NUCLEAR REGULATORY COMMISSION
[Docket No. 50-397; NRC-2010-0084]
Energy Northwest; Columbia Generating Station; Environmental
Assessment and Finding of No Significant Impact
The U.S. Nuclear Regulatory Commission (NRC) is considering
issuance of an exemption, pursuant to Title 10 of the Code of Federal
Regulations (10 CFR) Section 73.5, ``Specific exemptions,'' from the
implementation date for one new requirement of 10 CFR part 73,
``Physical protection of plants and materials,'' for Facility Operating
License No. DPR-46, issued to Energy Northwest (the licensee), for
operation of the Columbia Generating Station (CGS), located in Benton
County, Washington. Therefore, as required by 10 CFR 51.21, the NRC
performed an environmental assessment. Based on the results of the
environmental assessment, the NRC is issuing a finding of no
significant impact.
Environmental Assessment
Identification of the Proposed Action
The proposed action would exempt Energy Northwest from the required
implementation date of March 31, 2010, for one new requirement of 10
CFR part 73. Specifically, Energy Northwest would be granted an
exemption from being in full compliance with a new requirement
contained in 10 CFR 73.55 by the March 31, 2010, deadline. Energy
Northwest has proposed an alternate full compliance implementation date
of May 15, 2010, 45 days beyond the date required by 10 CFR part 73.
The proposed action, an extension of the schedule for completion of one
action required by the revised 10 CFR part 73, does not involve any
physical changes to the reactor, fuel, plant structures, support
structures, water, or land at the Energy Northwest site.
The proposed action is in accordance with the licensee's
application dated January 27, 2010.
The Need for the Proposed Action
The proposed action is needed to provide the licensee with
additional time to perform the required upgrades to the Energy
Northwest security system due to manufacturing delays of one item at
the vendor.
Environmental Impacts of the Proposed Action
The NRC has completed its environmental assessment of the proposed
exemption. The staff has concluded that the proposed action to extend
the implementation deadline would not significantly affect plant safety
and would not have a significant adverse effect on the probability of
an accident occurring.
The proposed action would not result in an increased radiological
hazard beyond those previously analyzed in the environmental assessment
and finding of no significant impact made by the Commission in
promulgating its revisions to 10 CFR part 73 as discussed in a Federal
Register notice dated March 27, 2009 (74 FR 13926). There will be no
change to radioactive effluents that affect radiation exposures to
plant workers and members of the public. Therefore, no changes or
different types of radiological impacts are expected as a result of the
proposed exemption.
The proposed action does not result in changes to land use or water
use, or result in changes to the quality or quantity of non-
radiological effluents. No changes to the National Pollution Discharge
Elimination System permit are needed. No effects on the aquatic or
terrestrial habitat in the vicinity of the plant, or to threatened,
endangered, or protected species under the Endangered Species Act, or
impacts to essential fish habitat covered by the Magnuson-
[[Page 10835]]
Steven's Act are expected. There are no impacts to the air or ambient
air quality.
There are no impacts to historical and cultural resources. There
would be no impact to socioeconomic resources. Therefore, no changes to
or different types of non-radiological environmental impacts are
expected as a result of the proposed exemption.
Accordingly, the NRC concludes that there are no significant
environmental impacts associated with the proposed action. In addition,
in promulgating its revisions to 10 CFR part 73, the Commission
prepared an environmental assessment and published a finding of no
significant impact [Part 73, Power Reactor Security Requirements, 74 FR
13926 (March 27, 2009)].
The NRC staff's safety evaluation will be provided in the exemption
that will be issued as part of the letter to the licensee approving the
exemption to the regulation, if granted.
Environmental Impacts of the Alternatives to the Proposed Action
As an alternative to the proposed actions, the NRC staff considered
denial of the proposed action (i.e., the ``no-action'' alternative).
Denial of the exemption request would result in no change in current
environmental impacts. If the proposed action was denied, the licensee
would have to comply with the March 31, 2010, implementation deadline.
The environmental impacts of the proposed exemption and the ``no-
action'' alternative are similar.
Alternative Use of Resources
The action does not involve the use of any different resources than
those considered in the Final Environmental Statement for CGS dated
December 1981.
Agencies and Persons Consulted
In accordance with its stated policy, on February 1, 2010, the NRC
staff consulted with the Washington State official, Mr. R. Cowley of
the Office of Radiation Protection, regarding the environmental impact
of the proposed action. The State official had no comments.
Finding of No Significant Impact
On the basis of the environmental assessment, the NRC concludes
that the proposed action will not have a significant effect on the
quality of the human environment. Accordingly, the NRC has determined
not to prepare an environmental impact statement for the proposed
action.
For further details with respect to the proposed action, see the
licensee's letter dated January 27, 2010. Portions of the document
contain security-related information and, accordingly, are not
available to the public. Other parts of the document may be examined,
and/or copied for a fee, at the NRC's Public Document Room (PDR),
located at One White Flint North, Room O-1 F21, 11555 Rockville Pike
(first floor), Rockville, Maryland 20852. Publicly available records
will be accessible electronically from the Agencywide Documents Access
and Management System (ADAMS) Public Electronic Reading Room on the
Internet at the NRC Web site, http://www.nrc.gov/reading-rm/adams.html.
Persons who do not have access to ADAMS or who encounter problems in
accessing the documents located in ADAMS should contact the NRC PDR
Reference staff by telephone at 1-800-397-4209 or 301-415-4737, or send
an e-mail to [email protected].
Dated at Rockville, Maryland, this 25th day of February 2010.
For the Nuclear Regulatory Commission.
Lynnea E. Wilkins,
Project Manager, Plant Licensing Branch IV, Division of Operating
Reactor Licensing, Office of Nuclear Reactor Regulation.