NUCLEAR REGULATORY COMMISSION
[Docket Nos. 50-317 And 50-318; Docket No. 72-8]
Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 And 2; Calvert
Cliffs Independent Spent Fuel Storage Installation; Notice of
Consideration of Approval of 10 CFR 50.80 and 10 CFR 72.50 Indirect
Transfers of Control of Licenses and Opportunity for a Hearing
The U.S. Nuclear Regulatory Commission (NRC, the Commission) is
considering the issuance of an Order under 10 CFR 50.80 and 10 CFR
72.50 approving the indirect transfer of Facility Operating License
Nos. DPR-53 and DPR-69 for the Calvert Cliffs Nuclear Power Plant, Unit
Nos. 1 and 2, respectively, and Material License No. SNM-2505 for the
Calvert Cliffs Independent Spent Fuel Storage Installation, currently
held by Calvert Cliffs Nuclear Power Plant, Inc. as owner and licensed
operator. Calvert Cliffs Nuclear Power Plant, Inc. is owned by
Constellation Energy Nuclear Group, LLC (CENG).
According to an application for approval dated October 3, 2008,
filed by CENG and MidAmerican Energy Holdings Company (MEHC), the
indirect transfers of control would result from the proposed
acquisition by merger of CENG's parent corporation, Constellation
Energy Group, Inc. (CEG) by MEHC. MEHC will indirectly own 100 percent
of CEG through its direct wholly owned subsidiary Constellation Energy
Holdings, LLC, a holding company.
CEG will remain as the parent company of CENG and CENG will remain
as the parent company of the licensee. There will be no direct transfer
of the licenses. Calvert Cliffs Nuclear Power Plant, Inc. will continue
to own and operate the facilities. No physical changes to the
facilities or operational changes are being proposed in the
application.
Pursuant to 10 CFR 50.80, no license, or any right thereunder,
shall be transferred, directly or indirectly, through transfer of
control of the license, unless the Commission shall give its consent in
writing. The Commission will approve an application for the indirect
transfer of a license, if the Commission determines that the proposed
transfer will not affect the qualifications of the licensee to hold the
license, and that the transfer is otherwise consistent with applicable
provisions of law, regulations, and Orders issued by the Commission
pursuant thereto.
The filing of requests for hearing and petitions for leave to
intervene, and written comments with regard to the license transfer
application, are discussed below.
Within 20 days from the date of publication of this notice, any
person(s) whose interest may be affected by the Commission's action on
the application may request a hearing and intervention via electronic
submission through the NRC E-filing system. Requests for a hearing and
petitions for leave to intervene should be filed in accordance with the
Commission's rules of practice set forth in Subpart C ``Rules of
General Applicability: Hearing Requests, Petitions to Intervene,
Availability of Documents, Selection of Specific Hearing Procedures,
Presiding Officer Powers, and General Hearing Management for NRC
Adjudicatory Hearings,'' of 10 CFR Part 2. In particular, such requests
and petitions must comply with the requirements set forth in 10 CFR
2.309. Untimely requests and petitions may be denied, as provided in 10
CFR 2.309(c)(1), unless good cause for failure to file on time is
established. In addition, an untimely request or petition should
address the factors that the Commission will also consider, in
reviewing untimely requests or petitions, set forth in 10 CFR
2.309(c)(1)(i)-(viii).
All documents filed in NRC adjudicatory proceedings, including a
request for hearing, a petition for leave to intervene, any motion or
other document filed in the proceeding prior to the submission of a
request for hearing or petition to intervene, and documents filed by
interested governmental entities participating under 10 CFR 2.315(c),
must be filed in accordance with the NRC E-Filing rule, which the NRC
promulgated in August 2007, 72 FR 49139 (Aug. 28, 2007). The E-Filing
process requires participants to submit and serve documents over the
internet or in some cases to mail copies on electronic storage media.
Participants may not submit paper copies of their filings unless they
seek a waiver in accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least
ten (10) days prior to the filing deadline, the petitioner/ requestor
must contact the Office of the Secretary by e-mail at
[email protected], or by calling (301) 415-1677, to request (1) a
digital ID certificate, which allows the participant (or its counsel or
representative) to digitally sign documents and access the E-Submittal
server for any proceeding in which it is participating; and/or (2)
creation of an electronic docket for the proceeding (even in instances
in which the petitioner/requestor (or its counsel or representative)
already holds an NRC-issued digital ID certificate). Each petitioner/
requestor will need to download the Workplace Forms Viewer\TM\ to
access the Electronic Information Exchange (EIE), a component of the E-
Filing system. The Workplace Forms Viewer\TM\ is free and is available
at http://www.nrc.gov/site-help/e-submittals/install-viewer.html.
Information about applying for a digital ID certificate is available on
NRC's public Web site at http://www.nrc.gov/site-help/e-submittals/apply-certificates.html.
Once a petitioner/requestor has obtained a digital ID certificate,
had a docket created, and downloaded the EIE viewer, it can then submit
a request for hearing or petition for leave to intervene. Submissions
should be in Portable Document Format (PDF) in accordance with NRC
guidance available on the NRC public Web site at http://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the
time the filer submits its documents through EIE. To be timely, an
electronic filing must be submitted to the EIE system no later than
11:59 p.m. Eastern Time on the due date. Upon receipt of a
transmission, the E-Filing system time-stamps the document and sends
the submitter an e-mail notice confirming receipt of the document. The
EIE system also distributes an e-mail notice that provides access to
the document to the NRC Office of the General Counsel and any others
who have advised the Office of the Secretary that they wish to
participate in the proceeding, so that the filer need not serve the
documents on those participants separately. Therefore, applicants and
other participants (or their counsel or representative) must apply for
and receive a digital ID certificate before a hearing request/petition
to intervene is filed so that they can obtain access to the document
via the E-Filing system.
A person filing electronically may seek assistance through the
``Contact Us'' link located on the NRC Web site at http://www.nrc.gov/site-help/e-submittals.html or by calling the NRC technical help line,
which is available between 8:30 a.m. and 4:15 p.m., Eastern Time,
Monday through Friday. The help line number is (800) 397-4209 or
locally, (301) 415-4737. Participants who believe that they have a good
cause for not submitting documents electronically must file a motion,
in
[[Page 71702]]
accordance with 10 CFR 2.302(g), with their initial paper filing
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, Sixteenth
Floor, One White Flint North, 11555 Rockville Pike, Rockville,
Maryland, 20852, Attention: Rulemaking and Adjudications Staff.
Participants filing a document in this manner are responsible for
serving the document on all other participants. Filing is considered
complete by first-class mail as of the time of deposit in the mail, or
by courier, express mail, or expedited delivery service upon depositing
the document with the provider of the service.
Documents submitted in adjudicatory proceedings will appear in
NRC's electronic hearing docket which is available to the public at
http://ehd.nrc.gov/EHD_Proceeding/home.asp, unless excluded pursuant
to an order of the Commission, an Atomic Safety and Licensing Board, or
a Presiding Officer. Participants are requested not to include personal
privacy information, such as social security numbers, home addresses,
or home phone numbers in their filings. With respect to copyrighted
works, except for limited excerpts that serve the purpose of the
adjudicatory filings and would constitute a Fair Use application,
participants are requested not to include copyrighted materials in
their submissions.
The Commission will issue a notice or order granting or denying a
hearing request or intervention petition, designating the issues for
any hearing that will be held and designating the Presiding Officer. A
notice granting a hearing will be published in the Federal Register and
served on the parties to the hearing.
As an alternative to petitions to intervene and requests for
hearing, within 30 days from the date of publication of this notice,
persons may submit written comments regarding the indirect license
transfer application, as provided for in 10 CFR 2.1305. The Commission
will consider and, if appropriate, respond to these comments, but such
comments will not otherwise constitute part of the decisional record.
Comments should be submitted to the Secretary, U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, Attention: Rulemakings and
Adjudications Staff, and should cite the publication date and page
number of this Federal Register notice.
For further details with respect to this indirect license transfer
application, see the application dated October 3, 2008, available for
public inspection at the Commission's Public Document Room (PDR),
located at One White Flint North, Public File Area O1 F21, 11555
Rockville Pike (first floor), Rockville, Maryland. Publicly available
records will be accessible electronically from the Agency wide
Documents Access and Management System's (ADAMS) Public Electronic
Reading Room on the Internet at the NRC Web site, http://www.nrc.gov/reading-rm/adams.html. Persons who do not have access to ADAMS or who
encounter problems in accessing the documents located in ADAMS should
contact the NRC PDR Reference staff by telephone at 1-800-397-4209, or
301-415-4737, or by e-mail to [email protected].
Attorneys for applicants: Daniel F. Stenger, Hogan & Hartson LLP,
555 Thirteenth Street, NW., Washington, DC 20004, tel: 202-637-5691, e-
mail: [email protected] (counsel for CENG); and John O'Neill,
Pillsbury Winthrop Shaw Pittman LLP, 2300 N Street, NW., Washington, DC
20037, telephone 202-663-8148, e-mail: john.o'[email protected]
(counsel for MEHC).
Dated at Rockville, Maryland, this, 19th day of November 2008.
For The Nuclear Regulatory Commission.
Douglas V. Pickett,
Senior Project Manager, Plant Licensing Branch I-1, Division of
Operating Reactor Licensing, Office of Nuclear Reactor Regulation.