NUCLEAR REGULATORY COMMISSION
[Docket No. 50-302, License No. DPR-72; Docket No. 50-302, NRC-2010-
0096]
Florida Power Corporation, City of Alachua, City of Bushnell,
City of Gainesville, City of Kissimmee, City of Leesburg, City of New
Smyrna Beach and Utilities Commission, City of New Smyrna Beach, City
of Ocala, Orlando Utilities Commission and City of Orlando, Seminole
Electric Cooperative, Inc., Crystal River Unit 3 Nuclear Generating
Plant; Receipt of Request for Action Under 10 CFR 2.206
Notice is hereby given that by petition dated December 5, 2009, Mr.
Thomas Saporito (petitioner) has requested that the U.S. Nuclear
Regulatory Commission (NRC) take action with regard to the licensee for
the Crystal River Unit 3 Nuclear Generating Plant (CR-3). The
petitioner requests that NRC take enforcement action against the
licensee and issue a Confirmatory Order requiring that the licensee
take the following actions at CR-3:
1. Physically remove the outer 10 inches of concrete surrounding
the CR-3 containment building from the top of the containment building
to the bottom of the containment building and encompassing 360 degrees
around the entire containment building;
2. Test samples of the concrete removed from the CR-3 containment
building for composition and compare the test results to a sample of
concrete
[[Page 11581]]
from a similarly designed facility like the Florida Power and Light
Company, Turkey Point Nuclear Plant;
3. Maintain the CR-3 in cold-shutdown mode until such time as the
licensee can demonstrate full compliance with its NRC operating license
for CR-3 within the safety margins delineated in the licensee's Final
Safety Analysis Report (FSAR) and within the CR-3 site-specific
technical specifications; and
4. Provide the public with an opportunity to intervene at a public
hearing before the NRC Atomic Safety and Licensing Board to challenge
any certification made by the licensee to NRC that it has reestablished
full compliance with 10 CFR part 50 and the safety margins delineated
in its FSAR and technical specifications.
In addition, during the January 7, 2010, conference call, the
petitioner supplemented his December 5, 2009, petition with a verbal
request to require the licensee to reform the containment building with
additional concrete. The Petition Review Board (PRB) determined that
this request supplements Item 1.
As the basis for the request:
1. The petitioner stated that during a maintenance activity
performed under the direction and authorization of the licensee to cut
an opening in the CR-3 containment building for access to replace steam
generator units, the CR-3 containment building was discovered to have
one or more separations between the poured concrete perimeter wall of
the containment building and the horizontally installed tendons placed
from top to bottom around the containment building within 10 inches of
the outermost part of the 42-inch thick concrete perimeter wall of the
containment building. To date, the licensee has not been able to
determine the ``root-cause'' of this structural failure.
2. The petitioner stated that the licensee is currently engaged in
conducting Impulse Testing of the remaining CR-3 containment building
perimeter wall to determine if additional separations exist. However,
the petitioner implies that the licensee's use of Impulse Testing is
not sufficient to make such a determination. Notably, Impact Echo
testing is used worldwide to determine concrete cracking and failures
on public bridges and the like, but even this type of testing is not
sufficient to fully validate the entirety of the CR-3 containment
building. Moreover, the petitioner believes that even the use of
destructive testing to make visual inspections of small areas of the
CR-3 containment building is not sufficient to qualify the entirety of
the containment building.
3. The petitioner stated that removal of 10 inches of concrete from
the outer part of the 42-inch containment building wall from top to
bottom and 360-degrees around would effectively expose the entirety of
the surrounding 5\1/4\-inch tendons and allow visual inspection of the
inner side of the tendons to make certain that no separation between
the tendons and the inner part of the concrete wall exist.
4. The petitioner stated that removal of 10-inches of concrete from
the outer part of the 42-inch containment building wall from top to
bottom and 360 degrees around would ensure for the best possible
adhesion of a new concrete pour to the existing inner concrete
perimeter wall of the containment building.
5. The petitioner stated that the licensee's FSAR requires that the
CR-3 containment building be composed of a monolithic concrete
perimeter wall. The petitioner believes that the only way the licensee
can fully achieve compliance with its FSAR is to remove 10 inches of
concrete from the outer part of the 42-inch containment building wall
from top to bottom and 360 degrees around for proper visual inspect
repair activities.
Moreover, during the January 7, 2010, conference call, the
petitioner implied that a design flaw may have occurred, meaning the
actual design of this containment structure has those tendons placed
within 10 inches of the exterior part of that 42-inch thick concrete
wall; the design may itself be flawed and subject the entire structure
to other cracks, fissures, and voids that the licensee simply cannot
detect with any type of instrumentation to make certain of their
nonexistence. Therefore, the petitioner requested that the CR-3
containment building not only meet but exceed its original design basis
as delineated in the FSAR.
The PRB discussed the petitioner's request during internal meetings
and made the initial PRB recommendation. The PRB's initial
recommendation is as follows:
Item 1, as supplemented by the January 7, 2010, conference
call, does not meet the NRC Management Directive 8.11, ``Review Process
for 10 CFR 2.206 Petitions'' (MD 8.11), criteria for further review
under the 10 CFR 2.206 process in that sufficient facts have not been
provided to support the request.
Item 2 does not meet the MD 8.11 criteria for further
review under the 10 CFR 2.206 process in that sufficient facts have not
been provided to support the request.
Item 3 meets the criteria established in MD 8.11 for
acceptance into the 10 CFR 2.206 process for the petition under
consideration.
Item 4 does not meet the MD 8.11 criteria for further
review under the 10 CFR 2.206 process in that the request has not
specifically addressed an enforcement-related action.
On February 2, 2010, the petition manager informed the petitioner
of the PRB's initial recommendation and offered him a second
opportunity to address the PRB. On February 12, 2010, the petitioner
declined the opportunity to address the PRB and did not provide any
additional information for the PRB's consideration. Therefore, the
PRB's initial recommendation, as discussed above, is the PRB's final
recommendation.
NRC is treating Item 3 of the petitioner's request pursuant to 10
CFR 2.206, ``Requests for Action under This Subpart.'' The request has
been referred to the Director of the Office of Nuclear Reactor
Regulation. As provided by Section 2.206, NRC will take appropriate
action on this petition within a reasonable time. A copy of the
petition is available for inspection at the Commission's Public
Document Room (PDR) located at One White Flint North, Public File Area
O1 F21, 11555 Rockville Pike (first floor), Rockville, MD. Publicly
available records related to this action will be accessible from the
Agencywide Documents Access and Management System (ADAMS) Public
Electronic Reading Room on the Internet at the NRC Web site, http://www.nrc.gov/reading-rm/adams.html. Persons who do not have access to
ADAMS or who encounter problems in accessing the documents located in
ADAMS should contact the NRC PDR reference staff by telephone at 1-800-
397-4209 or 301-415-4737 or by e-mail to [email protected]. The
ADAMS accession number for the incoming petition request is
ML093430702.
Dated at Rockville, Maryland, this 4th day of March, 2010.
For the U.S. Nuclear Regulatory Commission.
Eric J. Leeds,
Director, Office of Nuclear Reactor Regulation.