DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2008-0848]
Drawbridge Operation Regulation; Harlem River, New York City, NY,
Maintenance
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, First Coast Guard District, has issued a
temporary deviation from the regulation governing the operation of the
Triborough (125 Street) Bridge across the Chelsea River, mile 1.3, at
New York City, New York.
[[Page 52925]]
Under this temporary deviation the bridge may remain in the closed
position for four months to facilitate bridge maintenance. A three-week
advance notice for openings will be available to allow vessel traffic
that can not pass under the closed draw to transit.
DATES: This deviation is effective from September 5, 2008 through
December 31, 2008.
ADDRESSES: Documents indicated in this preamble as being available in
the docket are part of docket USCG-2008-0848 and are available online
at http://www.regulations.gov. They are also available for inspection
or copying at two locations: The Docket Management Facility (M-30),
U.S. Department of Transportation, West Building Ground Floor, Room
W12-140, 1200 New Jersey Avenue, SE., Washington, DC 20590, between 9
a.m. and 5 p.m., Monday through Friday, except Federal holidays, and
the First Coast Guard District, Bridge Branch Office, 408 Atlantic
Avenue, Boston, Massachusetts 02110, between 7 a.m. and 3 p.m., Monday
through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
deviation, call Joe Arca, Project Officer, First Coast Guard District,
at (212) 668-7165. If you have questions on viewing the docket, call
Renee V. Wright, Program Manager, Docket Operations, telephone (202)
366-9826.
SUPPLEMENTARY INFORMATION: The Triborough (125 Street) Bridge, across
the Harlem River at mile 1.3, has a vertical clearance in the closed
position of 54 feet at mean high water and 59 feet at mean low water.
The existing regulations are listed at 33 CFR 117.789(d).
The owner of the bridge, the Triborough Bridge & Tunnel Authority
(TBTA), requested this temporary deviation to facilitate bridge
maintenance.
Habitual users of the waterway normally can transit under the
Triborough (125 Street) Bridge without requesting a bridge opening due
to the size of the vessel traffic that frequently transits this
waterway and the ample vertical clearance provided by the bridge in the
closed position.
The Willis Avenue Bridge which is also located on the Harlem River
upstream from the Triborough (125 Street) Bridge is presently
undergoing replacement construction. As a result, construction crane
barges occasionally will need to transit through the Triborough (125
Street) Bridge to facilitate the ongoing upstream construction. The
contractor working on the Triborough (125 Street) Bridge has agreed to
open the bridge for the passage of the crane barges, provided at least
a three-week advance notice is given by calling the bridge owner at
(212) 870-6470 or (212) 870-6428.
Under this temporary deviation the Triborough (125 Street) Bridge
may remain in the closed position at all times; except that, the bridge
shall open on signal after at least a three-week notice is given by
calling (212) 870-6470 or (212) 870-6428.
In accordance with 33 CFR 117.35(e), the bridge must return to its
regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: September 1, 2008.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.