In the Matter of: Mr. Christopher S. Loyd Confirmatory Order
(Effective Immediately)
I
Mr. Christopher Loyd holds the position of Radiation Safety Officer
for Earth Exploration, Inc. Earth Exploration, Inc., is the holder of
Materials License No. 13-26408-01 issued by the U.S. Nuclear Regulatory
Commission (NRC or Commission) pursuant to 10 CFR Part 30 on June 3,
1992. The license authorizes Earth Exploration, Inc., to store portable
gauges at its permanent facilities in Indianapolis and South Bend,
Indiana,
[[Page 52263]]
and to use those portable gauges at temporary job sites. Mr. Loyd was
named as Radiation Safety Officer on the license in 2002.
This Confirmatory Order is the result of an agreement reached
during an Alternative Dispute Resolution (ADR) mediation session
conducted on August 25, 2009.
II
On July 21, 2008, the NRC conducted an onsite inspection at the
Earth Exploration, Inc., main office in Indianapolis, Indiana and at
two temporary job sites in Indianapolis. Additional onsite inspections
were held on August 14 and 15, 2008, at the South Bend field office and
a temporary job site in South Bend, Indiana. The purpose of the
inspections was to review licensee activities related to radiation
safety and to assess licensee compliance with the Commission's rules
and regulations and with the conditions of the Earth Exploration, Inc.,
license. As a result of the inspection observations, the NRC Office of
Investigations (OI) initiated an investigation (OI Case No. 3-2008-026)
and on April 27, 2009, the NRC preliminarily determined that apparent
violations of NRC requirements had occurred at Earth Exploration, Inc.
The apparent violations included, among others, failure to: (1) Perform
annual reviews of the radiation protection program as required by 10
CFR 20.1101(c); (2) perform leak testing of sealed sources as required
by License Condition 13; (3) perform physical inventories every six
months of sealed sources as required by License Condition 16; (4)
ensure that dosimetry provided to gauge users was processed and
evaluated by a processor approved through the National Voluntary
Laboratory Accreditation Program as required by License Condition 21;
and (5) ensure through the Radiation Safety Officer that required tests
and conditions of the NRC license are performed as required by License
Condition 21. The NRC preliminarily determined that Mr. Christopher
Loyd's actions, as the Radiation Safety Officer, caused the licensee to
be in apparent violation of the above requirements resulting in an
apparent violation of 10 CFR 30.10.
The results of the investigation were sent to Mr. Christopher Loyd
in a letter dated July 21, 2009. This letter offered Mr. Loyd the
opportunity to either participate in ADR mediation or to attend a
Predecisional Enforcement Conference. In response to the NRC's offer,
Mr. Loyd requested use of the NRC's ADR process to resolve the
differences he had with the NRC. On July 31, 2009, the NRC and Mr. Loyd
agreed to mediation. On August 25, 2009, the NRC and Mr. Loyd
participated in an ADR session mediated by a professional mediator,
arranged through Cornell University's Institute on Conflict Resolution.
As used by the NRC, ADR is a process in which a neutral mediator with
no decision-making authority assists the parties in reaching an
agreement on resolving any differences regarding the dispute. This
Confirmatory Order is issued pursuant to the agreement reached during
the ADR process.
III
During the August 25, 2009, ADR session, a preliminary settlement
agreement was reached. The elements of the agreement consisted of the
following:
1. Within three months of the date of the Confirmatory Order, Mr.
Loyd agrees to conduct ``lessons learned'' training, to address
oversight of the radiation safety program; duties and responsibilities
of the RSO; and transportation, use, and security for portable gauges.
The training shall also address employees' responsibility to report
safety concerns to licensee management and the availability of
informing the NRC of any concerns. Within two weeks of completing this
internal training for all these employees, Mr. Loyd will submit an
outline of the presentation and a list of attendees to the Director for
the Division of Nuclear Materials Safety, NRC, Region III, on behalf of
Earth Exploration, Inc.
2. Within 30 days of the date of the Confirmatory Order, Mr. Loyd
agrees to prepare and submit to the Director for the Division of
Nuclear Materials Safety, NRC, Region III, a plan to inform others of
the lessons learned about the importance of ensuring robust radiation
safety program requirements and developing the necessary infrastructure
and communication paths to identify and resolve competing priorities
that may preclude successful implementation. As a part of the plan, Mr.
Loyd will submit either the article or a presentation outline to the
Director for the Division of Nuclear Materials Safety, NRC, Region III,
for review prior to its use.
3. Mr. Loyd agrees to prepare and submit to the Director for the
Division of Nuclear Materials Safety, NRC, Region III, and to his
management at Earth Exploration, Inc., a document which describes the
radiation safety activities completed every three months for a period
of two years. The first report shall be submitted within 90 days of the
date of the Confirmatory Order.
4. Mr. Loyd agrees to submit to the Director for the Division of
Nuclear Materials Safety, NRC, Region III and to his management at
Earth Exploration, Inc., a plan on how he will accomplish all of the
tasks assigned to him as Radiation Safety Officer, and what steps he
will take to ensure that the infrastructure exists for those duties
with a long periodicity (i.e., one a year) within 60 days of the date
of the Confirmatory Order.
5. Mr. Loyd, by signing the Agreement in Principle, makes no
admission that he deliberately violated any NRC requirements and this
agreement is settlement of a disputed claim in order to avoid further
action by the NRC.
6. The NRC agrees to not pursue any further enforcement action in
connection with the NRC's July 21, 2009, letter to Mr. Loyd. This does
not prohibit the NRC from taking an enforcement action, in accordance
with the NRC Enforcement Policy, if Mr. Loyd commits a similar
violation in the future or violates the Order.
On September 10, 2009, Mr. Christopher Loyd consented to issuing
this Order with the commitments, as described in Section V below. Mr.
Loyd further agreed that this Order is to be effective upon issuance
and that he has waived his right to a hearing.
IV
Since Mr. Christopher Loyd has agreed to take additional actions to
address the NRC's concerns, as set forth in Item III above, the NRC has
concluded that its concerns can be resolved through issuance of this
Order.
I find that Mr. Loyd's commitments as set forth in Section V are
acceptable and necessary and conclude that with these commitments the
public health and safety are reasonably assured. In view of the
foregoing, I have determined that public health and safety require that
Mr. Loyd's commitments be confirmed by this Order. Based on the above,
and Mr. Loyd's consent, this Order is immediately effective upon
issuance.
V
Accordingly, pursuant to Sections 81, 161b, 161i, 161o, 182 and 186
of the Atomic Energy Act of 1954, as amended, and the Commission's
regulations in 10 CFR 2.202 and 10 CFR Part 30, It is hereby ordered,
effective immediately:
1. Mr. Christopher Loyd shall, within three months of the date of
the Confirmatory Order, conduct ``lessons learned'' training. The
training shall address oversight of the radiation safety program;
duties and responsibilities of
[[Page 52264]]
the Radiation Safety Officer; and transportation, use, and security for
portable gauges. The training shall also address employees'
responsibility to report safety concerns to licensee management and the
availability of informing the NRC of any concerns. Within two weeks of
completing this internal training, Mr. Loyd shall submit an outline of
the presentation and a list of attendees to the Director for the
Division of Nuclear Materials Safety, NRC, Region III.
2. Mr. Christopher Loyd shall, within 30 days of the date of the
Confirmatory Order, prepare and submit to the Director for the Division
of Nuclear Materials Safety, NRC, Region III, a plan to inform others
of the lessons learned about the importance of ensuring robust
radiation safety program requirements and developing the necessary
infrastructure and communication paths to identify and resolve
competing priorities that may preclude successful implementation. As a
part of the plan, Mr. Loyd shall submit either the article or a
presentation outline, to the Director for the Division of Nuclear
Materials Safety, NRC, Region III for review prior to its use.
3. Mr. Loyd shall prepare and submit to the Director for the
Division of Nuclear Materials Safety, NRC, Region III, and to his
management at Earth Exploration, Inc., a document which describes the
radiation safety activities completed every three months for a period
of two years. The first report shall be submitted within 90 days of the
date of the Confirmatory Order.
4. Mr. Loyd shall submit to the Director for the Division of
Nuclear Materials Safety, NRC, Region III and to his management at
Earth Exploration, Inc., a plan on how he will accomplish all of the
tasks assigned to him as Radiation Safety Officer, and what steps he
will take to ensure that the infrastructure exists for those duties
with a long periodicity (i.e. one a year) within 60 days of the date of
the Confirmatory Order.
The Regional Administrator, NRC Region III, may, in writing, relax
or rescind any of the above conditions upon demonstration by Mr. Loyd
of good cause.
VI
Any person adversely affected by this Confirmatory Order, other
than Mr. Christopher Loyd, may request a hearing within 20 days of the
Order's publication in the Federal Register. Where good cause is shown,
consideration will be given to extending the time to request a hearing.
A request for extension of time must be directed to the Director,
Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001, and include a statement of good cause for the extension.
A request for a hearing must be filed in accordance with the NRC E-
Filing rule, which the NRC promulgated on August 28, 2007, 72 FR 49139.
The E-Filing process requires participants to submit and serve
documents over the internet or, in some cases, to mail copies on
electronic optical storage media. Participants may not submit paper
copies of their filings unless they seek a waiver in accordance with
the procedures described below.
To comply with the procedural requirements associated with E-
Filing, at least five days prior to the filing deadline the requestor
must contact the Office of the Secretary by e-mail at
[email protected], or by calling (301) 415-1677, to request: (1) A
digital ID certificate, which allows the participant (or its counsel or
representative) to digitally sign documents and access the E-Submittal
server for any NRC proceeding in which it is participating; and/or (2)
creation of an electronic docket for the proceeding [even in instances
when the requestor (or its counsel or representative) already holds an
NRC-issued digital ID certificate]. Each requestor will need to
download the Workplace Forms ViewerTM to access the
Electronic Information Exchange (EIE), a component of the E-Filing
system. The Workplace Forms ViewerTM is free and is
available at http://www.nrc.gov/site-help/e-submittals/install-viewer.html. Information about applying for a digital ID certificate
also is available on NRC's public Web site at http://www.nrc.gov/site-help/e-submittals/apply-certificates.html.
Once a requestor has obtained a digital ID certificate, had a
docket created, and downloaded the EIE viewer, it can then submit a
request for a hearing through EIE. Submissions should be in Portable
Document Format (PDF) in accordance with NRC guidance available on the
NRC public Web site at http://www.nrc.gov/site-help/e-submittals.html.
A filing is considered complete at the time the filer submits its
document through EIE. To be timely, electronic filings must be
submitted to the EIE system no later than 11:59 p.m. Eastern Time on
the due date. Upon receipt of a transmission, the E-Filing system time-
stamps the document and sends the submitter an e-mail notice confirming
receipt of the document. The EIE system also distributes an e-mail
notice that provides access to the document to the NRC Office of the
General Counsel and any others who have advised the Office of the
Secretary that they wish to participate in the proceeding, so that the
filer need not serve the document on those participants separately.
Therefore, any others who wish to participate in the proceeding (or
their counsel or representative) must apply for and receive a digital
ID certificate before a hearing request is filed so that they may
obtain access to the document via the E-Filing system.
A person filing electronically using the agency's adjudicatory e-
filing system may seek assistance through the ``Contact Us'' link
located on the NRC Web site at http://www.nrc.gov/site-help/e-submittals.html or by calling the NRC Meta-System Help Desk, which is
available between 8 a.m. and 8 p.m., Eastern Time, Monday through
Friday, excluding government holidays. The Meta-System Help Desk can be
contacted by telephone at 1-866-672-7640 or by e-mail at
[email protected].
Participants who believe that they have good cause for not
submitting documents electronically must file a motion, in accordance
with 10 CFR 2.302(g), with their initial paper filing requesting
authorization to continue to submit documents in paper format. Such
filings must be submitted by: (1) First class mail addressed to the
Office of the Secretary of the Commission, U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, Attention: Rulemaking and
Adjudications Staff; or (2) courier, express mail, or expedited
delivery service to the Office of the Secretary, Sixteenth Floor, One
White Flint North, 11555 Rockville, Pike, Rockville, Maryland 20852,
Attention: Rulemaking and Adjudications Staff. Participants filing a
document in this manner are responsible for serving the document on all
other participants. Filing is considered complete by first-class mail
as of the time of deposit in the mail, or by courier, express mail, or
expedited delivery service upon depositing the document with the
provider of the service.
Documents submitted in adjudicatory proceedings will appear in
NRC's electronic hearing docket which is available to the public at
http://ehd.nrc.gov/EHD_Proceeding/home.asp, unless excluded pursuant
to an order of the Commission, an Atomic Safety and Licensing Board, or
a Presiding Officer. Participants are requested not to include personal
privacy information, such as social security numbers, home addresses,
or home phone numbers in their filings. With respect to copyrighted
[[Page 52265]]
works, except for limited excerpts that serve the purpose of the
adjudicatory filings and would constitute a Fair Use application,
participants are requested not to include copyrighted materials in
their works.
If a person other than Mr. Christopher Loyd requests a hearing,
that person shall set forth with particularity the manner in which his
interest is adversely affected by this Order and shall address the
criteria set forth in 10 CFR 2.309(d) and (f).
If the hearing is requested by a person whose interest is adversely
affected, the Commission will issue an Order designating the time and
place of any hearing. If a hearing is held, the issue to be considered
at such hearing shall be whether this Confirmatory Order should be
sustained. In the absence of any request for hearing, or written
approval of an extension of time in which to request a hearing, the
provisions specified in Section V above shall be final 20 days from the
date this Order is published in the Federal Register without further
order or proceedings. If an extension of time for requesting a hearing
has been approved, the provisions specified in Section V shall be final
when the extension expires, if a hearing request has not been received.
A request for hearing shall not stay the immediate effectiveness of
this order.
For the U.S. Nuclear Regulatory Commission.
Dated this 1st day of October 2009.
Cynthia D. Pederson,
Deputy Regional Administrator, Region III.
[FR Doc. E9-24421 Filed 10-8-09; 8:45 am]
BILLING CODE 7590-01-P