[Federal Register Volume 74, Number 216 (Tuesday, November 10, 2009)]
[Notices]
[Pages 58058-58063]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: E9-26812]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[NRC-2009-0473]
Notice; Applications and Amendments to Facility Operating
Licenses Involving Proposed No Significant Hazards Considerations and
Containing Sensitive Unclassified Non-Safeguards Information and Order
Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards
Information
I. Background
Pursuant to section 189a.(2) of the Atomic Energy Act of 1954, as
amended (the Act), the U.S. Nuclear Regulatory Commission (the
Commission or NRC staff) is publishing this notice. The Act requires
the Commission to publish notice of any amendments issued, or proposed
to be issued and grants the Commission the authority to issue and make
immediately effective any amendment to an operating license upon a
determination by the Commission that such amendment involves no
significant hazards consideration, notwithstanding the pendency before
the Commission of a request for a hearing from any person.
This notice includes notices of amendments containing sensitive
unclassified non-safeguards information (SUNSI).
The Commission has made a proposed determination that the following
amendment requests involve no significant hazards consideration. Under
the Commission's regulations in Title 10 of the Code of Federal
Regulations (10 CFR), Section 50.92, this means that operation of the
facility in accordance with the proposed amendment would not (1)
involve a significant increase in the probability or consequences of an
accident previously evaluated; or (2) create the possibility of a new
or different kind of accident from any accident previously evaluated;
or (3) involve a significant reduction in a margin of safety. The basis
for this proposed determination for each amendment request is shown
below.
The Commission is seeking public comments on this proposed
determination. Any comments received within 30 days after the date of
[[Page 58059]]
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendment until the
expiration of 60 days after the date of publication of this notice. The
Commission may issue the license amendment before expiration of the 60-
day period provided that its final determination is that the amendment
involves no significant hazards consideration. In addition, the
Commission may issue the amendment prior to the expiration of the 30-
day comment period should circumstances change during the 30-day
comment period such that failure to act in a timely way would result,
for example in derating or shutdown of the facility. Should the
Commission take action prior to the expiration of either the comment
period or the notice period, it will publish in the Federal Register a
notice of issuance. Should the Commission make a final No Significant
Hazards Consideration Determination, any hearing will take place after
issuance. The Commission expects that the need to take this action will
occur very infrequently.
Written comments may be submitted by mail to the Chief, Rulemaking
and Directives Branch (RDB), TWB-05-B01M, Division of Administrative
Services, Office of Administration, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, and should cite the publication date and
page number of this Federal Register notice. Written comments may also
be faxed to the RDB at 301-492-3446. Documents may be examined, and/or
copied for a fee, at the NRC's Public Document Room (PDR), located at
One White Flint North, Public File Area O1 F21, 11555 Rockville Pike
(first floor), Rockville, Maryland.
Within 60 days after the date of publication of this notice, any
person(s) whose interest may be affected by this action may file a
request for a hearing and a petition to intervene with respect to
issuance of the amendment to the subject facility operating license.
Requests for a hearing and a petition for leave to intervene shall be
filed in accordance with the Commission's ``Rules of Practice for
Domestic Licensing Proceedings'' in 10 CFR Part 2. Interested person(s)
should consult a current copy of 10 CFR 2.309, which is available at
the Commission's PDR, located at One White Flint North, Public File
Area 01F21, 11555 Rockville Pike (first floor), Rockville, Maryland, or
at http://www.nrc.gov/reading-rm/doc-collections/cfr/part002/part002-0309.html. Publicly available records will be accessible from the
Agencywide Documents Access and Management System's (ADAMS) Public
Electronic Reading Room on the Internet at the NRC Web site, http://www.nrc.gov/reading-rm.html. If a request for a hearing or petition for
leave to intervene is filed within 60 days, the Commission or a
presiding officer designated by the Commission or by the Chief
Administrative Judge of the Atomic Safety and Licensing Board Panel,
will rule on the request and/or petition; and the Secretary or the
Chief Administrative Judge of the Atomic Safety and Licensing Board
will issue a notice of a hearing or an appropriate order.
As required by 10 CFR 2.309, a petition for leave to intervene
shall set forth with particularity the interest of the petitioner in
the proceeding, and how that interest may be affected by the results of
the proceeding. The petition should specifically explain the reasons
why intervention should be permitted with particular reference to the
following general requirements: (1) The name, address, and telephone
number of the requestor or petitioner; (2) the nature of the
requestor's/petitioner's right under the Act to be made a party to the
proceeding; (3) the nature and extent of the requestor's/petitioner's
property, financial, or other interest in the proceeding; and (4) the
possible effect of any decision or order which may be entered in the
proceeding on the requestor's/petitioner's interest. The petition must
also set forth the specific contentions which the petitioner/requestor
seeks to have litigated at the proceeding.
Each contention must consist of a specific statement of the issue
of law or fact to be raised or controverted. In addition, the
petitioner/requestor shall provide a brief explanation of the bases for
the contention and a concise statement of the alleged facts or expert
opinion which support the contention and on which the petitioner/
requestor intends to rely in proving the contention at the hearing. The
petitioner/requestor must also provide references to those specific
sources and documents of which the petitioner is aware and on which the
petitioner/requestor intends to rely to establish those facts or expert
opinion. The petition must include sufficient information to show that
a genuine dispute exists with the applicant on a material issue of law
or fact. Contentions shall be limited to matters within the scope of
the amendment under consideration. The contention must be one which, if
proven, would entitle the petitioner/requestor to relief. A petitioner/
requestor who fails to satisfy these requirements with respect to at
least one contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene,
and have the opportunity to participate fully in the conduct of the
hearing.
If a hearing is requested, and the Commission has not made a final
determination on the issue of no significant hazards consideration, the
Commission will make a final determination on the issue of no
significant hazards consideration. The final determination will serve
to decide when the hearing is held. If the final determination is that
the amendment request involves no significant hazards consideration,
the Commission may issue the amendment and make it immediately
effective, notwithstanding the request for a hearing. Any hearing held
would take place after issuance of the amendment. If the final
determination is that the amendment request involves a significant
hazards consideration, any hearing held would take place before the
issuance of any amendment.
All documents filed in NRC adjudicatory proceedings, including a
request for hearing, a petition for leave to intervene, any motion or
other document filed in the proceeding prior to the submission of a
request for hearing or petition to intervene, and documents filed by
interested governmental entities participating under 10 CFR 2.315(c),
must be filed in accordance with the NRC E-Filing rule, which the NRC
promulgated in the Federal Register on August 28, 2007 (72 FR 49139).
The E-Filing process requires participants to submit and serve all
adjudicatory documents over the Internet, or in some cases to mail
copies on electronic storage media. Participants may not submit paper
copies of their filings unless they seek an exemption in accordance
with the procedures described below.
To comply with the procedural requirements of E-Filing, at least
ten (10) days prior to the filing deadline, the petitioner/requestor
should contact the Office of the Secretary by e-mail at
[email protected], or by calling 301-415-1677, to request (1) a
digital ID certificate, which allows the participant (or its counsel or
representative) to digitally sign documents and access the E-Submittal
server for any proceeding in which it is participating; and/or (2)
creation of an electronic docket for the proceeding (even in instances
in which the petitioner/requestor (or its counsel
[[Page 58060]]
or representative) already holds an NRC-issued digital ID certificate).
Each petitioner/requestor will need to download the Workplace Forms
ViewerTM to access the Electronic Information Exchange
(EIE), a component of the E-Filing system. The Workplace Forms
ViewerTM is free and is available at http://www.nrc.gov/site-help/e-submittals/install-viewer.html. Information about applying
for a digital ID certificate is available on NRC's public Web site at
http://www.nrc.gov/site-help/e-submittals/apply-certificates.html.
Once a petitioner/requestor has obtained a digital ID certificate,
had a docket created, and downloaded the EIE viewer, it can then submit
a request for hearing or petition for leave to intervene. Submissions
should be in Portable Document Format (PDF) in accordance with NRC
guidance available on the NRC public Web site at http://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the
time the filer submits its documents through EIE. To be timely, an
electronic filing must be submitted to the EIE system no later than
11:59 p.m. Eastern Time on the due date. Upon receipt of a
transmission, the E-Filing system time-stamps the document and sends
the submitter an e-mail notice confirming receipt of the document. The
EIE system also distributes an e-mail notice that provides access to
the document to the NRC Office of the General Counsel and any others
who have advised the Office of the Secretary that they wish to
participate in the proceeding, so that the filer need not serve the
documents on those participants separately. Therefore, applicants and
other participants (or their counsel or representative) must apply for
and receive a digital ID certificate before a hearing request/petition
to intervene is filed so that they can obtain access to the document
via the E-Filing system.
A person filing electronically using the agency's adjudicatory e-
filing system may seek assistance through the ``Contact Us'' link
located on the NRC Web site at http://www.nrc.gov/site-help/e-submittals.html or by calling the NRC electronic filing Help Desk,
which is available between 8 a.m. and 8 p.m., Eastern Time, Monday
through Friday, excluding government holidays. The toll-free help line
number is 1-866-672-7640. A person filing electronically may also seek
assistance by sending an e-mail to the NRC electronic filing Help Desk
at [email protected].
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, Sixteenth
Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland
20852, Attention: Rulemaking and Adjudications Staff. Participants
filing a document in this manner are responsible for serving the
document on all other participants. Filing is considered complete by
first-class mail as of the time of deposit in the mail, or by courier,
express mail, or expedited delivery service upon depositing the
document with the provider of the service.
Non-timely requests and/or petitions and contentions will not be
entertained absent a determination by the Commission, the presiding
officer, or the Atomic Safety and Licensing Board that the request and/
or petition should be granted and/or the contentions should be
admitted, based on a balancing of the factors specified in 10 CFR
2.309(c)(1)(i)-(viii).
Documents submitted in adjudicatory proceedings will appear in
NRC's electronic hearing docket which is available to the public at
http://ehd.nrc.gov/ehd_proceeding/home.asp, unless excluded pursuant
to an order of the Commission, an Atomic Safety and Licensing Board, or
a Presiding Officer. Participants are requested not to include personal
privacy information, such as social security numbers, home addresses,
or home phone numbers in their filings, unless an NRC regulation or
other law requires submission of such information. With respect to
copyrighted works, except for limited excerpts that serve the purpose
of the adjudicatory filings and would constitute a Fair Use
application, participants are requested not to include copyrighted
materials in their submission.
For further details with respect to this amendment action, see the
application for amendment which is available for public inspection at
the Commission's PDR, located at One White Flint North, Public File
Area O1 F21, 11555 Rockville Pike (first floor), Rockville, Maryland.
Publicly available records will be accessible electronically from the
ADAMS Public Electronic Reading Room on the Internet at the NRC Web
site, http://www.nrc.gov/reading-rm/adams.html. If you do not have
access to ADAMS or if there are problems in accessing the documents
located in ADAMS, contact the PDR Reference staff at 1-800-397-4209,
301-415-4737, or by e-mail to [email protected].
Carolina Power & Light Company, et al., Docket No. 50-400, Shearon
Harris Nuclear Power Plant, Unit 1, Wake and Chatham Counties, North
Carolina
Date of amendment request: July 21, 2009.
Description of amendment request: This amendment request contains
sensitive unclassified non-safeguards information (SUNSI). The proposed
amendment would revise Technical Specification Section 6.9.1.6 to add
the NRC-approved topical report (TR) EMF-23 10(P)(A), ``SRP Chapter 15
Non-LOCA [Loss-of-Coolant Accident] Methodology for Pressurized Water
Reactors,'' to the Core Operating Limits Report methodologies list.
This change will allow the use of thermal-hydraulic computer analysis
code, S-RELAP5 for Final Safety Analysis Report (FSAR) Chapter 15 non-
LOCA transients in the Shearon Harris Nuclear Power Plant, Unit 1 (HNP)
safety analyses. Topical Report EMF-23 10(P)(A), Revision 0, was
approved by the NRC on May 11, 2001, for the application of the S-
RELAP5 thermal-hydraulic computer analysis code to FSAR Chapter 15 non-
LOCA transients. Revision 1 of TR EMF-23 10(P)(A), approved by the NRC
on May 19, 2004, updated Section 5.6 of the topical report.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed change involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The topical report has been reviewed and approved by the NRC for
use in determining core operating limits. The core operating limits
to be developed using the new methodologies for HNP will be
established in accordance with the applicable limitations as
documented in the NRC Safety Evaluation Reports. In the May 11,
2001, NRC SE, the NRC concluded that the S-RELAP5 code is capable of
addressing the thermal-hydraulic response of the target non-LOCA
events in a conservative manner and is therefore an acceptable
replacement for the ANF RELAP code. The May 19, 2004, SE for
Revision 1 to EMF-23 10(P)(A), concluded that the code remained
acceptable for use for the non-LOCA events.
[[Page 58061]]
The proposed change, by itself, does not impact the current
design bases. The proposed change enables the use of new methodology
to re-analyze certain events. Revised analyses may either result in
continued conformance with design bases or may change the design
bases. If design basis changes result from a revised analysis, the
specific design changes will be evaluated in accordance with HNP
design change procedures and 10 CFR 50.59.
The proposed change does not involve physical changes to any
plant structure, system, or component. Therefore, the probability of
occurrence for a previously analyzed accident is not significantly
increased.
The consequences of a previously analyzed accident are dependent
on the initial conditions assumed for the analysis, the behavior of
the fission product barriers during the analyzed accident, the
availability and successful functioning of the equipment assumed to
operate in response to the analyzed event, and the setpoints at
which these actions are initiated. The proposed methodologies will
ensure that the plant continues to meet applicable design and safety
analyses acceptance criteria. The proposed change does not affect
the performance of any equipment used to mitigate the consequences
of an analyzed accident. As a result, no analysis assumptions are
impacted and there are no adverse effects on the factors that
contribute to offsite or onsite dose as a result of an accident. The
proposed change does not affect setpoints that initiate protective
or mitigative actions. The proposed change ensures that plant
structures, systems, and components are maintained consistent with
the safety analysis and licensing bases.
Therefore, this amendment does not involve a significant
increase in the probability or consequences of a previously analyzed
accident.
2. Does the proposed change create the possibility of a new or
different kind of accident from any accident previously evaluated?
Response: No.
The proposed change does not involve any physical alteration of
plant systems, structures, or components, other than allowing for
fuel design in accordance with NRC approved methodologies. No new or
different equipment is being installed. No installed equipment is
being operated in a different manner. There is no change to the
parameters within which the plant is normally operated or in the
setpoints that initiate protective or mitigative actions. As a
result, no new failure modes are being introduced.
Therefore, the proposed change will not create the possibility
of a new or different kind of accident from any accident previously
evaluated.
3. Does the proposed change involve a significant reduction in a
margin of safety?
Response: No.
There is no impact on any margin of safety resulting from the
incorporation of this new topical report into the Technical
Specifications. If design basis changes result from a revised
analysis that uses these new methodologies, the specific design
changes will be evaluated in accordance with HNP design change
procedures and 10 CFR 50.59. Any potential reduction in the margin
of safety would be evaluated for that specific design change.
Therefore, this amendment does not involve a significant
reduction in the margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: David T. Conley, Associate General Counsel
II--Legal Department, Progress Energy Service Company, LLC, Post Office
Box 1551, Raleigh, North Carolina 27602.
NRC Branch Chief: Thomas H. Boyce.
Order Imposing Procedures for Access to Sensitive Unclassified Non-
Safeguards Information for Contention Preparation
Carolina Power & Light Company, et al., Docket No. 50-400, Shearon
Harris Nuclear Power Plant, Unit 1, Wake and Chatham Counties, North
Carolina
A. This Order contains instructions regarding how potential parties
to this proceeding may request access to documents containing Sensitive
Unclassified Non-Safeguards Information (SUNSI).
B. Within 10 days after publication of this notice of hearing and
opportunity to petition for leave to intervene, any potential party who
believes access to SUNSI is necessary to respond to this notice may
request such access. A ``potential party'' is any person who intends to
participate as a party by demonstrating standing and filing an
admissible contention under 10 CFR 2.309. Requests for access to SUNSI
submitted later than 10 days after publication will not be considered
absent a showing of good cause for the late filing, addressing why the
request could not have been filed earlier.
C. The requester shall submit a letter requesting permission to
access SUNSI to the Office of the Secretary, U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, Attention: Rulemakings and
Adjudications Staff, and provide a copy to the Associate General
Counsel for Hearings, Enforcement and Administration, Office of the
General Counsel, Washington, DC 20555-0001. The expedited delivery or
courier mail address for both offices is: U.S. Nuclear Regulatory
Commission, 11555 Rockville Pike, Rockville, Maryland 20852. The e-mail
address for the Office of the Secretary and the Office of the General
Counsel are [email protected] and [email protected],
respectively.\1\ The request must include the following information:
---------------------------------------------------------------------------
\1\ While a request for hearing or petition to intervene in this
proceeding must comply with the filing requirements of the NRC's
``E-Filing Rule,'' the initial request to access SUNSI under these
procedures should be submitted as described in this paragraph.
---------------------------------------------------------------------------
(1) A description of the licensing action with a citation to this
Federal Register notice;
(2) The name and address of the potential party and a description
of the potential party's particularized interest that could be harmed
by the action identified in C.(1);
(3) The identity of the individual or entity requesting access to
SUNSI and the requester's basis for the need for the information in
order to meaningfully participate in this adjudicatory proceeding. In
particular, the request must explain why publicly-available versions of
the information requested would not be sufficient to provide the basis
and specificity for a proffered contention;
D. Based on an evaluation of the information submitted under
paragraph C.(3) the NRC staff will determine within 10 days of receipt
of the request whether:
(1) There is a reasonable basis to believe the petitioner is likely
to establish standing to participate in this NRC proceeding; and
(2) The requestor has established a legitimate need for access to
SUNSI.
E. If the NRC staff determines that the requestor satisfies both
D.(1) and D.(2) above, the NRC staff will notify the requestor in
writing that access to SUNSI has been granted. The written notification
will contain instructions on how the requestor may obtain copies of the
requested documents, and any other conditions that may apply to access
to those documents. These conditions may include, but are not limited
to, the signing of a Non-Disclosure Agreement or Affidavit, or
Protective Order \2\ setting forth terms and conditions to prevent the
unauthorized or inadvertent disclosure of SUNSI by each individual who
will be granted access to SUNSI.
---------------------------------------------------------------------------
\2\ Any motion for Protective Order or draft Non-Disclosure
Affidavit or Agreement for SUNSI must be filed with the presiding
officer or the Chief Administrative Judge if the presiding officer
has not yet been designated, within 30 days of the deadline for the
receipt of the written access request.
---------------------------------------------------------------------------
F. Filing of Contentions. Any contentions in these proceedings that
are based upon the information received as a result of the request made
for SUNSI must be filed by the requestor no
[[Page 58062]]
later than 25 days after the requestor is granted access to that
information. However, if more than 25 days remain between the date the
petitioner is granted access to the information and the deadline for
filing all other contentions (as established in the notice of hearing
or opportunity for hearing), the petitioner may file its SUNSI
contentions by that later deadline.
G. Review of Denials of Access.
(1) If the request for access to SUNSI is denied by the NRC staff
either after a determination on standing and need for access, or after
a determination on trustworthiness and reliability, the NRC staff shall
immediately notify the requestor in writing, briefly stating the reason
or reasons for the denial.
(2) The requester may challenge the NRC staff's adverse
determination by filing a challenge within 5 days of receipt of that
determination with: (a) The presiding officer designated in this
proceeding; (b) if no presiding officer has been appointed, the Chief
Administrative Judge, or if he or she is unavailable, another
administrative judge, or an administrative law judge with jurisdiction
pursuant to 10 CFR 2.318(a); or (c) if another officer has been
designated to rule on information access issues, with that officer.
H. Review of Grants of Access. A party other than the requester may
challenge an NRC staff determination granting access to SUNSI whose
release would harm that party's interest independent of the proceeding.
Such a challenge must be filed with the Chief Administrative Judge
within 5 days of the notification by the NRC staff of its grant of
access.
If challenges to the NRC staff determinations are filed, these
procedures give way to the normal process for litigating disputes
concerning access to information. The availability of interlocutory
review by the Commission of orders ruling on such NRC staff
determinations (whether granting or denying access) is governed by 10
CFR 2.311.\3\
---------------------------------------------------------------------------
\3\ Requesters should note that the filing requirements of the
NRC's E-Filing Rule (72 FR 49139; August 28, 2007) apply to appeals
of NRC staff determinations (because they must be served on a
presiding officer or the Commission, as applicable), but not to the
initial SUNSI request submitted to the NRC staff under these
procedures.
---------------------------------------------------------------------------
I. The Commission expects that the NRC staff and presiding officers
(and any other reviewing officers) will consider and resolve requests
for access to SUNSI, and motions for protective orders, in a timely
fashion in order to minimize any unnecessary delays in identifying
those petitioners who have standing and who have propounded contentions
meeting the specificity and basis requirements in 10 CFR Part 2.
Attachment 1 to this Order summarizes the general target schedule for
processing and resolving requests under these procedures.
It is so ordered.
Dated at Rockville, Maryland, this 30th day of October 2009.
For the Nuclear Regulatory Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.
Attachment 1--General Target Schedule for Processing and Resolving
Requests for Access to Sensitive Unclassified Non-Safeguards Information
in this Proceeding
------------------------------------------------------------------------
Day Event/activity
------------------------------------------------------------------------
0................................. Publication of Federal Register
notice of hearing and opportunity
to petition for leave to intervene,
including order with instructions
for access requests.
10................................ Deadline for submitting requests for
access to Sensitive Unclassified
Non-Safeguards Information (SUNSI)
with information: Supporting the
standing of a potential party
identified by name and address;
describing the need for the
information in order for the
potential party to participate
meaningfully in an adjudicatory
proceeding.
60................................ Deadline for submitting petition for
intervention containing: (i)
Demonstration of standing; (ii) all
contentions whose formulation does
not require access to SUNSI (+25
Answers to petition for
intervention; +7 petitioner/
requestor reply).
20................................ Nuclear Regulatory Commission (NRC)
staff informs the requester of the
staff's determination whether the
request for access provides a
reasonable basis to believe
standing can be established and
shows need for SUNSI. (NRC staff
also informs any party to the
proceeding whose interest
independent of the proceeding would
be harmed by the release of the
information.) If NRC staff makes
the finding of need for SUNSI and
likelihood of standing, NRC staff
begins document processing
(preparation of redactions or
review of redacted documents).
25................................ If NRC staff finds no ``need'' or no
likelihood of standing, the
deadline for petitioner/requester
to file a motion seeking a ruling
to reverse the NRC staff's denial
of access; NRC staff files copy of
access determination with the
presiding officer (or Chief
Administrative Judge or other
designated officer, as
appropriate). If NRC staff finds
``need'' for SUNSI, the deadline
for any party to the proceeding
whose interest independent of the
proceeding would be harmed by the
release of the information to file
a motion seeking a ruling to
reverse the NRC staff's grant of
access.
30................................ Deadline for NRC staff reply to
motions to reverse NRC staff
determination(s).
40................................ (Receipt +30) If NRC staff finds
standing and need for SUNSI,
deadline for NRC staff to complete
information processing and file
motion for Protective Order and
draft Non-Disclosure Affidavit.
Deadline for applicant/licensee to
file Non-Disclosure Agreement for
SUNSI.
A................................. If access granted: Issuance of
presiding officer or other
designated officer decision on
motion for protective order for
access to sensitive information
(including schedule for providing
access and submission of
contentions) or decision reversing
a final adverse determination by
the NRC staff.
A + 3............................. Deadline for filing executed Non-
Disclosure Affidavits. Access
provided to SUNSI consistent with
decision issuing the protective
order.
A + 28............................ Deadline for submission of
contentions whose development
depends upon access to SUNSI.
However, if more than 25 days
remain between the petitioner's
receipt of (or access to) the
information and the deadline for
filing all other contentions (as
established in the notice of
hearing or opportunity for
hearing), the petitioner may file
its SUNSI contentions by that later
deadline.
A + 53............................ (Contention receipt +25) Answers to
contentions whose development
depends upon access to SUNSI.
A + 60............................ (Answer receipt +7) Petitioner/
Intervenor reply to answers.
>A + 60........................... Decision on contention admission.
A................................. If access granted: Issuance of
presiding officer or other
designated officer decision on
motion for protective order for
access to sensitive information
(including schedule for providing
access and submission of
contentions) or decision reversing
a final adverse determination by
the NRC staff.
A + 3............................. Deadline for filing executed Non-
Disclosure Affidavits. Access
provided to SUNSI consistent with
decision issuing the protective
order.
[[Page 58063]]
A + 28............................ Deadline for submission of
contentions whose development
depends upon access to SUNSI.
However, if more than 25 days
remain between the petitioner's
receipt of (or access to) the
information and the deadline for
filing all other contentions (as
established in the notice of
hearing or opportunity for
hearing), the petitioner may file
its SUNSI contentions by that later
deadline.
A + 53............................ (Contention receipt +25) Answers to
contentions whose development
depends upon access to SUNSI.
A + 60............................ (Answer receipt +7) Petitioner/
Intervenor reply to answers.
>A + 60........................... Decision on contention admission.
------------------------------------------------------------------------
[FR Doc. E9-26812 Filed 11-9-09; 8:45 am]