[Federal Register Volume 74, Number 183 (Wednesday, September 23, 2009)]
[Notices]
[Pages 48533-48534]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: E9-22859]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP09-463-000]


ANR Pipeline Company; Notice of Request Under Blanket 
Authorization

September 16, 2009.
    Take notice that on September 10, 2009, ANR Pipeline Company (ANR), 
717 Texas Street, Houston, Texas 77002, filed in Docket No. CP09-463-
000, a prior notice request pursuant to sections 157.205 and 157.216 of 
the Federal Energy Regulatory Commission's regulations under the 
Natural Gas Act for authorization to abandon by sale to ATP Oil & Gas 
Corporation (ATP), approximately 9.67 miles of 6-inch diameter 
pipeline, located in offshore Louisiana, all as more fully set forth in 
the application, which is on file with the Commission and open to 
public inspection. The filing may also be viewed on the web at http://www.ferc.gov using the ``eLibrary'' link. Enter the docket number 
excluding the last three digits in the docket number field to access 
the document. For assistance, contact FERC at 
[email protected] or call toll-free, (866) 208-3676 or TTY, 
(202) 502-8659.
    Specifically, ANR proposes to abandon by sale to ATP, the El 30-34 
Facilities, which consist of approximately 9.67 miles of 6-inch 
diameter pipeline bearing Minerals Management Service Segment No. 8888, 
ANR Line No. 795, beginning at a point on ATP's Eugene Island Area 
Block 30 JA Platform and ending at the upstream side of a subsea 8-inch 
tap valve located on ANR's 20-inch pipeline in Eugene Island Area Block 
34 designated as Line No. 733, in Federal Waters, offshore Louisiana. 
ANR also proposes to abandon its interest in any appurtenances and 
facilities related to Line No. 795, including, and without limitation, 
the pipeline riser, metering facilities including Meter No. 512202 
(excluding any Electronic Gas Measurement Equipment (EGM)), and deck 
piping associated with the El 30-34 Facilities. ANR states that they 
will continue to operate the meter for ATP, and will continue to own, 
operate, and maintain ANR's existing side valve assembly on ANR's Line 
No. 733, EGM, and gas sampling equipment.
    Any questions regarding the application should be directed to Rene 
Staeb, Manager, Project Determinations & Regulatory Administration, ANR 
Pipeline Company, 717 Texas Street, Houston, Texas 77002, or call at 
(832)

[[Page 48534]]

320-5215 or fax (832) 320-6215 or [email protected].
    Any person may, within 60 days after the issuance of the instant 
notice by the Commission, file pursuant to Rule 214 of the Commission's 
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of 
intervention. Any person filing to intervene or the Commission's staff 
may, pursuant to section 157.205 of the Commission's Regulations under 
the Natural Gas Act (NGA) (18 CFR 157.205) file a protest to the 
request. If no protest is filed within the time allowed therefore, the 
proposed activity shall be deemed to be authorized effective the day 
after the time allowed for protest. If a protest is filed and not 
withdrawn within 30 days after the time allowed for filing a protest, 
the instant request shall be treated as an application for 
authorization pursuant to section 7 of the NGA.
    The Commission strongly encourages electronic filings of comments, 
protests, and interventions via the Internet in lieu of paper. See 18 
CFR 385.2001(a) (1) (iii) and the instructions on the Commission's Web 
site (http://www.ferc.gov) under the ``e-Filing'' link.

Kimberly D. Bose,
Secretary.
[FR Doc. E9-22859 Filed 9-22-09; 8:45 am]
BILLING CODE 6717-01-P