[Federal Register Volume 73, Number 175 (Tuesday, September 9, 2008)]
[Notices]
[Pages 52426-52429]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: E8-20997]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-243; EA-08-251]
In the Matter of: Oregon State University (Oregon State
University TRIGA Reactor); Order Modifying Facility Operating License
No. R-106
I
Oregon State University (the licensee) is the holder of Facility
Operating License No. R-106 (the license), issued by the U.S. Nuclear
Regulatory Commission (NRC). The NRC plans to renew the license on
September 10, 2008. The license authorizes operation of the Oregon
State University TRIGA Reactor (the facility) at a power level up to
1,100 kilowatts thermal and in the pulse mode, with reactivity
insertions not to exceed $2.55, and to receive, possess, and use
special nuclear material associated with facility operation. The
facility is a research reactor located on the campus of Oregon State
University, in the city of Corvallis, Benton County, Oregon. The
mailing address is Radiation Center, Oregon State University, 100
Radiation Center, Corvallis, Oregon 97331-5903.
II
Title 10 of the Code of Federal Regulations (10 CFR) Section 50.64,
limits the use of high-enriched uranium (HEU) fuel in domestic non-
power reactors (research and test reactors) (see 51 FR 6514). The
regulation, which became effective on March 27, 1986, requires that if
Federal Government funding for conversion-related costs is available,
each licensee of a non-power reactor authorized to use HEU fuel shall
replace it with low-enriched uranium (LEU) fuel acceptable to the
Commission unless the Commission has determined that the reactor has a
unique purpose. The Commission's stated purpose for these requirements
was to reduce, to the maximum extent possible, the use of HEU fuel in
order to reduce the risk of theft and diversion of HEU fuel used in
non-power reactors.
[[Page 52427]]
Paragraphs 50.64(b)(2)(i) and (ii) require that a licensee of a
non-power reactor (1) not acquire more HEU fuel if LEU fuel that is
acceptable to the Commission for that reactor is available when the
licensee proposes to acquire HEU fuel, and (2) replace all HEU fuel in
its possession with available LEU fuel acceptable to the Commission for
that reactor in accordance with a schedule determined pursuant to 10
CFR 50.64(c)(2).
Paragraph 50.64(c)(2)(i) requires, among other things, that each
licensee of a non-power reactor authorized to possess and to use HEU
fuel develop and submit to the Director of the Office of Nuclear
Reactor Regulation (the Director) by March 27, 1987, and at 12-month
intervals thereafter, a written proposal for meeting the requirements
of the rule. The licensee shall include in its proposal a certification
that Federal Government funding for conversion is available through the
U.S. Department of Energy or other appropriate Federal agency. The
proposal should also provide a schedule for conversion, based upon the
availability of replacement fuel acceptable to the Commission for that
reactor and upon consideration of other factors such as the
availability of shipping casks, implementation of arrangements for
available financial support, and reactor usage.
Paragraph 50.64(c)(2)(iii) requires the licensee to include in the
proposal, to the extent required to effect conversion, all necessary
changes to the license, the facility, and licensee procedures. This
paragraph also requires the licensee to submit supporting safety
analyses in time to meet the conversion schedule.
Paragraph 50.64(c)(2)(iii) also requires the Director to review the
licensee proposal, to confirm the status of Federal Government funding,
and to determine a final schedule, if the licensee has submitted a
schedule for conversion.
Section 50.64(c)(3) requires the Director to review the supporting
safety analyses and to issue an appropriate enforcement order directing
both the conversion and, to the extent consistent with the protection
of public health and safety, any necessary changes to the license, the
facility, and licensee procedures. In the Federal Register notice of
the final rule (51 FR 6514), the Commission explained that in most, if
not all cases, the enforcement order would be an order to modify the
license under 10 CFR 2.204 (now 10 CFR 2.202).
Any person, other than the licensee, whose interest may be affected
by this proceeding and who desires to participate as a party must file
a written request for hearing or petition for leave to intervene
meeting the requirements of 10 CFR 2.309, ``Hearing Requests, Petitions
to Intervene, Requirements for Standing, and Contentions.''
III
The U.S. Nuclear Regulatory Commission (NRC) maintains the
Agencywide Documents Access and Management System (ADAMS), which
provides text and image files of the NRC's public documents. On
November 6, 2007, the licensee submitted its conversion proposal (ADAMS
Accession No. ML080420546), which was supplemented on February 11, and
June 20, 2008 (ADAMS Accession Nos. ML080730057 and ML082350345),
including its proposed modifications and supporting safety analyses.
HEU fuel elements are to be replaced with LEU fuel elements. The
reactor core contains fuel elements of the TRIGA design, with the fuel
consisting of uranium-zirconium hydride with 30 weight percent uranium.
These fuel elements contain the uranium-235 isotope at an enrichment of
less than 20 percent. The NRC staff reviewed the licensee's proposal
and the requirements of 10 CFR 50.64 and has determined that public
health and safety and common defense and security require the licensee
to convert the facility from the use of HEU to LEU fuel in accordance
with the attachments to this Order and the schedule included herein.
The attachments to this Order specify the changes to the license
conditions and technical specifications that are needed to amend the
facility license and contain an outline of a reactor startup report to
be submitted to NRC within 6 months following return of the converted
reactor to normal operation.
IV
Accordingly, pursuant to Sections 51, 53, 57, 101, 104, 161b, 161i,
and 161o of the Atomic Energy Act of 1954, as amended, and to
Commission regulations in 10 CFR 2.202 and 10 CFR 50.64, it is hereby
ordered that:
Facility Operating License No. R-106 is modified by amending the
license conditions and technical specifications as stated in the
attachments to this Order (Attachment 1: MODIFICATIONS TO FACILITY
OPERATING LICENSE No. R-106; Attachment 2: OUTLINE OF REACTOR STARTUP
REPORT). The Order becomes effective on the later date of either (1)
the day the licensee receives an adequate number and type of LEU fuel
elements to operate the facility as specified in the licensee proposal
dated November 6, 2007 (ADAMS Accession No. ML080420546), as
supplemented on February 11, and June 20, 2008 (ADAMS Accession Nos.
ML080730057 and ML082350345), or (2) 20 days after the date of
publication of this Order in the Federal Register.
V
Pursuant to 10 CFR 2.202, any person(s) whose interest may be
affected by this proceeding, other than the licensee, and who wishes to
participate as a party in the proceeding must file a written request
within 20 days after the date of publication of this Order, setting
forth with particularity the manner in which this Order adversely
affects his or her interest and addressing the criteria set forth in 10
CFR 2.309. If a hearing is held, the issue to be considered at such
hearing shall be whether this Order should be sustained.
A request for a hearing must be filed in accordance with the NRC E-
Filing rule, which became effective on October 15, 2007. The NRC issued
the E-filing final rule on August 28, 2007 (72 FR 49139), and codified
it in pertinent part at 10 CFR part 2, ``Rules of Practice for Domestic
Licensing Proceedings and Issuance of Orders,'' subpart B. The E-Filing
process requires participants to submit and serve documents over the
Internet or, in some cases, to mail copies on electronic optical
storage media. Participants may not submit paper copies of their
filings unless they seek a waiver in accordance with the procedures
described below.
To comply with the procedural requirements associated with E-
Filing, at least 10 days before the filing deadline, the requestor must
contact the Office of the Secretary by e-mail at [email protected],
or by calling (301) 415-1677, to request (1) a digital identification
(ID) certificate, which allows the participant (or its counsel or
representative) to digitally sign documents and access the E-Submittal
server for any NRC proceeding in which it is participating, and/or (2)
creation of an electronic docket for the proceeding (even in instances
when the requestor (or its counsel or representative) already holds an
NRC-issued digital ID certificate). Each requestor will need to
download the Workplace Forms Viewer\TM\ to access the Electronic
Information Exchange (EIE), a component of the E-Filing system. The
Workplace Forms Viewer\TM\ is free and is available at http://www.nrc.gov/site-help/e-submittals/install-viewer.html. Information
about applying for a digital ID certificate also is available on the
NRC's public Web site at http://
[[Page 52428]]
www.nrc.gov/site-help/e-submittals/apply-certificates.html.
Once a requestor has obtained a digital ID certificate, had a
docket created, and downloaded the EIE viewer, he or she can then
submit a request for a hearing through EIE. Submissions should be in
portable document format (PDF) in accordance with NRC guidance
available on the NRC public Web site at http://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the time the filer
submits its document through EIE. To be timely, electronic filings must
be submitted to the EIE system no later than 11:59 p.m. eastern time on
the due date. Upon receipt of a transmission, the E-Filing system time-
stamps the document and sends the submitter an e-mail notice confirming
receipt of the document. The EIE system also distributes an e-mail
notice that provides access to the document to the NRC Office of the
General Counsel and any others who have advised the Office of the
Secretary that they wish to participate in the proceeding, so that the
filer need not serve the document on those participants separately.
Therefore, any others who wish to participate in the proceeding (or
their counsel or representative) must apply for and receive a digital
ID certificate before a hearing request is filed so that they may
obtain access to the document via the E-Filing system.
A person filing electronically may seek assistance through the
``Contact Us'' link located on the NRC Web site at http://www.nrc.gov/site-help/e-submittals.html or by calling the NRC technical help line,
which is available between 8:30 a.m. and 4:15 p.m., eastern time,
Monday through Friday. The help line number is (800) 397-4209 or,
locally, (301) 415-4737.
Participants who believe that they have good cause for not
submitting documents electronically must file a motion, in accordance
with 10 CFR 2.302(g), with their initial paper filing requesting
authorization to continue to submit documents in paper format. Such
filings must be submitted by (1) first-class mail addressed to the
Office of the Secretary of the Commission, U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, Attention: Rulemaking and
Adjudications Staff; or (2) courier, express mail, or expedited
delivery service to the Office of the Secretary, Sixteenth Floor, One
White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852,
Attention: Rulemaking and Adjudications Staff. Participants filing a
document in this manner are responsible for serving the document on all
other participants. Filing is considered complete by first-class mail
as of the time of deposit in the mail, or by courier, express mail, or
expedited delivery service upon depositing the document with the
provider of the service.
Documents submitted in adjudicatory proceedings will appear in the
NRC's electronic hearing docket at http://ehd.nrc.gov/EHD_Proceeding/home.asp, unless excluded pursuant to an order of the Commission, an
Atomic Safety and Licensing Board, or a Presiding Officer. Participants
are requested not to include personal privacy information, such as
social security numbers, home addresses, or home phone numbers, in
their filings. With respect to copyrighted works, except for limited
excerpts that serve the purpose of the adjudicatory filings and would
constitute a fair use application, participants are requested not to
include copyrighted materials in their works.
If a hearing is requested and the request is granted by the
Commission, the NRC will issue an order designating the time and place
of the hearing.
In the absence of any request for hearing, the provisions as
specified in Section IV shall be final twenty (20) days after the date
of publication of this Order in the Federal Register.
In accordance with 10 CFR 51.10(d) this Order is not subject to
Section 102(2) of the National Environmental Policy Act, as amended.
The NRC staff notes, however, that with respect to environmental
impacts associated with the changes imposed by this Order as described
in the safety evaluation, the changes would, if imposed by other than
an order, meet the definition of a categorical exclusion in accordance
with 10 CFR 51.22(c)(9). Thus, pursuant to either 10 CFR 51.10(d) or
51.22(c)(9), no environmental assessment or environmental impact
statement is required.
Detailed guidance which the NRC uses to review applications from
research reactor licensees appears in NUREG-1537, ``Guidelines for
Preparing and Reviewing Applications for the Licensing of Non-Power
Reactors,'' February 1996, which can be obtained from the Commission's
Public Document Room (PDR). The public may also access NUREG-1537
through the NRC's Public Electronic Reading Room on the Internet at
http://www.nrc.gov/reading-rm/adams.html under ADAMS Accession Nos.
ML0412430055 for part one and ML042430048 for part two.
For further information see the application from the licensee dated
November 6, 2007 (ADAMS Accession No. ML080420546), as supplemented on
February 11, and June 20, 2008 (ADAMS Accession Nos. ML080730057 and
ML082350345), the NRC staff's requests for additional information
(ADAMS Accession Nos. ML080090308 and ML081050294), and the cover
letter to the licensee and the staff's safety evaluation dated
September 4, 2008, (ADAMS Accession No. ML082390775). On April 4, 2008,
the NRC staff issued an Order to the licensee to allow receipt and
possession of the special nuclear material needed for the conversion
(ADAMS Accession No. ML080730395). These documents are available for
public inspection at the Commission's Public Document Room (PDR),
located at One White Flint North, Public File Area O1 F21, 11555
Rockville Pike (first floor), Rockville, Maryland. Publicly available
records will be accessible electronically from the Public Electronic
Reading Room at http://www.nrc.gov/reading-rm/adams.html. Persons who
do not have access to ADAMS or who have problems accessing the
documents in ADAMS should contact the NRC PDR reference staff by
telephone at (800) 397-4209 or (301) 415-4737 or by e-mail to
[email protected].
Dated this 4th day of September 2008.
For the Nuclear Regulatory Commission
James T. Wiggins,
Deputy Director, Office of Nuclear Reactor Regulation.
ATTACHMENT 1--Modifications to Facility Operating License NO. R-106
A. License Conditions Revised by This Order
2.B.(2) Pursuant to the Act and 10 CFR part 70, ``Domestic
Licensing of Special Nuclear Material,''
a. To receive, possess and use, in connection with operation of
the facility, up to 16.30 kilograms of contained uranium-235
enriched to less than 20 percent in the form of TRIGA reactor fuel;
b. To receive, possess and use, in connection with operation of
the facility, up to 100 grams of contained uranium-235 of any
enrichment in the form of fission chambers and flux foils;
c. To receive, possess, but not use, up to 656 grams of uranium-
235 enriched to less than 20 percent in the form of the core from
the AGN-201 reactor;
d. To receive, possess, use, but not separate, in connection
with operation of the facility, such special nuclear material as may
be produced by operation of the facility; and
e. To possess, but not use, up to 12.83 kilograms of contained
uranium-235 at equal to or greater than 20 percent enrichment in the
form of TRIGA fuel until the existing inventory of this fuel is
removed from the facility.
2.C.(2) Technical Specifications
The Technical Specifications contained in Appendix A, as revised
through Amendment No. 22, are hereby incorporated in the license.
The licensee shall operate the facility
[[Page 52429]]
in accordance with the Technical Specifications.
ATTACHMENT 2--Outline of Reactor Startup Report
Within 6 months following the return of the converted reactor to
normal operation, submit the following information to the NRC.
Information on the HEU core should be presented to the extent it
exists.
1. Critical mass:
Measurement with HEU;
Measurement with LEU;
Comparisons with calculations for LEU and if available, HEU.
2. Excess (operational) reactivity:
Measurement with HEU;
Measurement with LEU;
Comparisons with calculations for LEU and if available, HEU.
3. Control rod calibrations:
Measurement of HEU and LEU rod worths and comparisons with
calculations for LEU and if available, HEU.
4. Reactor power calibration:
Methods and measurements that ensure operation within the
license limit and comparison between HEU and LEU nuclear
instrumentation set points, detector positions and detector output.
5. Shutdown margin:
Measurement with HEU;
Measurement with LEU;
Comparisons with calculations for LEU and if available, HEU.
6. Thermal neutron flux distributions:
Measurements of the core and measured experimental facilities
(to the extent available) with HEU and LEU and comparisons with
calculations for LEU and if available, HEU.
7. Reactor physics measurements:
Results of determination of LEU effective delayed neutron
fraction, temperature coefficient, and void coefficient to the
extent that measurements are possible and comparison with
calculations and available HEU core measurements.
8. Initial LEU core loading:
Measurements made during initial loading of the LEU fuel,
presenting subcritical multiplication measurements, predictions of
multiplication for next fuel additions, and prediction and
verification of final criticality conditions.
9. Primary coolant measurements:
Results of any primary coolant water sample measurements for
fission product activity taken during the first 30 days of LEU
operation.
10. Results of any test pulses performed and comparison with
calculations and available HEU core measurements.
11. Discussion of results:
Discussion of the comparison of the various results including an
explanation of any significant differences that could affect normal
operation and accident analyses.