AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, First Coast Guard District, has issued a
temporary deviation from the regulation governing the operation of the
Chelsea Street Bridge across the Chelsea River, mile 1.2, between
Chelsea and East Boston, Massachusetts. This deviation allows the
bridge to remain in the closed position for nine hours to facilitate
bridge maintenance. Vessels that can pass under the draw without a
bridge opening may do so at all times.
DATES: This deviation is effective from 8 p.m. on April 25, 2009,
through 5 a.m. on April 26, 2009.
ADDRESSES: Documents indicated in this preamble as being available in
the docket are part of docket USCG-2009-0219 and are available online
at http://www.regulations.gov. They are also available for inspection
or copying at two locations: The Docket Management Facility (M-30),
U.S. Department of Transportation, West Building Ground Floor, Room
W12-140, 1200 New Jersey Avenue, SE., Washington, DC 20590, between 9
a.m. and 5 p.m., Monday through Friday, except Federal holidays; and
the First Coast Guard District, Bridge Branch Office, 408 Atlantic
Avenue, Boston, Massachusetts 02110, between 7 a.m. and 3 p.m., Monday
through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: John McDonald, Project Officer, First
Coast Guard District, at (617) 223-8364.
SUPPLEMENTARY INFORMATION: The Massachusetts Highway Department,
requested this temporary deviation to facilitate a power supply
relocation project. The Chelsea Street Bridge, across the Chelsea River
at mile 1.2, between Chelsea and East Boston, Massachusetts, has a
vertical clearance in the closed position of 9 feet at mean high water
and 19 feet at mean low water. The bridge opens on signal as required
by 33 CFR 117.593.
This deviation allows the bridge to remain closed from 8 p.m. on
April 25, 2009 through 5 a.m. on April 26, 2009. Vessels able to pass
under the closed draw may do so at any time.
The waterway is primarily used by deep draft tankers, tugs and
barge units. Waterway users were advised of the requested bridge
closure period and offered no objection.
In accordance with 33 CFR 117.35(e), the bridge must return to its
regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: March 30, 2009.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. E9-8305 Filed 4-10-09; 8:45 am]
BILLING CODE 4910-15-P