[Federal Register Volume 75, Number 53 (Friday, March 19, 2010)]
[Notices]
[Pages 13314-13318]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2010-6071]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 50-269, 50-270, and 50-287; NRC-2010-0102]
Duke Energy Carolinas, LLC; Notice of Consideration of Issuance
of Amendments to Facility Operating License, Proposed No Significant
Hazards Consideration Determination, and Opportunity for a Hearing and
Order Imposing Procedures for Access to Sensitive Unclassified Non-
Safeguards Information
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is
considering issuance of an amendment to Renewed Facility Operating
Licenses DPR-38, DPR-47, and DPR-55, issued to Duke Energy Carolinas,
LLC (the licensee), for operation of the Oconee Nuclear Station, Units
1, 2, and 3, located in Oconee County, South Carolina.
The proposed amendment would change the Technical Specifications
(TSs) to allow the use of methodology report DPC-NE-1006-P, ``Oconee
Nuclear Design Methodology Using CASMO-4/SIMULATE-3.'' The amendment
application dated June 10, 2009, as supplemented December 18, 2009,
contains sensitive unclassified non-safeguards information (SUNSI).
Before issuance of the proposed license amendment, the Commission
will have made findings required by the Atomic Energy Act of 1954, as
amended (the Act), and the Commission's regulations.
The Commission has made a proposed determination that the amendment
request involves no significant hazards consideration. Under the
Commission's regulations in Title 10 of the Code of Federal Regulations
(10 CFR), Section 50.92, this means that operation of the facility in
accordance with the proposed amendment would not (1) involve a
significant increase in the probability or consequences of an accident
previously evaluated; or (2) create the possibility of a new or
different kind of accident from any accident previously evaluated; or
(3) involve a significant reduction in a margin of safety. As required
by 10 CFR 50.91(a), the licensee has provided its analysis of the issue
of no significant hazards consideration, which is presented below:
(1) Involve a significant increase in the probability or
consequences of an accident previously evaluated.
The proposed change to allow the use of the CASMO-4/SIMULATE-3
reload design software to analyze reactor cores with fuel containing
lumped burnable and/or gadolinia integral absorbers does not involve
a significant increase in the probability or consequences of an
accident previously evaluated. The CASMO-4/SIMULATE-3 codes are used
to perform reactivity and power distribution calculations to develop
power distribution limits and provide confirmation of reactivity and
power distribution input assumptions used in the evaluation of UFSAR
Chapter 15 accidents. The SIMULATE-3 code is also used to confirm
the acceptability of thermal limits at post accident conditions.
The benchmark calculations performed verified the acceptability
of the CASMO-4/SIMULATE-3 code for performing reload design
calculations for reactor cores containing both lumped burnable and/
or gadolinia integral absorbers. These calculations confirmed the
accuracy of the codes and developed a methodology for calculating
power distribution uncertainties for use in reload design
calculations. The use of appropriate power distribution
uncertainties applicable to core designs in conjunction with
predicted peaking factors ensures that thermal accident acceptance
criteria are satisfied.
Therefore, the proposed amendment does not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
(2) Create the possibility of a new or different kind of
accident from any accident previously evaluated.
The benchmark calculations performed verified the acceptability
of the CASMO-4/SIMULATE-3 code for performing reload design
calculations for reactor cores containing both lumped burnable and/
or gadolinia integral absorbers. These calculations confirmed the
accuracy of the codes and developed a methodology for calculating
power distribution uncertainties for use in reload design
calculations.
The application of the CASMO-4/SIMULATE-3 reload design software
to perform reload design calculations for reactor cores containing
lumped burnable and/or gadolinia integral absorbers will not create
the possibility of a new or different kind of accident from any
accident previously evaluated. The CASMO-4/SIMULATE-3 software is
not installed in plant equipment and therefore the software is
incapable of initiating an equipment malfunction that would result
in a new or different type of accident from any previously
evaluated. The evaluation of accidents and the associated acceptance
criteria for these accidents remains unchanged.
(3) Involve a significant reduction in a margin of safety.
The application of the CASMO-4/SIMULATE-3 reload design software
to perform reload design calculations for reactor cores containing
lumped burnable and/or gadolinia integral absorbers will not involve
a significant reduction in a margin of safety.
Margin of safety is related to the confidence in the ability of
the fission product barriers to perform their design function during
and following an accident. These barriers include the fuel cladding,
the reactor coolant system and the containment system. The reload
design process assures the acceptability of thermal limits under
normal, transient, and accident conditions. The CASMO-4/SIMULATE-
reload design software was qualified for the analysis of reactor
cores containing lumped burnable and/or gadolinia integral absorbers
and a methodology for developing appropriate power distribution
uncertainties for application in reload design analyses was
developed. The use of these uncertainties for analysis of reload
cores ensures that design and safety limits are satisfied such that
the fission product barriers perform their design function.
Therefore, the proposed amendment does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
The Commission is seeking public comments on this proposed
determination. Any comments received within 30 days after the date of
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendment until the
expiration of 60 days after the date of publication of this notice. The
Commission may issue the license amendment before expiration of the 60-
day period provided that its final determination is that the amendment
involves no significant hazards consideration. In addition, the
Commission may issue the amendment prior to the expiration of the 30-
day comment period should circumstances change during the 30-day
comment period such that failure to act in a
[[Page 13315]]
timely way would result, for example, in derating or shutdown of the
facility. Should the Commission take action prior to the expiration of
either the comment period or the notice period, it will publish in the
Federal Register a notice of issuance. Should the Commission make a
final No Significant Hazards Consideration Determination, any hearing
will take place after issuance. The Commission expects that the need to
take this action will occur very infrequently.
Written comments may be submitted by mail to the Chief, Rulemaking
and Directives Branch (RDB), TWB-05-B01M, Division of Administrative
Services, Office of Administration, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, and should cite the publication date and
page number of this Federal Register notice. Written comments may also
be faxed to the RDB at 301-492-3446. Documents may be examined, and/or
copied for a fee, at the NRC's Public Document Room (PDR), located at
One White Flint North, Room O1 F21, 11555 Rockville Pike (first floor),
Rockville, Maryland.
Within 60 days after the date of publication of this notice, any
person(s) whose interest may be affected by this action may file a
request for a hearing and a petition to intervene with respect to
issuance of the amendment to the subject facility operating license.
Requests for a hearing and a petition for leave to intervene shall be
filed in accordance with the Commission's ``Rules of Practice for
Domestic Licensing Proceedings'' in 10 CFR Part 2. Interested person(s)
should consult a current copy of 10 CFR 2.309, which is available at
the NRC's PDR. Publicly available records will be accessible from the
Agencywide Documents Access and Management System's (ADAMS) Public
Electronic Reading Room on the Internet at the NRC Web site, http://www.nrc.gov/reading-rm/doc-collections/cfr/. If a request for a
hearing or petition for leave to intervene is filed by the above date,
the Commission or a presiding officer designated by the Commission or
by the Chief Administrative Judge of the Atomic Safety and Licensing
Board Panel, will rule on the request and/or petition; and the
Secretary or the Chief Administrative Judge of the Atomic Safety and
Licensing Board will issue a notice of a hearing or an appropriate
order.
As required by 10 CFR 2.309, a petition for leave to intervene
shall set forth with particularity the interest of the petitioner in
the proceeding, and how that interest may be affected by the results of
the proceeding. The petition should specifically explain the reasons
why intervention should be permitted with particular reference to the
following general requirements: (1) The name, address and telephone
number of the requestor or petitioner; (2) the nature of the
requestor's/petitioner's right under the Act to be made a party to the
proceeding; (3) the nature and extent of the requestor's/petitioner's
property, financial, or other interest in the proceeding; and (4) the
possible effect of any decision or order which may be entered in the
proceeding on the requestor's/petitioner's interest. The petition must
also identify the specific contentions which the requestor/petitioner
seeks to have litigated at the proceeding.
Each contention must consist of a specific statement of the issue
of law or fact to be raised or controverted. In addition, the
requestor/petitioner shall provide a brief explanation of the bases for
the contention and a concise statement of the alleged facts or expert
opinion which support the contention and on which the petitioner
intends to rely in proving the contention at the hearing. The
requestor/petitioner must also provide references to those specific
sources and documents of which the petitioner is aware and on which the
petitioner intends to rely to establish those facts or expert opinion.
The petition must include sufficient information to show that a genuine
dispute exists with the applicant on a material issue of law or fact.
Contentions shall be limited to matters within the scope of the
amendment under consideration. The contention must be one which, if
proven, would entitle the petitioner to relief. A requestor/petitioner
who fails to satisfy these requirements with respect to at least one
contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene,
and have the opportunity to participate fully in the conduct of the
hearing.
If a hearing is requested, the Commission will make a final
determination on the issue of no significant hazards consideration. The
final determination will serve to decide when the hearing is held. If
the final determination is that the amendment request involves no
significant hazards consideration, the Commission may issue the
amendment and make it immediately effective, notwithstanding the
request for a hearing. Any hearing held would take place after issuance
of the amendment. If the final determination is that the amendment
request involves a significant hazards consideration, any hearing held
would take place before the issuance of any amendment.
All documents filed in NRC adjudicatory proceedings, including a
request for hearing, a petition for leave to intervene, any motion or
other document filed in the proceeding prior to the submission of a
request for hearing or petition to intervene, and documents filed by
interested governmental entities participating under 10 CFR 2.315(c),
must be filed in accordance with the NRC E-Filing rule (72 FR 49139,
August 28, 2007). The E-Filing process requires participants to submit
and serve all adjudicatory documents over the Internet, or in some
cases to mail copies on electronic storage media. Participants may not
submit paper copies of their filings unless they seek an exemption in
accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least
ten (10) days prior to the filing deadline, the participant should
contact the Office of the Secretary by e-mail at
[email protected], or by telephone at (301) 415-1677, to request
(1) a digital ID certificate, which allows the participant (or its
counsel or representative) to digitally sign documents and access the
E-Submittal server for any proceeding in which it is participating; and
(2) advise the Secretary that the participant will be submitting a
request or petition for hearing (even in instances in which the
participant, or its counsel or representative, already holds an NRC-
issued digital ID certificate). Based upon this information, the
Secretary will establish an electronic docket for the hearing in this
proceeding if the Secretary has not already established an electronic
docket.
Information about applying for a digital ID certificate is
available on NRC's public Web site at http://www.nrc.gov/site-help/e-submittals/apply-certificates.html. System requirements for accessing
the E-Submittal server are detailed in NRC's ``Guidance for Electronic
Submission,'' which is available on the agency's public Web site at
http://www.nrc.gov/site-help/e-submittals.html. Participants may
attempt to use other software not listed on the Web site, but should
note that the NRC's E-Filing system does not support unlisted software,
and the NRC Meta System Help Desk will not be able to offer assistance
in using unlisted software.
[[Page 13316]]
If a participant is electronically submitting a document to the NRC
in accordance with the E-Filing rule, the participant must file the
document using the NRC's online, Web-based submission form. In order to
serve documents through EIE, users will be required to install a Web
browser plug-in from the NRC Web site. Further information on the Web-
based submission form, including the installation of the Web browser
plug-in, is available on the NRC's public Web site at http://www.nrc.gov/site-help/e-submittals.html.
Once a participant has obtained a digital ID certificate and a
docket has been created, the participant can then submit a request for
hearing or petition for leave to intervene. Submissions should be in
Portable Document Format (PDF) in accordance with NRC guidance
available on the NRC public Web site at http://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the time the
documents are submitted through the NRC's E-Filing system. To be
timely, an electronic filing must be submitted to the E-Filing system
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of
a transmission, the E-Filing system time-stamps the document and sends
the submitter an e-mail notice confirming receipt of the document. The
E-Filing system also distributes an e-mail notice that provides access
to the document to the NRC Office of the General Counsel and any others
who have advised the Office of the Secretary that they wish to
participate in the proceeding, so that the filer need not serve the
documents on those participants separately. Therefore, applicants and
other participants (or their counsel or representative) must apply for
and receive a digital ID certificate before a hearing request/petition
to intervene is filed so that they can obtain access to the document
via the E-Filing system.
A person filing electronically using the agency's adjudicatory E-
Filing system may seek assistance by contacting the NRC Meta System
Help Desk through the ``Contact Us'' link located on the NRC Web site
at http://www.nrc.gov/site-help/e-submittals.html, by e-mail at
[email protected], or by a toll-free call at (866) 672-7640. The
NRC Meta System Help Desk is available between 8 a.m. and 8 p.m.,
Eastern Time, Monday through Friday, excluding government holidays.
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, Sixteenth
Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland
20852, Attention: Rulemaking and Adjudications Staff. Participants
filing a document in this manner are responsible for serving the
document on all other participants. Filing is considered complete by
first-class mail as of the time of deposit in the mail, or by courier,
express mail, or expedited delivery service upon depositing the
document with the provider of the service. A presiding officer, having
granted an exemption request from using E-Filing, may require a
participant or party to use E-Filing if the presiding officer
subsequently determines that the reason for granting the exemption from
use of E-Filing no longer exists.
Documents submitted in adjudicatory proceedings will appear in
NRC's electronic hearing docket which is available to the public at
http://ehd.nrc.gov/EHD_Proceeding/home.asp, unless excluded pursuant
to an order of the Commission, or the presiding officer. Participants
are requested not to include personal privacy information, such as
social security numbers, home addresses, or home phone numbers in their
filings, unless an NRC regulation or other law requires submission of
such information. With respect to copyrighted works, except for limited
excerpts that serve the purpose of the adjudicatory filings and would
constitute a Fair Use application, participants are requested not to
include copyrighted materials in their submission.
Petitions for leave to intervene must be filed no later than 60
days from the date of publication of this notice. Non-timely filings
will not be entertained absent a determination by the presiding officer
that the petition or request should be granted or the contentions
should be admitted, based on a balancing of the factors specified in 10
CFR 2.309(c)(1)(i)-(viii).
For further details with respect to this license amendment
application, see the application for amendment dated June 10, 2009, as
supplemented December 18, 2009, which is available for public
inspection at the Commission's PDR, located at One White Flint North,
File Public Area O1 F21, 11555 Rockville Pike (first floor), Rockville,
Maryland. Publicly available records will be accessible electronically
from the Agencywide Documents Access and Management System's (ADAMS)
Public Electronic Reading Room on the Internet at the NRC Web site,
http://www.nrc.gov/reading-rm/adams.html. Persons who do not have
access to ADAMS or who encounter problems in accessing the documents
located in ADAMS, should contact the NRC PDR Reference staff by
telephone at 1-800-397-4209, 301-415-4737, or by e-mail to
[email protected].
Attorney for Licensee: Ms. Lisa F. Vaughn, Associate General
Counsel and Managing Attorney, Duke Energy Carolinas, LLC, 526 South
Church Street, EC07H, Charlotte, NC 28202.
Order Imposing Procedures for Access to Sensitive Unclassified Non-
Safeguards Information for Contention Preparation
A. This Order contains instructions regarding how potential parties
to this proceeding may request access to documents containing Sensitive
Unclassified Non-Safeguards Information (SUNSI).
B. Within 10 days after publication of this notice of hearing and
opportunity to petition for leave to intervene, any potential party who
believes access to SUNSI is necessary to respond to this notice may
request such access. A ``potential party'' is any person who intends to
participate as a party by demonstrating standing and filing an
admissible contention under 10 CFR 2.309. Requests for access to SUNSI
submitted later than 10 days after publication will not be considered
absent a showing of good cause for the late filing, addressing why the
request could not have been filed earlier.
C. The requestor shall submit a letter requesting permission to
access SUNSI to the Office of the Secretary, U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, Attention: Rulemakings and
Adjudications Staff, and provide a copy to the Associate General
Counsel for Hearings, Enforcement and Administration, Office of the
General Counsel, Washington, DC 20555-0001. The expedited delivery or
courier mail address for both offices is: U.S. Nuclear Regulatory
Commission, 11555 Rockville Pike, Rockville, Maryland 20852. The e-mail
address for the Office of the Secretary and the Office of the General
Counsel are [email protected] and
[[Page 13317]]
[email protected], respectively.\1\ The request must include the
following information:
---------------------------------------------------------------------------
\1\ While a request for hearing or petition to intervene in this
proceeding must comply with the filing requirements of the NRC's
``E-Filing Rule,'' the initial request to access SUNSI under these
procedures should be submitted as described in this paragraph.
---------------------------------------------------------------------------
(1) A description of the licensing action with a citation to this
Federal Register notice;
(2) The name and address of the potential party and a description
of the potential party's particularized interest that could be harmed
by the action identified in C.(1);
(3) The identity of the individual or entity requesting access to
SUNSI and the requestor's basis for the need for the information in
order to meaningfully participate in this adjudicatory proceeding. In
particular, the request must explain why publicly available versions of
the information requested would not be sufficient to provide the basis
and specificity for a proffered contention;
D. Based on an evaluation of the information submitted under
paragraph C.(3) the NRC staff will determine within 10 days of receipt
of the request whether:
(1) There is a reasonable basis to believe the petitioner is likely
to establish standing to participate in this NRC proceeding; and
(2) The requestor has established a legitimate need for access to
SUNSI.
E. If the NRC staff determines that the requestor satisfies both
D.(1) and D.(2) above, the NRC staff will notify the requestor in
writing that access to SUNSI has been granted. The written notification
will contain instructions on how the requestor may obtain copies of the
requested documents, and any other conditions that may apply to access
to those documents. These conditions may include, but are not limited
to, the signing of a Non-Disclosure Agreement or Affidavit, or
Protective Order \2\ setting forth terms and conditions to prevent the
unauthorized or inadvertent disclosure of SUNSI by each individual who
will be granted access to SUNSI.
---------------------------------------------------------------------------
\2\ Any motion for Protective Order or draft Non-Disclosure
Affidavit or Agreement for SUNSI must be filed with the presiding
officer or the Chief Administrative Judge if the presiding officer
has not yet been designated, within 30 days of the deadline for the
receipt of the written access request.
---------------------------------------------------------------------------
F. Filing of Contentions. Any contentions in these proceedings that
are based upon the information received as a result of the request made
for SUNSI must be filed by the requestor no later than 25 days after
the requestor is granted access to that information. However, if more
than 25 days remain between the date the petitioner is granted access
to the information and the deadline for filing all other contentions
(as established in the notice of hearing or opportunity for hearing),
the petitioner may file its SUNSI contentions by that later deadline.
G. Review of Denials of Access.
(1) If the request for access to SUNSI is denied by the NRC staff
either after a determination on standing and need for access, or after
a determination on trustworthiness and reliability, the NRC staff shall
immediately notify the requestor in writing, briefly stating the reason
or reasons for the denial.
(2) The requestor may challenge the NRC staff's adverse
determination by filing a challenge within 5 days of receipt of that
determination with: (a) The presiding officer designated in this
proceeding; (b) if no presiding officer has been appointed, the Chief
Administrative Judge, or if he or she is unavailable, another
administrative judge, or an administrative law judge with jurisdiction
pursuant to 10 CFR 2.318(a); or (c) if another officer has been
designated to rule on information access issues, with that officer.
H. Review of Grants of Access. A party other than the requestor may
challenge an NRC staff determination granting access to SUNSI whose
release would harm that party's interest independent of the proceeding.
Such a challenge must be filed with the Chief Administrative Judge
within 5 days of the notification by the NRC staff of its grant of
access.
If challenges to the NRC staff determinations are filed, these
procedures give way to the normal process for litigating disputes
concerning access to information. The availability of interlocutory
review by the Commission of orders ruling on such NRC staff
determinations (whether granting or denying access) is governed by 10
CFR 2.311.\3\
---------------------------------------------------------------------------
\3\ Requestors should note that the filing requirements of the
NRC's E-Filing Rule (72 FR 49139; August 28, 2007) apply to appeals
of NRC staff determinations (because they must be served on a
presiding officer or the Commission, as applicable), but not to the
initial SUNSI request submitted to the NRC staff under these
procedures.
---------------------------------------------------------------------------
I. The Commission expects that the NRC staff and presiding officers
(and any other reviewing officers) will consider and resolve requests
for access to SUNSI, and motions for protective orders, in a timely
fashion in order to minimize any unnecessary delays in identifying
those petitioners who have standing and who have propounded contentions
meeting the specificity and basis requirements in 10 CFR Part 2.
Attachment 1 to this Order summarizes the general target schedule for
processing and resolving requests under these procedures.
It is so ordered.
Dated at Rockville, Maryland, this 15th day of March 2010.
For the Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.
Attachment 1--General Target Schedule for Processing and Resolving
Requests for Access to Sensitive Unclassified Non-Safeguards
Information in This Proceeding
------------------------------------------------------------------------
Day Event/Activity
------------------------------------------------------------------------
0............................ Publication of Federal Register notice of
hearing and opportunity to petition for
leave to intervene, including order with
instructions for access requests.
10........................... Deadline for submitting requests for
access to Sensitive Unclassified Non-
Safeguards Information (SUNSI) with
information: supporting the standing of
a potential party identified by name and
address; describing the need for the
information in order for the potential
party to participate meaningfully in an
adjudicatory proceeding.
60........................... Deadline for submitting petition for
intervention containing: (i)
Demonstration of standing; (ii) all
contentions whose formulation does not
require access to SUNSI (+25 Answers to
petition for intervention; +7 requestor/
petitioner reply).
20........................... Nuclear Regulatory Commission (NRC) staff
informs the requestor of the staff's
determination whether the request for
access provides a reasonable basis to
believe standing can be established and
shows need for SUNSI. (NRC staff also
informs any party to the proceeding
whose interest independent of the
proceeding would be harmed by the
release of the information.) If NRC
staff makes the finding of need for
SUNSI and likelihood of standing, NRC
staff begins document processing
(preparation of redactions or review of
redacted documents).
[[Page 13318]]
25........................... If NRC staff finds no ``need'' or no
likelihood of standing, the deadline for
requestor/petitioner to file a motion
seeking a ruling to reverse the NRC
staff's denial of access; NRC staff
files copy of access determination with
the presiding officer (or Chief
Administrative Judge or other designated
officer, as appropriate). If NRC staff
finds ``need'' for SUNSI, the deadline
for any party to the proceeding whose
interest independent of the proceeding
would be harmed by the release of the
information to file a motion seeking a
ruling to reverse the NRC staff's grant
of access.
30........................... Deadline for NRC staff reply to motions
to reverse NRC staff determination(s).
40........................... (Receipt +30) If NRC staff finds standing
and need for SUNSI, deadline for NRC
staff to complete information processing
and file motion for Protective Order and
draft Non-Disclosure Affidavit. Deadline
for applicant/licensee to file Non-
Disclosure Agreement for SUNSI.
A............................ If access granted: Issuance of presiding
officer or other designated officer
decision on motion for protective order
for access to sensitive information
(including schedule for providing access
and submission of contentions) or
decision reversing a final adverse
determination by the NRC staff.
A + 3........................ Deadline for filing executed Non-
Disclosure Affidavits. Access provided
to SUNSI consistent with decision
issuing the protective order.
A + 28....................... Deadline for submission of contentions
whose development depends upon access to
SUNSI. However, if more than 25 days
remain between the petitioner's receipt
of (or access to) the information and
the deadline for filing all other
contentions (as established in the
notice of hearing or opportunity for
hearing), the petitioner may file its
SUNSI contentions by that later
deadline.
A + 53....................... (Contention receipt +25) Answers to
contentions whose development depends
upon access to SUNSI.
A + 60....................... (Answer receipt +7) Petitioner/Intervenor
reply to answers.
>A + 60...................... Decision on contention admission.
------------------------------------------------------------------------
[FR Doc. 2010-6071 Filed 3-18-10; 8:45 am]