 
proposed Amendment 1 to CoC 1030, prior to Amendment 1 being approved 
under the NRC rulemaking process described above.
    The NRC has determined that the exemption, if granted, will contain 
the following conditions:
    (1) The exemption pertains only to the cask loading campaigns 
(where spent fuel is transferred from the spent fuel pools to the 
casks) at the St. Lucie Unit 1 and Unit 2 ISFSI scheduled for the 
summer 2010, as identified in the FPL January 12, 2010 letter.
    (2) If the NRC receives significant adverse comments (as determined 
by the NRC) during the public comment period for the direct final rule, 
and as a result of such comments, changes to the preliminary SER, draft 
CoC, or draft TS are required, FPL will then be required to address 
those changes in a manner deemed satisfactory to NRC staff.
    Need for the Proposed Action: FPL requested this exemption in order 
to be

[[Page 18243]]

able to use the proposed Amendment 1 in its entirety for the St. Lucie 
Unit 1 and Unit 2 ISFSI fuel loading campaigns, scheduled to begin in 
July 2010. St. Lucie Unit 2 is currently scheduled to begin a refueling 
outage (RFO) in January 2011. During the Unit 2 RFO approximately 76 
fuel assemblies will be removed from the core for storage in the Unit 2 
spent fuel pool. Due to the addition of these 76 assemblies, when Unit 
2 is scheduled to restart in March 2011, FPL will no longer have full 
core offload capability. Similarly, for St. Lucie Unit 1, an RFO is 
scheduled to begin in August 2011. During the Unit 1 RFO, approximately 
88 irradiated fuel assemblies will be removed from the core for storage 
in the Unit 1 spent fuel pool. When Unit 1 is scheduled to restart in 
November 2011, FPL will no longer have full core offload capability for 
Unit 1. In addition, if fuel from the Unit 1 spent fuel pool is not 
transferred to the ISFSI prior to the Unit 1 RFO, there will not be 
sufficient room in the pool to pre-stage the 88 new fuel assemblies, 
complicating the fuel handling evolutions required for core reload 
during the Unit 1 RFO.
    In order to ensure that Unit 1 can retain full core offload 
capability, FPL plans to transfer 256 spent fuel assemblies from the 
current spent fuel storage inventories at Unit 1 and Unit 2 to the 
ISFSI prior to the Unit 2 RFO. These spent fuel assemblies will be 
placed from the spent fuel pool into 8 dry storage casks of 32 
assemblies each and then transferred to the ISFSI for interim, long-
term dry storage (the CoC expiration date, which is listed in 10 CFR 
72.214, is January 10, 2027; in accordance with the provisions of 10 
CFR 72.240, the certificate holder, TN, may apply for a renewal of the 
CoC).
    Rescheduling the spent fuel loading campaign for later in the year, 
after Amendment 1 to CoC 1030 is finalized would be difficult, and 
costly, given the existing planned sequence of events. FPL has 
scheduled personnel and training, and planned for equipment to support 
a practice dry run during the June/July 2010 time period, to be 
followed directly by the planned cask loading. The planned loading will 
then be followed closely by the Unit 2 RFO and restart, and then the 
Unit 1 RFO and restart.
    The proposed action is necessary because the NRC has not yet 
completed the rulemaking process required for final approval of TN 
NUHOMS[supreg] HD Amendment 1 to CoC 1030 and the current CoC 
(Amendment 0) for the TN NUHOMS[supreg] HD Storage System (HD-32PTH) 
does not include the necessary provisions for the planned loading 
campaigns. The staff has completed its technical review of the 
amendment application, has prepared a preliminary Safety Evaluation 
Report, and a proposed CoC with draft Technical Specifications. The 
documents have been forwarded to the NRC's rulemaking staff for 
publication in the Federal Register. The proposed rule is expected to 
be published for comment in the Federal Register in May 2010, and the 
rule would be effective (and the Amendment approved) in August 2010, 
following resolution of any public comments. Final approval of TN 
NUHOMS[supreg] HD Amendment 1 will not be completed in time for FPL to 
use Amendment 1 to CoC 1030 for their ISFSI loading campaign.
    Environmental Impacts of the Proposed Action: The NRC has completed 
its evaluation of the proposed action, and concludes that there will be 
no significant environmental impact if the exemption is granted. The 
staff has determined that the proposed action would not endanger life 
or property. The potential impact of using the NUHOMS[supreg] HD system 
was initially presented in the Environmental Assessment (EA) for the 
rulemaking to add the TN NUHOMS[supreg] HD Horizontal Modular Storage 
System for Irradiated Nuclear Fuel to the list of approved spent fuel 
storage casks in 10 CFR 72.214 (71 FR 25740, dated May 2, 2006 (Direct 
Final Rule) and 71 FR 71463, dated December 11, 2006 (Final Rule)).
    The staff performed a safety evaluation of the proposed exemption. 
The staff has determined that FPL's planned use of Amendment 1 to CoC 
1030 for their planned ISFSI loading campaign does not differ in any 
way from the provisions of the proposed Amendment, which has been 
approved by technical staff and which is currently in the rulemaking 
process. In addition, the staff has determined that the generic 
analysis supporting Amendment 1 to CoC 1030 would apply to the proposed 
action at the St. Lucie ISFSI site. The loading of spent nuclear fuel 
assemblies at St. Lucie Unit 1 and Unit 2 in accordance with the 
proposed Amendment 1 to CoC 1030 does not increase the probability or 
consequences of accidents. There are no changes being made in the types 
or amounts of any effluents that may be released offsite, and there is 
no significant increase in occupational or public radiation exposure as 
a result of the proposed activities. Therefore, there are no 
significant radiological environmental impacts associated with the 
proposed action. The proposed action only affects the requirements 
associated with the fuel assemblies that can be loaded in the casks and 
does not affect non-radiological plant effluents, or any other aspects 
of the environment. Therefore, there are no significant non-
radiological impacts associated with the proposed action.
    Accordingly, the Commission concludes that there are no significant 
environmental impacts associated with the proposed action.
    Alternative to the Proposed Action: Because there is no significant 
environmental impact associated with the proposed action, alternatives 
with equal or greater environmental impact were not evaluated. As an 
alternative to the proposed action, the staff considered denial of the 
proposed action. Denial of the exemption would result in no change in 
the current environmental impact.
    Agencies and Persons Consulted: This exemption request was 
discussed with Cindy Mulkey of the Florida Department of Environmental 
Protection, Siting Coordination Office, on March 12, 2010. She stated 
that the State had no comments on the technical aspects of the 
exemption. The NRC staff has determined that a consultation under 
Section 7 of the Endangered Species Act is not required because the 
proposed action will not affect listed species or a critical habitat. 
The NRC staff has also determined that the proposed action is not a 
type of activity having the potential to cause effects on historic 
properties. Therefore, no consultation is required under Section 106 of 
the National Historic Preservation Act.
    Conclusion: The staff has reviewed the exemption request submitted 
by FPL. Allowing loading of fuel assemblies at St. Lucie Unit 1 and 
Unit 2 under the proposed Amendment 1 to CoC 1030 would have no 
significant impact on the environment.

Finding of No Significant Impact

    The environmental impacts of the proposed action have been reviewed 
in accordance with the requirements set forth in 10 CFR part 51. Based 
upon the foregoing Environmental Assessment, the Commission finds that 
the proposed action of granting the exemption from specific provisions 
of 10 CFR 72.48(c)(1)(ii)(B), 72.212(a)(2), 72.212(b)(2)(i)(A), 
72.212(b)(7), and 72.214, to allow FPL to load spent nuclear fuel 
assemblies at St. Lucie Unit 1 and Unit 2 under the proposed Amendment 
1 to CoC 1030, subject to conditions described above, will not 
significantly impact the quality of the human environment. Accordingly, 
the Commission has determined that an

[[Page 18244]]

environmental impact statement for the proposed exemption is not 
warranted.
    In accordance with 10 CFR 2.390 of NRC's ``Rules of Practice,'' 
final NRC records and documents regarding this proposed action are 
publicly available in the records component of NRC's Agencywide 
Documents Access and Management System (ADAMS). The request for 
exemption dated January 12, 2010 (ML100141456), was docketed under 10 
CFR part 50, Docket Nos. 50-335 and 50-389, and under 10 CFR part 72, 
Docket No. 72-1030. These documents may be inspected at NRC's Public 
Electronic Reading Room at http://www.nrc.gov/reading-rm/adams.html. 
These documents may also be viewed electronically on the public 
computers located at the NRC's Public Document Room (PDR), O1F21, One 
White Flint North, 11555 Rockville Pike, Rockville, MD 20852. The PDR 
reproduction contractor will copy documents for a fee. Persons who do 
not have access to ADAMS, or who encounter problems in accessing the 
documents located in ADAMS, should contact the NRC PDR Reference staff 
by telephone at 1-800-397-4209, or (301) 415-4737, or by e-mail to 
[email protected].

    Dated at Rockville, Maryland, this 31st day of March. 2010.

    For the Nuclear Regulatory Commission.
B. Jennifer Davis,
Senior Project Manager, Division of Spent Fuel Storage and 
Transportation, Office of Nuclear Material Safety and Safeguards.