NUCLEAR REGULATORY COMMISSION
Correction to Notice of Availability of Draft Generic
Environmental Impact Statement for In-Situ Leach Uranium Milling
Facilities
AGENCY: Nuclear Regulatory Commission.
ACTION: Correction to Notice of Availability.
-----------------------------------------------------------------------
SUMMARY: On July 28, 2008, the U.S. Nuclear Regulatory Commission (NRC)
issued a notice for public comment of a Draft Generic Environmental
Impact Statement (Draft GEIS) that identifies and evaluates on a
programmatic basis, the potential environmental impacts from the
construction, operation, aquifer restoration, and decommissioning at
in-situ leach (ISL) uranium milling facilities located in particular
regions of the western United States (73 FR 43795).
In that notice, the NRC also provided information on eight public
meetings to be hosted by the NRC that would allow the NRC staff to
present an overview of the Draft GEIS and to accept oral and written
public comments on the Draft GEIS from interested members of the
public. Corrected dates and associated information is provided below
for two of those meetings:
Meeting Date: September 23, 2008, 7 p.m. to 9:30 p.m.
Meeting Location: Best Western Tower West Lodge, 109 North U.S.
Highway 14 & 16, Gillette, WY 82716, Phone (307) 686-2210.
Meeting Date: September 25, 2008, 7 p.m. to 9:30 p.m.
Meeting Location: Best Western Ramkota Hotel, 800 N. Poplar Road,
Casper, WY 82601, Phone (307) 266-6000.
For each meeting, members of the NRC staff will be available for
informal discussions with members of the public from 6 p.m. to 7 p.m.
The formal meeting and associated NRC presentation will begin at 7 p.m.
Interested persons may register to speak at the meetings. Depending on
the number of speakers for a meeting, each speaker may be limited in
the amount of time allocated for their comments so that all speakers
will have an opportunity to offer comments.
DATES: The public comment period on the Draft GEIS began on July 28,
2008, and continues until October 7, 2008. Written comments should be
submitted as described in the ADDRESSES section of this notice. The NRC
will consider comments received or postmarked after that date to the
extent practical.
ADDRESSES: Members of the public are invited and encouraged to submit
comments on the Draft GEIS to the Chief, Rulemaking, Directives, and
Editing Branch, Mailstop: T6-D59, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001. The NRC encourages comments submitted
electronically to be sent to [email protected]. Please include
``Uranium Recovery GEIS'' in the subject line when submitting written
comments.
FOR FURTHER INFORMATION CONTACT: For general information on the NRC's
NEPA process, or the environmental review process related to the Draft
GEIS, please contact James Park, Project Manager, Division of Waste
Management and Environmental Protection (DWMEP), Mail Stop T-8F5, U.S.
Nuclear Regulatory Commission, Washington DC 20555-001, by phone at 1
(800) 368-5642, extension 6935. For general or technical information
associated with the safety and licensing of uranium milling facilities,
please contact William Von Till, Branch Chief, Uranium Recovery Branch,
DWMEP, Mail Stop T-8F5, U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001, by phone at 1 (800) 368-5642, extension 0598.
The Draft GEIS may be accessed on the Internet at www.nrc.gov/reading-rm/doc-collections/nuregs/staff/ by selecting ``NUREG-1910.''
Additionally, the NRC maintains an Agencywide Documents Access and
Management System (ADAMS), which provides text and image files of the
NRC's public documents. The Draft GEIS and its appendices may also be
accessed through the NRC's Public Electronic Reading Room on the
Internet at:
[[Page 54436]]
www.nrc.gov/reading-rm/adams.html. If you either do not have access to
ADAMS or if there is a problem accessing documents located in ADAMS,
contact the NRC Public Document Room (PDR) reference staff at 1 (800)
397-4209, 1 (301) 415-4737 or by e-mail to [email protected].
Information and documents associated with the Draft GEIS are also
available for public review through the NRC Public Electronic Reading
Room on the Internet at www.nrc.gov/reading-rm/adams.html and at the
NRC's Web site for the GEIS, www.nrc.gov/materials/fuel-cycle-fac/licensing/geis.html. Both information and documents associated with the
Draft GEIS also are available for inspection at the Commission's Public
Document Room, U.S. NRC's Headquarters Building, 11555 Rockville Pike
(first floor), Rockville, Maryland. For those without access to the
Internet, paper copies of any electronic documents may be obtained for
a fee by contacting the NRC's Public Document Room at 1-800-397-4209.
The draft GEIS and related documents may also be found at the following
public libraries:
Albuquerque Main Library, 501 Copper NW, Albuquerque, New Mexico 87102,
505-768-5141,
Mother Whiteside Memorial Library, 525 West High Street, Grants, New
Mexico 87020, 505-287-4793,
Octavia Fellin Public Library, 115 W Hill Avenue, Gallup, New Mexico
87301, 505-863-1291,
Natrona County Public Library, 307 East Second Street, Casper, Wyoming
82601, 307-332-5194,
Carbon County Public Library, 215 W Buffalo Street, Rawlins, Wyoming
82301, 307-328-2618,
Campbell County Public Library, 2101 South 4J Road, Gillette, Wyoming
82718, 307-687-0009,
Weston County Library, 23 West Main Street, Newcastle, Wyoming 82701,
307-746-2206,
Chadron Public Library, 507 Bordeaux Street, Chadron, Nebraska 69337,
308-432-0531,
Rapid City Public Library, 610 Quincy Street, Rapid City, South Dakota
57701, 605-394-4171.
SUPPLEMENTARY INFORMATION: As stated previously, the NRC is accepting
comments on the Draft GEIS. Following the end of the public comment
period, the NRC staff will publish a Final GEIS that addresses, as
appropriate, the public comments on the Draft GEIS. The NRC expects to
publish the Final GEIS by June 2009.
Dated at Rockville, Maryland, this 15th day of September 2008.
For the U.S. Nuclear Regulatory Commission.
Patrice M. Bubar,
Deputy Director, Environmental Protection and Performance Assessment
Directorate, Division of Waste Management and Environmental Protection,
Office of Federal and State Materials and Environmental Management
Programs.
[FR Doc. E8-21908 Filed 9-18-08; 8:45 am]