[Federal Register Volume 74, Number 24 (Friday, February 6, 2009)]
[Notices]
[Page 6283]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: E9-2523]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP09-51-000 ]
Natural Gas Pipeline Company of America LLC; Notice of Request
Under Blanket Authorization
January 29, 2009.
Take notice that on January 22, 2009, Natural Gas Pipeline Company
of America LLC (Natural), 3250 Lacey Road, Suite 700, Downers Grove,
Illinois 60515, filed in Docket No. CP09-51-000, an application
pursuant to sections 157.205, 157.208, 157.211 and 157.212 of the
Commission's Regulations under the Natural Gas Act (NGA) as amended, to
construct, install, own, operate, and maintain facilities necessary to
deliver natural gas to the Southwest Louisiana Lateral (Southwest
Loop), which is partially owned by Transcontinental Gas Pipe Line
Corporation (Transco), and to Bridgeline Holdings, L.P. (Bridgeline),
both located in Johnson Bayou, Cameron Parish, Louisiana, under
Natural's blanket certificate issued in Docket No. CP82-402-000,\1\ all
as more fully set forth in the application which is on file with the
Commission and open to the public for inspection.
---------------------------------------------------------------------------
\1\ 20 FERC ] 62,415 (1982).
---------------------------------------------------------------------------
Natural proposes to construct, install, own, operate, and maintain
a metering platform, dual metering facilities, taps, and such other
appurtenant facilities required to effect the interconnects to deliver
up to 200,000 Dth/day of natural gas to the Southwest Loop or to
deliver up to 200,000 Dth/day of natural gas to Bridgeline. Natural
states that it would cost an estimated $11,900,000 to construct the
proposed facilities.
Any questions concerning this application may be directed to Bruce
H. Newsome, Vice President, Regulatory Products and Services, Natural
Gas Pipeline Company of America LLC, 3250 Lacey Road, 7th Floor,
Downers Grove, Illinois 60515-7918, or via telephone at (630) 725-3070,
or by e-mail [email protected].
This filing is available for review at the Commission or may be
viewed on the Commission's Web site at http://www.ferc.gov, using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number filed to access the document. For
assistance, please contact FERC Online Support at FERC
[email protected] or call toll-free at (866) 206-3676, or, for
TTY, contact (202) 502-8659. Comments, protests and interventions may
be filed electronically via the Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. The Commission strongly encourages
intervenors to file electronically.
Any person or the Commission's staff may, within 60 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the regulations under the NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the allowed time for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the NGA.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-2523 Filed 2-5-09; 8:45 am]
BILLING CODE 6717-01-P