[Federal Register Volume 75, Number 44 (Monday, March 8, 2010)]
[Notices]
[Pages 10508-10513]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2010-4850]



[[Page 10508]]

=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 50-369 and 50-370; NRC-2010-0073]


Duke Energy Carolinas, LLC; Notice of Consideration of Issuance 
of Amendment to Facility Operating License for McGuire Nuclear Station 
Units 1 and 2, Proposed No Significant Hazards Consideration 
Determination, and Opportunity for a Hearing and Order Imposing 
Procedures for Access To Sensitive Unclassified Non-Safeguards 
Information (SUNSI)

AGENCY: Nuclear Regulatory Commission.

ACTION: Order, notice of license amendment request, opportunity to 
comment, opportunity to request a hearing.

-----------------------------------------------------------------------

DATES: Comments must be filed by April 7, 2010. A request for a hearing 
must be filed by May 7, 2010.

FOR FURTHER INFORMATION CONTACT: Jon Thompson, Project manager, Plant 
Licensing Branch II-1, Division of Operating Reactor Licensing, Office 
of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, 
Rockville, Maryland, 20852-2738. Telephone: (301) 415-1119; fax number: 
(301) 415-2102; e-mail: [email protected].

ADDRESSES: Please include Docket ID NRC-2010-0073 in the subject line 
of your comments. Comments submitted in writing or in electronic form 
will be posted on the NRC Web site and on the Federal rulemaking Web 
site Regulations.gov. Because your comments will not be edited to 
remove any identifying or contact information, the NRC cautions you 
against including any information in your submission that you do not 
want to be publicly disclosed.
    The NRC requests that any party soliciting or aggregating comments 
received from other persons for submission to the NRC inform those 
persons that the NRC will not edit their comments to remove any 
identifying or contact information, and therefore, they should not 
include any information in their comments that they do not want 
publicly disclosed.
    You may submit comments by any one of the following methods.
    Federal Rulemaking Web site: Go to http://www.regulations.gov and 
search for documents filed under Docket ID NRC-2010-0073. Comments may 
be submitted electronically through this Web site. Address questions 
about NRC dockets to Carol Gallagher 301-492-3668; e-mail 
[email protected].
    Mail comments to: Michael T. Lesar, Chief, Rulemaking and 
Directives Branch (RDB), Office of Administration, Mail Stop: TWB-05-
B01M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or 
by fax to RDB at (301) 492-3446.
    To access documents related to this notice see Section V, Further 
Information.

SUPPLEMENTARY INFORMATION:

I. Introduction

    The U.S. Nuclear Regulatory Commission (the Commission) is 
considering issuance of an amendment to Facility Operating License Nos. 
NPF-9 and NPF-17 issued to Duke Energy Carolinas, LLC (the licensee) 
for operation of the McGuire Nuclear Station, Units 1 and 2, located in 
Mecklenburg County, North Carolina.
    The proposed amendment would revise the Technical Specifications 
(TSs) associated with the verification of ice condenser door 
operability and TS surveillance requirements 3.6.13.5 and 3.6.13.6. The 
amendment application dated October 2, 2008, was supplemented by 
letters dated August 25, 2009, and October 23, 2009. Access to these 
documents is discussed in Section V, Further Information. A portion of 
the August 25, 2009, letter contains sensitive unclassified non-
safeguards information (SUNSI), and is not available to the public. See 
Section V, Further Information, and the Order providing instructions 
for requesting access to the withheld information.
    Before issuance of the proposed license amendment, the Commission 
will have made findings required by the Atomic Energy Act of 1954, as 
amended (the Act), and the Commission's regulations.
    The Commission has made a proposed determination that the amendment 
request involves no significant hazards consideration. Under the 
Commission's regulations in Title 10 of the Code of Federal Regulations 
(10 CFR), Section 50.92, this means that operation of the facility in 
accordance with the proposed amendment would not (1) involve a 
significant increase in the probability or consequences of an accident 
previously evaluated; or (2) create the possibility of a new or 
different kind of accident from any accident previously evaluated; or 
(3) involve a significant reduction in a margin of safety. As required 
by 10 CFR 50.91(a), the licensee has provided its analysis of the issue 
of no significant hazards consideration, which is presented below:

    1. Does the proposed amendment involve a significant increase in 
the probability or consequences of an accident previously evaluated?
    Response: No.
    The only analyzed accidents of possible consideration in regards 
to changes potentially affecting the ice condenser are a loss of 
coolant accident (LOCA) and a high energy line break (HELB) inside 
Containment. However, the ice condenser is not postulated as being 
the initiator of any LOCA or HELB. This is because it is designed to 
remain functional following a design basis earthquake, and the ice 
condenser does not interconnect or interact with any systems that 
interconnect or interact with the Reactor Coolant or Main Steam 
Systems. Since these proposed changes do not result in, or require, 
any physical change to the ice condenser that could introduce an 
interaction with the Reactor Coolant or Main Steam Systems, then 
there can be no change in the probability of an accident previously 
evaluated. Regarding consequences of analyzed accidents, the ice 
condenser is an engineered safety feature designed, in part, to 
limit the Containment sub-compartment and Containment vessel 
pressure immediately following the initiation of a LOCA or HELB. 
Conservative sub-compartment and Containment pressure analysis shows 
these criteria will be met if the total ice mass within the ice bed 
is maintained in accordance with the DBA analysis; therefore, the 
proposed TS SR changes of these requirements will not increase the 
consequences of any accident previously evaluated.
    Thus, based on the above, the proposed changes do not involve a 
significant increase in the probability or consequences of an 
accident previously evaluated.
    2. Does the proposed amendment create the possibility of a new 
or different kind of accident from any accident previously 
evaluated?
    Response: No.
    As previously described, the ice condenser is not postulated as 
being the initiator of any design basis accident. The proposed 
changes do not impact any plant system, structure or component that 
is an accident initiator. The proposed TSs and TS Bases changes do 
not involve any hardware changes to the ice condenser or other 
change that could create any new accident mechanisms. Therefore, 
there can be no new or different accidents created from those 
already identified and evaluated.
    3. Does the proposed amendment involve a significant reduction 
in the margin of safety?
    Response: No.
    Margin of safety is related to the confidence in the ability of 
the fission product barriers to perform their design functions 
during and following an accident situation. These barriers include 
the fuel cladding, the reactor coolant system, and the Containment 
system. The performance of the fuel cladding and the reactor coolant 
system will not be impacted by the proposed changes. The Application 
provides a description of additional sub-compartment and Containment 
pressure response analysis that has been performed. This analysis

[[Page 10509]]

demonstrates that Containment will remain fully capable of 
performing its design function with implementation of the proposed 
changes. Therefore, no safety margin will be significantly impacted.
    The changes proposed in this LAR do not make any physical 
alteration to the ice condenser doors, nor does it affect the 
required functional capability of the doors in any way. The intent 
of the proposed changes to the ice condenser door surveillance 
requirements is to eliminate an unnecessary and overly restrictive 
Lower Inlet Door torque surveillance test. There will be no 
degradation in the operable status of the ice condenser doors and 
the ability to confirm operability for the ice condenser doors will 
be maintained, such that the doors will continue to fully perform 
their safety function as assumed in the plant's safety analyses.
    Thus, it can be concluded that the proposed TS and TS Bases 
changes do not involve a significant reduction in the margin of 
safety.

    The NRC staff has reviewed the licensee's analysis and, based on 
this review, it appears that the three standards of 10 CFR 50.92(c) are 
satisfied. Therefore, the NRC staff proposes to determine that the 
amendment request involves no significant hazards consideration.
    The Commission is seeking public comments on this proposed 
determination. Any comments received within 30 days after the date of 
publication of this notice will be considered in making any final 
determination. You may submit comments using any of the methods 
discussed under the ADDRESSES caption.
    Normally, the Commission will not issue the amendment until the 
expiration of 60 days after the date of publication of this notice. The 
Commission may issue the license amendment before expiration of the 60-
day period provided that its final determination is that the amendment 
involves no significant hazards consideration. In addition, the 
Commission may issue the amendment prior to the expiration of the 30-
day comment period should circumstances change during the 30-day 
comment period such that failure to act in a timely way would result, 
for example, in derating or shutdown of the facility. Should the 
Commission take action prior to the expiration of either the comment 
period or the notice period, it will publish in the Federal Register a 
notice of issuance. Should the Commission make a final No Significant 
Hazards Consideration Determination, any hearing will take place after 
issuance. The Commission expects that the need to take this action will 
occur very infrequently.

II. Opportunity To Request a Hearing

    Requirements for hearing requests and petitions for leave to 
intervene are found in 10 CFR 2.309, ``Hearing requests, Petitions to 
Intervene, Requirements for Standing, and Contentions.'' Interested 
persons should consult 10 CFR Part 2, section 2.309, which is available 
at the NRC's Public Document Room (PDR), located at O1 F21, One White 
Flint North, 11555 Rockville Pike, Rockville, MD 20852 (or call the PDR 
at (800) 397-4209 or (301) 415-4737). NRC regulations are also 
accessible electronically from the NRC's Electronic Reading Room on the 
NRC Web site at http://www.nrc.gov.

III. Petitions for Leave To Intervene

    Any person whose interest may be affected by this proceeding and 
who wishes to participate as a party in the proceeding must file a 
written petition for leave to intervene. As required by 10 CFR 2.309, a 
petition for leave to intervene shall set forth with particularity the 
interest of the petitioner in the proceeding and how that interest may 
be affected by the results of the proceeding. The petition must provide 
the name, address, and telephone number of the petitioner and 
specifically explain the reasons why intervention should be permitted 
with particular reference to the following factors: (1) The nature of 
the petitioner's right under the AEA to be made a party to the 
proceeding; (2) the nature and extent of the petitioner's property, 
financial, or other interest in the proceeding; and (3) the possible 
effect of any order that may be entered in the proceeding on the 
petitioner's interest.
    A petition for leave to intervene must also include a specification 
of the contentions that the petitioner seeks to have litigated in the 
hearing. For each contention, the petitioner must provide a specific 
statement of the issue of law or fact to be raised or controverted, as 
well as a brief explanation of the basis for the contention. 
Additionally, the petitioner must demonstrate that the issue raised by 
each contention is within the scope of the proceeding and is material 
to the findings the NRC must make to support the granting of a license 
amendment in response to the application. The petition must also 
include a concise statement of the alleged facts or expert opinions 
which support the position of the petitioner and on which the 
petitioner intends to rely at hearing, together with references to the 
specific sources and documents on which the petitioner intends to rely. 
Finally, the petition must provide sufficient information to show that 
a genuine dispute exists with the applicant on a material issue of law 
or fact, including references to specific portions of the application 
for amendment that the petitioner disputes and the supporting reasons 
for each dispute, or, if the petitioner believes that the application 
for amendment fails to contain information on a relevant matter as 
required by law, the identification of each failure and the supporting 
reasons for the petitioner's belief. Each contention must be one that, 
if proven, would entitle the petitioner to relief.
    Those permitted to intervene become parties to the proceeding, 
subject to any limitations in the order granting leave to intervene, 
and have the opportunity to participate fully in the conduct of the 
hearing with respect to resolution of that person's admitted 
contentions, including the opportunity to present evidence and to 
submit a cross-examination plan for cross-examination of witnesses, 
consistent with NRC regulations, policies, and procedures. The 
Licensing Board will set the time and place for any prehearing 
conferences and evidentiary hearings, and the appropriate notices will 
be provided.
    Non-timely petitions for leave to intervene and contentions, 
amended petitions, and supplemental petitions will not be entertained 
absent a determination by the Commission, the Licensing Board or a 
Presiding Officer that the petition should be granted and/or the 
contentions should be admitted based upon a balancing of the factors 
specified in 10 CFR 2.309(c)(1)(i)-(viii).
    A State, county, municipality, Federally-recognized Indian Tribe, 
or agencies thereof, may submit a petition to the Commission to 
participate as a party under 10 CFR 2.309(d)(2). The petition should 
state the nature and extent of the petitioner's interest in the 
proceeding. The petition should be submitted to the Commission by May 
7, 2010. The petition must be filed in accordance with the filing 
instructions in section IV of this document, and should meet the 
requirements for petitions for leave to intervene set forth in this 
section, except that State and Federally-recognized Indian tribes do 
not need to address the standing requirements in 10 CFR 2.309(d)(1) if 
the facility is located within its boundaries. The entities listed 
above could also seek to participate in a hearing as a nonparty 
pursuant to 10 CFR 2.315(c).
    Any person who does not wish, or is not qualified, to become a 
party to this proceeding may request permission to make a limited 
appearance pursuant to

[[Page 10510]]

the provisions of 10 CFR 2.315(a). A person making a limited appearance 
may make an oral or written statement of position on the issues, but 
may not otherwise participate in the proceeding. A limited appearance 
may be made at any session of the hearing or at any prehearing 
conference, subject to such limits and conditions as may be imposed by 
the Licensing Board. Persons desiring to make a limited appearance are 
requested to inform the Secretary of the Commission by May 7, 2010.
    If a hearing is requested, the Commission will make a final 
determination on the issue of no significant hazards consideration. The 
final determination will serve to decide when the hearing is held. If 
the final determination is that the amendment request involves no 
significant hazards consideration, the Commission may issue the 
amendment and make it immediately effective, notwithstanding the 
request for a hearing. Any hearing held would take place after issuance 
of the amendment. If the final determination is that the amendment 
request involves a significant hazards consideration, any hearing held 
would take place before the issuance of any amendment.

IV. Electronic Submissions (E-Filing)

    All documents filed in NRC adjudicatory proceedings, including a 
request for hearing, a petition for leave to intervene, any motion or 
other document filed in the proceeding prior to the submission of a 
request for hearing or petition to intervene, and documents filed by 
interested governmental entities participating under 10 CFR 2.315(c), 
must be filed in accordance with the NRC E-Filing rule (72 FR 49139, 
August 28, 2007). The E-Filing process requires participants to submit 
and serve all adjudicatory documents over the internet, or in some 
cases to mail copies on electronic storage media. Participants may not 
submit paper copies of their filings unless they seek an exemption in 
accordance with the procedures described below.
    To comply with the procedural requirements of E-Filing, at least 
ten (10) days prior to the filing deadline, the participant should 
contact the Office of the Secretary by e-mail at 
[email protected], or by telephone at (301) 415-1677, to request 
(1) a digital ID certificate, which allows the participant (or its 
counsel or representative) to digitally sign documents and access the 
E-Submittal server for any proceeding in which it is participating; and 
(2) advise the Secretary that the participant will be submitting a 
request or petition for hearing (even in instances in which the 
participant, or its counsel or representative, already holds an NRC-
issued digital ID certificate). Based upon this information, the 
Secretary will establish an electronic docket for the hearing in this 
proceeding if the Secretary has not already established an electronic 
docket.
    Information about applying for a digital ID certificate is 
available on NRC's public Web site at http://www.nrc.gov/site-help/e-submittals/apply-certificates.html. System requirements for accessing 
the E-Submittal server are detailed in NRC's ``Guidance for Electronic 
Submission,'' which is available on the agency's public Web site at 
http://www.nrc.gov/site-help/e-submittals.html. Participants may 
attempt to use other software not listed on the Web site, but should 
note that the NRC's E-Filing system does not support unlisted software, 
and the NRC Meta System Help Desk will not be able to offer assistance 
in using unlisted software.
    If a participant is electronically submitting a document to the NRC 
in accordance with the E-Filing rule, the participant must file the 
document using the NRC's online, Web-based submission form. In order to 
serve documents through EIE, users will be required to install a Web 
browser plug-in from the NRC Web site. Further information on the Web-
based submission form, including the installation of the Web browser 
plug-in, is available on the NRC's public Web site at http://www.nrc.gov/site-help/e-submittals.html.
    Once a participant has obtained a digital ID certificate and a 
docket has been created, the participant can then submit a request for 
hearing or petition for leave to intervene. Submissions should be in 
Portable Document Format (PDF) in accordance with NRC guidance 
available on the NRC public Web site at http://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the time the 
documents are submitted through the NRC's E-Filing system. To be 
timely, an electronic filing must be submitted to the E-Filing system 
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of 
a transmission, the E-Filing system time-stamps the document and sends 
the submitter an e-mail notice confirming receipt of the document. The 
E-Filing system also distributes an e-mail notice that provides access 
to the document to the NRC Office of the General Counsel and any others 
who have advised the Office of the Secretary that they wish to 
participate in the proceeding, so that the filer need not serve the 
documents on those participants separately. Therefore, applicants and 
other participants (or their counsel or representative) must apply for 
and receive a digital ID certificate before a hearing request/petition 
to intervene is filed so that they can obtain access to the document 
via the E-Filing system.
    A person filing electronically using the agency's adjudicatory E-
Filing system may seek assistance by contacting the NRC Meta System 
Help Desk through the ``Contact Us'' link located on the NRC Web site 
at http://www.nrc.gov/site-help/e-submittals.html, by e-mail at 
[email protected], or by a toll-free call at (866) 672-7640. The 
NRC Meta System Help Desk is available between 8 a.m. and 8 p.m., 
Eastern Time, Monday through Friday, excluding government holidays.
    Participants who believe that they have a good cause for not 
submitting documents electronically must file an exemption request, in 
accordance with 10 CFR 2.302(g), with their initial paper filing 
requesting authorization to continue to submit documents in paper 
format. Such filings must be submitted by: (1) First class mail 
addressed to the Office of the Secretary of the Commission, U.S. 
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: 
Rulemaking and Adjudications Staff; or (2) courier, express mail, or 
expedited delivery service to the Office of the Secretary, Sixteenth 
Floor, One White Flint North, 11555 Rockville Pike, Rockville, 
Maryland, 20852, Attention: Rulemaking and Adjudications Staff. 
Participants filing a document in this manner are responsible for 
serving the document on all other participants. Filing is considered 
complete by first-class mail as of the time of deposit in the mail, or 
by courier, express mail, or expedited delivery service upon depositing 
the document with the provider of the service. A presiding officer, 
having granted an exemption request from using E-Filing, may require a 
participant or party to use E-Filing if the presiding officer 
subsequently determines that the reason for granting the exemption from 
use of E-Filing no longer exists.
    Documents submitted in adjudicatory proceedings will appear in 
NRC's electronic hearing docket which is available to the public at 
http://ehd.nrc.gov/EHD_Proceeding/home.asp, unless excluded pursuant 
to an order of the Commission, or the presiding officer. Participants 
are requested not to

[[Page 10511]]

include personal privacy information, such as social security numbers, 
home addresses, or home phone numbers in their filings, unless an NRC 
regulation or other law requires submission of such information. With 
respect to copyrighted works, except for limited excerpts that serve 
the purpose of the adjudicatory filings and would constitute a Fair Use 
application, participants are requested not to include copyrighted 
materials in their submission.
    Petitions for leave to intervene must be filed no later than 60 
days from the date of publication of this notice. Non-timely filings 
will not be entertained absent a determination by the presiding officer 
that the petition or request should be granted or the contentions 
should be admitted, based on a balancing of the factors specified in 10 
CFR 2.309(c)(1)(i)-(viii).

V. Further Information

    Documents related to the proposed action are available 
electronically at the NRC's Electronic Reading Room at http://www.nrc.gov/reading-rm/adams.html. From this site, you can access the 
NRC's Agencywide Documents Access and Management System (ADAMS), which 
provides text and image files of NRC's public documents. Search for 
these documents using the ADAMS accession numbers: The application for 
amendment dated October 2, 2008, (ML082900532); the publically-
available portions of the August 25, 2009, supplement (ML093430506), 
and the October 23, 2009 supplement (ML093430689). As discussed above 
in Section I., a portion of the August 25, 2009, supplement contains 
SUNSI and is not publically available. Instructions for requesting 
access to the portion of the document being withheld are contained in 
the following Order.
    If you do not have access to ADAMS or if there are problems in 
accessing the documents located in ADAMS, contact the NRC Public 
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737 or 
by e-mail to [email protected]. These documents may also be viewed 
electronically on the public computers located at the NRC's PDR at 
11555 Rockville Pike, Rockville, Maryland 20852. The PDR reproduction 
contractor will copy documents for a fee.

Order Imposing Procedures for Access to Sensitive Unclassified Non-
Safeguards Information for Contention Preparation

    A. This Order contains instructions regarding how potential parties 
to this proceeding may request access to documents containing Sensitive 
Unclassified Non-Safeguards Information (SUNSI).
    B. Within 10 days after publication of this notice of hearing and 
opportunity to petition for leave to intervene, any potential party who 
believes access to SUNSI is necessary to respond to this notice may 
request such access. A ``potential party'' is any person who intends to 
participate as a party by demonstrating standing and filing an 
admissible contention under 10 CFR 2.309. Requests for access to SUNSI 
submitted later than 10 days after publication will not be considered 
absent a showing of good cause for the late filing, addressing why the 
request could not have been filed earlier.
    C. The requestor shall submit a letter requesting permission to 
access SUNSI to the Office of the Secretary, U.S. Nuclear Regulatory 
Commission, Washington, DC 20555-0001, Attention: Rulemakings and 
Adjudications Staff, and provide a copy to the Associate General 
Counsel for Hearings, Enforcement and Administration, Office of the 
General Counsel, Washington, DC 20555-0001. The expedited delivery or 
courier mail address for both offices is: U.S. Nuclear Regulatory 
Commission, 11555 Rockville Pike, Rockville, Maryland 20852. The e-mail 
address for the Office of the Secretary and the Office of the General 
Counsel are [email protected] and [email protected], 
respectively.\1\ The request must include the following information:
---------------------------------------------------------------------------

    \1\ While a request for hearing or petition to intervene in this 
proceeding must comply with the filing requirements of the NRC's 
``E-Filing Rule,'' the initial request to access SUNSI under these 
procedures should be submitted as described in this paragraph.
---------------------------------------------------------------------------

    (1) A description of the licensing action with a citation to this 
Federal Register notice;
    (2) The name and address of the potential party and a description 
of the potential party's particularized interest that could be harmed 
by the action identified in C.(1);
    (3) The identity of the individual or entity requesting access to 
SUNSI and the requestor's basis for the need for the information in 
order to meaningfully participate in this adjudicatory proceeding. In 
particular, the request must explain why publicly-available versions of 
the information requested would not be sufficient to provide the basis 
and specificity for a proffered contention;
    D. Based on an evaluation of the information submitted under 
paragraph C.(3) the NRC staff will determine within 10 days of receipt 
of the request whether:
    (1) There is a reasonable basis to believe the petitioner is likely 
to establish standing to participate in this NRC proceeding; and
    (2) The requestor has established a legitimate need for access to 
SUNSI.
    E. If the NRC staff determines that the requestor satisfies both 
D.(1) and D.(2) above, the NRC staff will notify the requestor in 
writing that access to SUNSI has been granted. The written notification 
will contain instructions on how the requestor may obtain copies of the 
requested documents, and any other conditions that may apply to access 
to those documents. These conditions may include, but are not limited 
to, the signing of a Non-Disclosure Agreement or Affidavit, or 
Protective Order\2\ setting forth terms and conditions to prevent the 
unauthorized or inadvertent disclosure of SUNSI by each individual who 
will be granted access to SUNSI.
---------------------------------------------------------------------------

    \2\ Any motion for Protective Order or draft Non-Disclosure 
Affidavit or Agreement for SUNSI must be filed with the presiding 
officer or the Chief Administrative Judge if the presiding officer 
has not yet been designated, within 30 days of the deadline for the 
receipt of the written access request.
---------------------------------------------------------------------------

    F. Filing of Contentions. Any contentions in these proceedings that 
are based upon the information received as a result of the request made 
for SUNSI must be filed by the requestor no later than 25 days after 
the requestor is granted access to that information. However, if more 
than 25 days remain between the date the petitioner is granted access 
to the information and the deadline for filing all other contentions 
(as established in the notice of hearing or opportunity for hearing), 
the petitioner may file its SUNSI contentions by that later deadline.
    G. Review of Denials of Access.
    (1) If the request for access to SUNSI is denied by the NRC staff 
either after a determination on standing and need for access, or after 
a determination on trustworthiness and reliability, the NRC staff shall 
immediately notify the requestor in writing, briefly stating the reason 
or reasons for the denial.
    (2) The requestor may challenge the NRC staff's adverse 
determination by filing a challenge within 5 days of receipt of that 
determination with: (a) The presiding officer designated in this 
proceeding; (b) if no presiding officer has been appointed, the Chief 
Administrative Judge, or if he or she is unavailable, another 
administrative judge, or an administrative law judge with jurisdiction 
pursuant to 10 CFR 2.318(a); or (c) if another officer has been 
designated to rule on information access issues, with that officer.

[[Page 10512]]

    H. Review of Grants of Access. A party other than the requestor may 
challenge an NRC staff determination granting access to SUNSI whose 
release would harm that party's interest independent of the proceeding. 
Such a challenge must be filed with the Chief Administrative Judge 
within 5 days of the notification by the NRC staff of its grant of 
access.
    If challenges to the NRC staff determinations are filed, these 
procedures give way to the normal process for litigating disputes 
concerning access to information. The availability of interlocutory 
review by the Commission of orders ruling on such NRC staff 
determinations (whether granting or denying access) is governed by 10 
CFR 2.311.\3\
---------------------------------------------------------------------------

    \3\ Requestors should note that the filing requirements of the 
NRC's E-Filing Rule (72 FR 49139; August 28, 2007) apply to appeals 
of NRC staff determinations (because they must be served on a 
presiding officer or the Commission, as applicable), but not to the 
initial SUNSI request submitted to the NRC staff under these 
procedures.
---------------------------------------------------------------------------

    I. The Commission expects that the NRC staff and presiding officers 
(and any other reviewing officers) will consider and resolve requests 
for access to SUNSI, and motions for protective orders, in a timely 
fashion in order to minimize any unnecessary delays in identifying 
those petitioners who have standing and who have propounded contentions 
meeting the specificity and basis requirements in 10 CFR Part 2. 
Attachment 1 to this Order summarizes the general target schedule for 
processing and resolving requests under these procedures.
    It is so ordered.

    Dated at Rockville, Maryland, this 2nd day of March 2010.
    For the Nuclear Regulatory Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.

   Attachment 1--General Target Schedule for Processing and Resolving
Requests for Access to Sensitive Unclassified Non-Safeguards Information
                           in this Proceeding
------------------------------------------------------------------------
              Day                            Event/Activity
------------------------------------------------------------------------
0.............................  Publication of Federal Register notice
                                 of hearing and opportunity to petition
                                 for leave to intervene, including order
                                 with instructions for access requests.
10............................  Deadline for submitting requests for
                                 access to Sensitive Unclassified Non-
                                 Safeguards Information (SUNSI) with
                                 information: Supporting the standing of
                                 a potential party identified by name
                                 and address; describing the need for
                                 the information in order for the
                                 potential party to participate
                                 meaningfully in an adjudicatory
                                 proceeding.
60............................  Deadline for submitting petition for
                                 intervention containing: (i)
                                 Demonstration of standing; (ii) all
                                 contentions whose formulation does not
                                 require access to SUNSI (+25 Answers to
                                 petition for intervention; +7 requestor/
                                 petitioner reply).
20............................  Nuclear Regulatory Commission (NRC)
                                 staff informs the requestor of the
                                 staff's determination whether the
                                 request for access provides a
                                 reasonable basis to believe standing
                                 can be established and shows need for
                                 SUNSI. (NRC staff also informs any
                                 party to the proceeding whose interest
                                 independent of the proceeding would be
                                 harmed by the release of the
                                 information.) If NRC staff makes the
                                 finding of need for SUNSI and
                                 likelihood of standing, NRC staff
                                 begins document processing (preparation
                                 of redactions or review of redacted
                                 documents).
25............................  If NRC staff finds no ``need'' or no
                                 likelihood of standing, the deadline
                                 for requestor/petitioner to file a
                                 motion seeking a ruling to reverse the
                                 NRC staff's denial of access; NRC staff
                                 files copy of access determination with
                                 the presiding officer (or Chief
                                 Administrative Judge or other
                                 designated officer, as appropriate). If
                                 NRC staff finds ``need'' for SUNSI, the
                                 deadline for any party to the
                                 proceeding whose interest independent
                                 of the proceeding would be harmed by
                                 the release of the information to file
                                 a motion seeking a ruling to reverse
                                 the NRC staff's grant of access.
30............................  Deadline for NRC staff reply to motions
                                 to reverse NRC staff determination(s).
40............................  (Receipt +30) If NRC staff finds
                                 standing and need for SUNSI, deadline
                                 for NRC staff to complete information
                                 processing and file motion for
                                 Protective Order and draft Non-
                                 Disclosure Affidavit. Deadline for
                                 applicant/licensee to file Non-
                                 Disclosure Agreement for SUNSI.
A.............................  If access granted: Issuance of presiding
                                 officer or other designated officer
                                 decision on motion for protective order
                                 for access to sensitive information
                                 (including schedule for providing
                                 access and submission of contentions)
                                 or decision reversing a final adverse
                                 determination by the NRC staff.
A + 3.........................  Deadline for filing executed Non-
                                 Disclosure Affidavits. Access provided
                                 to SUNSI consistent with decision
                                 issuing the protective order.
A + 28........................  Deadline for submission of contentions
                                 whose development depends upon access
                                 to SUNSI. However, if more than 25 days
                                 remain between the petitioner's receipt
                                 of (or access to) the information and
                                 the deadline for filing all other
                                 contentions (as established in the
                                 notice of hearing or opportunity for
                                 hearing), the petitioner may file its
                                 SUNSI contentions by that later
                                 deadline.
A + 53........................  (Contention receipt +25) Answers to
                                 contentions whose development depends
                                 upon access to SUNSI.
A + 60........................  (Answer receipt +7) Petitioner/
                                 Intervenor reply to answers.
>A + 60.......................  Decision on contention admission.
------------------------------------------------------------------------


[[Page 10513]]

[FR Doc. 2010-4850 Filed 3-5-10; 8:45 am]
BILLING CODE 7590-01-P